Ok so random question, I’m looking to rent one of these (75-2 or 75-3 not sure which it is) to spread driveway base, 4” clean stone, then top it with 3” minus, how long would it take an inexperienced operator to spread a full load (22 ton), I do have experience running a Kubota kx-033 excavator but obviously it’s a different machine. I’m trying to time the delivery of the loads of stone from the quarry as there is no where to dump the stone, so I have to have it spread before the next load arrives. Thanks!