5D BIM (Cost/Quantities) in Revit! 

Aussie BIM Guru
Подписаться 48 тыс.
Просмотров 32 тыс.
50% 1

Опубликовано:

 

26 авг 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 76   
@amrutpatil6234
@amrutpatil6234 2 года назад
Thank you so much... it helps a lot. very less material available on internet regarding 5D, your work appreciable. Love from India.
@AussieBIMGuru
@AussieBIMGuru 2 года назад
You're welcome, I'm glad it was helpful Amrut :)
@amrutpatil6234
@amrutpatil6234 2 года назад
@@AussieBIMGuru keep it up Sir 👏
@danielkrajnik3817
@danielkrajnik3817 3 года назад
It would be interesting to see how those schedules are further handled by the contractors, maybe some overview of solutions for construction and BOM management. As always great content!
@AussieBIMGuru
@AussieBIMGuru 3 года назад
Often there is a disconnect at this stage as they aren't often using the models themselves, but rather the extracted output (schedules, tables, exports etc.). I have worked with a few builders that actually used Revit also and it was great, they were much more demanding of model quality but the collaboration was so much more efficient.
@marianaarodrigues1
@marianaarodrigues1 3 года назад
Interesting video. I was aware of the methods, but still unable to surpass the limitations of Revit scheduling for precise take-offs. I understand that sometimes that might not be the architects role, but in Portugal we are in fact expected to provide a full list of quantities with quite a lot of detail. Obviously there is an associated margin of error, but most of the elements are measured using that last method which becomes quite challenging, as it influences heavily on how you model the building. I've been trying to achieve some pre-defined schedules for that moment and a system of naming and modelling that would suit that goal, but like you said there is still a lot of trial and error before getting it right. There is no magic button!
@AussieBIMGuru
@AussieBIMGuru 3 года назад
Yes it can be a serious challenge, especially because most firms don't seem to care how it's done, and often just manually measure drawings or don't QA the data properly. There are other platforms out there like costx and presto but the issue as you identified always comes back to model accuracy and precision of how programs measure.
@MrMizahell
@MrMizahell 3 года назад
Thank you very much! Well structured video.
@AussieBIMGuru
@AussieBIMGuru 3 года назад
You're welcome!
@tokevin3026
@tokevin3026 3 года назад
Thank you for sharing. I love it!
@AussieBIMGuru
@AussieBIMGuru 3 года назад
You're welcome!
@rfvendrame
@rfvendrame 2 года назад
Great video Gavin. Shows very well the possibilities and some limitations of the software. As you said, costX can do some more stuff than revit, but still there are quite a lot of problems coming from the model limitations....
@AussieBIMGuru
@AussieBIMGuru 2 года назад
Yes at the end of the day I promote people getting as much data correct at the source as possible.
@MarkoKoljancic
@MarkoKoljancic 4 года назад
Thanks for creating this videos. Its full of useful informations. You have thumbs up from me!
@AussieBIMGuru
@AussieBIMGuru 4 года назад
You're welcome Marko!
@moegyi2077
@moegyi2077 4 года назад
Nice!! That's what i have been waiting for!! Sorry for late reply i was too busy. Now i am free again.
@AussieBIMGuru
@AussieBIMGuru 4 года назад
No problems Moe, plenty of other topics for me to cover in the meantime :)
@moegyi2077
@moegyi2077 4 года назад
@@AussieBIMGuru sure. Gotta wait more tutorials from you!!
@prosperdongyangjiang472
@prosperdongyangjiang472 3 года назад
mate this is sooo good man so inspiring
@AussieBIMGuru
@AussieBIMGuru 3 года назад
Glad you liked it!
@prosperdongyangjiang472
@prosperdongyangjiang472 3 года назад
@@AussieBIMGuru oh yeh one of the best mate. I am based in Canberra where you based? Can we trade insta or fb or maybe digits>
@AussieBIMGuru
@AussieBIMGuru 3 года назад
@@prosperdongyangjiang472 i'm based in sydney. I don't really use those platforms but i have an email on my YT profile i can be contacted by or via LinkedIn.
@prosperdongyangjiang472
@prosperdongyangjiang472 3 года назад
@@AussieBIMGuru brilliant I will send you an email to say hello now if you dont mind.
@prosperdongyangjiang472
@prosperdongyangjiang472 3 года назад
@@AussieBIMGuru hey mate. I could not find your email. could you please let me know your email?
@Giutti22
@Giutti22 4 года назад
Wow this is amazing!
@AussieBIMGuru
@AussieBIMGuru 4 года назад
Glad you liked!
@rivesconsulttutorials3602
@rivesconsulttutorials3602 4 года назад
Great video! Informative and really good explanation of working with schedules. 👍🏽
@AussieBIMGuru
@AussieBIMGuru 4 года назад
Thanks, glad you enjoyed!
@nebiatsentayehu5303
@nebiatsentayehu5303 4 года назад
nice one too thanks for educating us in a fun way and actually u know what our BIM course teacher has recommended this video for us to watch it, and I be like ow he found Aussie (good resource) ;)
@AussieBIMGuru
@AussieBIMGuru 4 года назад
Glad you enjoyed the content! Always nice to hear people are finding out about it in educational groups too :)
@anandjain6779
@anandjain6779 4 года назад
Sir, Please create a informative session on 7D BIM . like on facility management
@AussieBIMGuru
@AussieBIMGuru 4 года назад
I'd check out autodesk university, 7D isn't one of my strong suits currently - Australia doesn't have a lot of it currently. Try this presentation here, the subject matter sounds useful; www.autodesk.com/autodesk-university/class/BIM-Inside-Out-Supporting-Owners-Vision-Smarter-Project-Outcomes-and-FM-2017
@akanbisamson7832
@akanbisamson7832 4 года назад
I love your video
@AussieBIMGuru
@AussieBIMGuru 4 года назад
Thanks!
@zoeliu2477
@zoeliu2477 4 года назад
Would you be able demonstrate another vedio about what would consider to be a good and bad model.! The more i watch your RU-vid, the more i think i have been using Revit incorrectly all these years!!!
@AussieBIMGuru
@AussieBIMGuru 4 года назад
Quite a broad question... typically bad models can have many issues such as warnings, high file size, lots of CAD imports, unorganised, lots of 2D drawing, poor data structure etc. I'll try to think of how I could make a video on the topic though...
@zoeliu2477
@zoeliu2477 4 года назад
No problem, just a thought as i know it takes alot to create a vedio. Thanks.
@AussieBIMGuru
@AussieBIMGuru 4 года назад
@@zoeliu2477 that's OK, I've added it to my list :)
@iftekharkhan8879
@iftekharkhan8879 4 года назад
Hi how r u ..I have one confusion regarding beam is why u create another length and also reporting parameter to that beam...if we just set the unit value to per metre to that beam ..and what about the steel inside beam. then .....??and the last about paint costing? Plz reply me....thanku take care
@AussieBIMGuru
@AussieBIMGuru 4 года назад
I use a reporting parameter as the standard length parameter doesn't take into account coping adjustments. For volume or surface area I'd probably use Dynamo as this can analyse the solid geometry of elements, otherwise you'd need to include a formula with length * cross sectional area of perimeter for volume/face area respectively.
@EngineerObed
@EngineerObed Год назад
Hey Ausie Man, I m in Vanuatu Using revit for a quite long time I do estimate and quantity in the revit as well. But Is quite time consuming for me sometime when setting up and getting up the final cost of a building bim model. I'm curious how to shortcut the process using dynamo. do a tutorial for that plz
@AussieBIMGuru
@AussieBIMGuru Год назад
If you check my dynamo playlist and revit playlist i have a more recent pair of videos about how to preconfigure objects for cost takeoff to power bi. The key is having a good system initially.
@andrewdwight5744
@andrewdwight5744 4 года назад
This is a tough tutorial to do, you clearly have a thorough understanding of the ins and outs of Revit, well done. How long have you been using Revit? Are you self taught?
@AussieBIMGuru
@AussieBIMGuru 4 года назад
Indeed it was, hard to decide what to include and omit - 5D is a beast of a topic to cover and teach. I've been using Revit for about 10 years now, pretty much picked it up on my first day on the job and went from there. Most of what I know is self taught, but I've learnt from tips by others here and there for some of the more complex things! These days I'd say I learn 100% from trial/error and experimentation.
@ksnjos001
@ksnjos001 3 года назад
Thats the best way to learn anything its self taught cause most ppl yiu meet are not good teachers. They can be good workers or designers but they can't relay what they do to others very much liie zombies or robots or CAD monkeys...
@iftekharkhan8879
@iftekharkhan8879 4 года назад
By the way I think we can't create reporting parameter to system familes that's why when increase or decrease the length of wall its wil automatically update in costing am I right? And that's why u create rep parameter to that beam is it's correct plz tell me??
@AussieBIMGuru
@AussieBIMGuru 4 года назад
No i create it for beams as the length parameter is to the end of the joint so it doesnt factor in cutbacks for start/end offset.
@archgyanrevit
@archgyanrevit 4 года назад
What exactly is a reporting parameter? What happens if you untick that option?
@AussieBIMGuru
@AussieBIMGuru 4 года назад
Reporting parameters typically just report their value for use in formulae, whilst non-reporting parameters have the ability to adjust and drive constraints. In the case of the beam, I use this as the beam is already driven by its reference planes, but I want to report the length as a parameter so I can use it in a formula to drive the beam cost parameter. There's a good summary here; knowledge.autodesk.com/support/revit-products/learn-explore/caas/CloudHelp/cloudhelp/2016/ENU/Revit-Model/files/GUID-DBC31A77-813A-47E0-8EFA-B6D821F75EDB-htm.html
@ukasha47
@ukasha47 2 года назад
What about labour cost, equipment cost, labour productivity, equipment hourly rates, manpower needed, cash flow etc......
@AussieBIMGuru
@AussieBIMGuru 2 года назад
That comes down to a business, which usually drives those rates. Typically you would factor these into the rate cost or create a separate parameter to relate to a suitable metric. You wont find those rates from a public database or resource as each market and supplier will vary.
@ukasha47
@ukasha47 2 года назад
@@AussieBIMGuru my question is" i have that data with me, how to link that data to model in a way to achieve Earned value management having a proper S curve of monthly cashflow"
@AussieBIMGuru
@AussieBIMGuru 2 года назад
@@ukasha47 if the data has to be in Revit then you'll need dedicated type parameters to store data to in all related objects. From there you can either use a tool like Dynamo or BIMLink+excel vlookup matching to introduce the additional data when needed. You'd need to use calculated schedule values to calculate the rates * cost. My preferred method is to export the data to excel with codes to match externally however. I'd suggest for data that detailed you are better exporting it out using Dynamo or similar, and using a dedicated cost platform like costx or bexel to measure and match the rates.
@anandjain6779
@anandjain6779 4 года назад
Sir , its my request to you that Please make a tutorial on 4D BIM as well.
@AussieBIMGuru
@AussieBIMGuru 4 года назад
Eventually I aim to do a navisworks seried and will include 4d/timeliner.
@immi85
@immi85 4 года назад
area/1m/1m didn't see anywhare. can you explain more( how to use in length,area etc.., if possible?
@AussieBIMGuru
@AussieBIMGuru 4 года назад
Im not 100% sure what you mean, do you mean converting units to become unitless in formulae? This is a bit like algebra, look at the unit as a variable (e.g. 4m2 = 4z). As a result the unit can be added or reduced using multiply/divide (e.g. 4z2 / z / z = 4).
@immi85
@immi85 4 года назад
@@AussieBIMGuru so basically we can use for unitless in formula, I will definitely try 👍
@victorayegba4629
@victorayegba4629 4 года назад
I need a BIM for my QS Team in Qatar
@AussieBIMGuru
@AussieBIMGuru 4 года назад
Hi Victor, I'd advise that you research what you need BIM for and the type of classification systems you need to work with first before going in too deep. I'd suggest exploring the Uniclass 2015 framework and cost platforms like Presto or CostX to see which is most suitable to your business' needs.
@shadmandogar7349
@shadmandogar7349 4 года назад
How can I take quantity takeoff of each column beam slab and others level vise and element vise I couldn't takeoff rebar for host nm
@AussieBIMGuru
@AussieBIMGuru 4 года назад
These elements are all schedule-able. Columns and beams can be scheduled by length and/or type, slabs can be scheduled by thickness/surface area and you can use these figures to drive a cost estimation process if you have a table of cost rates to apply. Sometimes I know volume is used as a metric for takeoff vs linear metre so in this case Dynamo could be used to assess solid volume of elements.
@shadmandogar7349
@shadmandogar7349 4 года назад
No I want to know about my rebar quantity floor and level vise with each element . Can you make a video of this . Simple 3 story structure. With all rebar arrange in each element like slab beam column etc. Now you have to find. How much rebar is each host and level taking kindly guide . It would be great
@AussieBIMGuru
@AussieBIMGuru 4 года назад
@@shadmandogar7349 unfortunately I'm not very experienced with the rebar tools yet (I have an architectural background). I would refer to Autodesk University in this case - they may have some presentations on rebar best practices.
@shadmandogar7349
@shadmandogar7349 4 года назад
@@AussieBIMGuru thanks guru I will be waiting for your reply
@fenderirislago
@fenderirislago 3 года назад
Great Video, very interesting. do you have 5D on Revit MEP?
@AussieBIMGuru
@AussieBIMGuru 3 года назад
Unfortunately most of my experience is architectural so I'm not that familiar with 5D for MEP. Some of the methods here may be relevant (e.g. duct by lm rates) however.
@akanbisamson7832
@akanbisamson7832 4 года назад
Which laptop spec is best fit for revit I’m unsung it hard to select
@AussieBIMGuru
@AussieBIMGuru 4 года назад
Hard to say, depends on your price range and what other needs you have. I made a video a few weeks ago showing what laptop I use as well as some general recommendations. I understand your challenge, so many choices out there! Consider looking into the 1080ti graphics range (maybe even 2080) as this apparently works well for Revit/VR/gaming setup.
@just_a_statistic
@just_a_statistic 2 года назад
How can we calculate the formwork and reinforcement cost
@AussieBIMGuru
@AussieBIMGuru 2 года назад
Assuming you know the cost of formwork you can multiply that by the area. Reinforcement would need to be modelled most likely in order to be costed unless you know reinforcement per m3 for elements.
@pepe6943
@pepe6943 4 года назад
Thanks it was really helpful👌 How can we have a cust estimation base on Uniformat or Masterformat?
@AussieBIMGuru
@AussieBIMGuru 4 года назад
You're welcome Pepe! Typically the best way is to either use Assembly codes from Revit objects (takes time) or save a bit of time using the BIM interoperability tools that come with newer versions of Revit - these can apply a Uniclass 2015 system slightly faster. From here a program capable of viewing cost field data in tandem with element quantities/takeoff could do the trick, such as CostX for example which can support tree data structures like Uniclass.
@pepe6943
@pepe6943 4 года назад
@@AussieBIMGuru I have just entered this path, I will try my best to do that, thanks for your guidance🤗
Далее
My 10 Golden Rules for working in Revit!
17:54
Просмотров 23 тыс.
Preparing Revit models for cost/quantity takeoff!
20:15
SPONGEBOB POWER-UPS IN BRAWL STARS!!!
08:35
Просмотров 18 млн
Avaz Oxun - 10 yillik yubiley konsert dasturi 2023
2:52:33
BIM 4D Construction Simulation For Kingdom Tower
3:01
Просмотров 723 тыс.
Aligning Revit models to DWG Surveys
29:41
Просмотров 35 тыс.
Hyperloop Explained
11:55
Просмотров 9 млн
TIME MANAGEMENT TIPS (THAT ACTUALLY WORK)
13:03
Просмотров 713 тыс.
Revit VS ArchiCAD - Which is Better?!?
18:58
Просмотров 231 тыс.
Worksharing in Revit and Central Files
26:11
Просмотров 44 тыс.
Revit Masterclass: Family Creation #1
32:30
Просмотров 75 тыс.
SPONGEBOB POWER-UPS IN BRAWL STARS!!!
08:35
Просмотров 18 млн