We had to wait most of the winter to finish up a surface drainage ditch that had been cut in the field in December. We installed some 12" dual wall corrugated plastic pipe at the end of this surface drainage ditch to outlet it to the main road ditch. We utilized my John Deere 310SE and John Deere 35G Mini Excavator to get this work done. Greg and Rob were helping to finish up this job for Greg.
4 окт 2024