Тёмный

Amazing Machines: A Look at Amtrak Undercutter Ballast Work Crew on Concrete Tie Project 

Dan's Cool Videos
Подписаться 8 тыс.
Просмотров 6 тыс.
50% 1

See how it's done up close in this video of the Amtrak Undercutter
Plasser & Theurer Plasser American RM80 ballast bed cleaning machine using Loram Material Handling Cars and a Brandt R4 Power Unit railcar mover, seen at the end of the video
****Watch my videos of the TLM crew: • Amtrak P-811 MOW Track...
• Gettin It Done: A Look... ****
* • Amazing Machines: A Lo... *
Watch my video of the Undercutter crew at work on a different parr of the track: • Gettin It Done: A Look...
Watch my video as Brandt R4 Power Unit Hi Rail Truck pulls an Amtrak LORAM ballast train to a stop and blows a warning horn for an approaching Amtrak train: • Amtrak LORAM Work Trai... ***
Watch my video of a work crew with a tie crane and a tie remover/inserter working on the track: • Amtrak MOW Work Crew C... ****
**Watch my video of Amtrak locomotives No. 726, an EMD GP38-3 and No. 525, an EMD GP38H-3, with a work train full of concrete ties: • Amtrak Train GP38-3 No... **
Watch my video of the concrete tie clip fasteners being aligned by an Amtrak MOW work crew: • Amtrak MOW Work Crew C... ****
Watch my video of the P-811 TLM going through another area on the Harrisburg Line: • Amtrak P-811 MOW Track...
The Undercutter removes and cleans old ballast from under the track structure and recycles some of the ballast. Later in the project, fresh stone is dropped before the track is brought to final alignment to ensure a smooth surface and correct profile.
Plasser American RM80:
• High screening quality due to self-levelling shaker box with over 30 square yards of screening surface
• Three layer screen design ensures maximum ballast recovery
• Optional crib buster can handle heavily fouled and encrusted ballast bed
• Short set-up and tear-down times maximize track availability
• Innovative cutter bar design allows a consistent cutting depth and slope ensuring a better cleaning result
• Slewable waste discharger conveyer allows to dump waste material on both sides of the track
View my videos of the Amtrak locomotives at the front end of this MOW train:
• Amtrak Train GP38-3 No...
• Amtrak LORAM Work Trai...
From Amtrak regarding service on this section of track: "Train service operates normally before 8 a.m. and after 4 p.m., but between those times no Keystone trains are operating on this stretch. Service runs at normal times all day Friday through Sunday. During lunchtime Monday through Thursday, the Pennsylvanian, which operates between Pittsburgh and New York City, goes through - one train in each direction.
While the work is being done, there’s one track out of service but the other track is being used to move the people doing the work. That track is cleared so the Pennsylvanian can run through during the lunch hour and the Keystone can resume normal service after 4 p.m. until the end of the day Monday through Thursday."
View my Amtrak Train Playlist:
• Amtrak Trains
View my full train playlist with dozens of videos on my channel:
• Trains
(Video by Dan’s Cool Videos)
Thanks for watching. If you liked this video, make sure to subscribe for more!

Опубликовано:

 

27 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 32   
Далее
+1000 Aura For This Save! 🥵
00:19
Просмотров 5 млн
TEAM SPIRIT: НОВЫЙ СОСТАВ. SEASON 24-25
01:31
Worlds First Log Haul with a Diesel Electric Truck!
33:55
CN train track replacement
12:34
Просмотров 2,4 тыс.
FEC Complete ballast maintenance
15:08
Просмотров 261 тыс.
Loram ballast cleaner SBC-35 in action
12:13
Просмотров 82 тыс.