Ever wondered how railroads install new ties? THIS is how its done, and with the use of an entire track gang! We'll get a neat, up close view, of the entire process, while seeing these cool machines hard at work!
Watching new ties get replaced is a neat process. It requires an entire traveling track gang, with an entire crew! In this video, we'll see spike pullers, scrappers, tie inserters, tie pullers, track brooms, ballast regulators, and so much more hard at work! With the use of this cool, heavy equipment, the skilled crews on this track gang make things look easy! Watching this entire process unfold along the railroad tracks was neat!
Instagram: / sd457500
/ sd457500
/ sd457500
#train #diesel #railway
Any use of this content without expressed, clear permission is prohibited. For usage, licensing, and other usage, contact me on Instagram at SD457500.
Copyright 2024 Douglas Hildebrandt, all rights reserved.

Опубликовано:

 

27 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 58   
@richardcarlson582
@richardcarlson582 10 дней назад
I've seen several tie replacement videos and this one is by far the most coherent explanation of how it's done. And that crew were really moving along. Thanks!
@daveschmitt4499
@daveschmitt4499 10 дней назад
@richardcarlson582 . When I worked these 20 years or so ago, we could install around 8000 to 10000 ties a day. This only happens when there are many ties in each mile of track. The more spread out the replacement ties happen to be, the less production you would experience. Walking 15 to 20 miles a day wasn't unheard of with limited tie replacement. Oh and that was when I worked on the wood tie gangs. Concrete tie gangs were so much different. New tracks were laid with a huge machine laying on tie at a time under it, while riding on caterpillar type tracks on the front of the machine and the rear ran on the rail that was being forced onto the ties after they were placed on the ground. The huge machine pulled many flat cars filled with concrete ties.
@danburkland
@danburkland 6 дней назад
Informative as always!
@SD457500
@SD457500 4 дня назад
Glad it was informative, and thanks for watching!
@TomahTrains-s5b
@TomahTrains-s5b 10 дней назад
Great video! Thanks for sharing!
@SD457500
@SD457500 10 дней назад
Thanks for watching, and great to hear that you enjoyed the video!
@docugraf
@docugraf 7 дней назад
On Europe's tracks all the steps are done within one machine
@SD457500
@SD457500 4 дня назад
That they are, but they do the entire railbed, and rails all at once. This just required the replacement of new ties. Those machines over there are cool, but also not made for the heavy duty applications of track in North America. Thanks for the comment, and watching!
@docugraf
@docugraf 4 дня назад
@@SD457500 They're dual-use. sometimes just the small job replacing the ties, otherwise the big work including the tracks
@BattleshipOrion
@BattleshipOrion 9 дней назад
Those tie inserters have so much force, that when the track crew I mentioned some time ago came through, they broke 3 ties in a 150ft span...3 NEW ties....also, as mentioned in my last comment when I came by to read comments, something else kinda maintenance related is that my town is not known for railroad history...CSX kinda changed that, as they donated a 40ft steel sided boxcar ACL 20767 to the Fort Wayne Railroad Historical society...yes, the same people with the NKP 765, and 358. The boxcar was used as a tool car and storage in town for the last 39 years as part of the railroad's maintenance of way department. It sat on a 500ft stretch of abandoned track, the respective switch was taken out after a derailment in the late 70's, early 80's...sometime between then because in what lil' footage of that derailment exists, C40-8w's are used.
@lfeco
@lfeco 10 дней назад
Enjoyed that. Doing this the old way would have been a hard job.
@SD457500
@SD457500 10 дней назад
Doing this the old way would have been a TASK! Thanks for watching!
@daveschmitt4499
@daveschmitt4499 10 дней назад
@lfeco . Trust me. When I first started at a laborer years ago, we worked on a section crew with other section crews helping. We were required to uninstall and completely install 10 ties per man per day. Absolutely, everything was done by hand. The only thing that we did use that would be considered mechanical was track jacks that you carried from location to location, hand jacked to raise the rails. Everything else was manual labor, including spiking
@TonyTruth-s9z
@TonyTruth-s9z 10 дней назад
Best video of the day. I've seen this locally recently.
@SD457500
@SD457500 10 дней назад
Great to hear! Locally as in the Twin Cities? This same track gang is slowly working east; its so cool to see.
@TonyTruth-s9z
@TonyTruth-s9z 10 дней назад
@@SD457500 St. Cloud. The gang has been working on a spur that runs into the western industrial park where the old repair yard and roundhouse once resided.
@marksamuel130
@marksamuel130 8 дней назад
So ancient compared to European systems
@SD457500
@SD457500 4 дня назад
Not really; different type of railroads and items hauled. Railroads in Europe are made for lighter passenger trains, not heavy haul freight trains. While the automation of the equipment over there is cool, it isn't suited for the tonnage and ops that North America has. Thanks for watching!
@kkoch666
@kkoch666 10 дней назад
I bet those machines break all the time. Looks like a lot of maintenance.
@rsinclair6560
@rsinclair6560 21 час назад
Sure do. Hydraulic hoses. You also need to regularly clean engine air filter.
@BruceBergman
@BruceBergman 8 дней назад
Do they have this equipment in 36" narrow Gauge? asking for Disneyland and Knott's and Cedar Fair 7:43 😊
@SD457500
@SD457500 4 дня назад
I'm sure something like this exists for that gauge, or one could modify equipment like this for that application! Thanks for the comment, and watching.
@erict5234
@erict5234 10 дней назад
Every time we have a tie gang scheduled for our area, the same routine happens every time... 1st ballast train comes and dumps new rock, then the regulator clears it, tie gang does their jobs and finally a tamper and regulator finishes the job. (I have never not seen the regulator run ahead of the gang.)
@daveschmitt4499
@daveschmitt4499 10 дней назад
@erict5234 . Must dump rock first because most times a lot of rock either isn't on the track to begin with or the surfacing gang behind the tie gang wouldn't have enough to smooth the track and stabilize it.
@erict5234
@erict5234 10 дней назад
@@daveschmitt4499 correct.
@nataliehilton
@nataliehilton 4 дня назад
You guys in the US are sooooo far behind the rest of the world with access to track machinary. Here in the UK, we use 1 long piece of equipment to lift track, remove old stone and put new stone in place, then lower track and lastly a tamper follows. So instead of 100 people working on the track, we have about 30 working on track replacement.
@SD457500
@SD457500 4 дня назад
While the UK might have that, the size and scale of trains over there are much smaller. Trains in the UK are lighter, and not nearly as long as trains in North America. Its a very different way to approach to railroading, and requires different machines. Appreciate the kind, informative comment, and thanks for watching!
@RyanBenbow
@RyanBenbow 2 дня назад
​@@SD457500We Americans don't Care what the UK thinks. They are a Bloody joke
@rsinclair6560
@rsinclair6560 21 час назад
You better see then how backward we do it in Australia.
@Bob.W.
@Bob.W. 10 дней назад
Thx. What CPKC Subdivision?
@SD457500
@SD457500 10 дней назад
This is on the Withrow Sub, over in NE Mpls. Thanks for watching!
@Bob.W.
@Bob.W. 10 дней назад
@SD457500 Thx. Not familiar with that Sub.
@SD457500
@SD457500 10 дней назад
Think of Shoreham Hill; that area.
@daveschmitt4499
@daveschmitt4499 10 дней назад
@@SD457500. When were they in that area and which direction were they headed
@SD457500
@SD457500 10 дней назад
@@daveschmitt4499 This was last week, and they were heading east. I *think* they are still heading east towards Withrow or down towards Soo Jct.
@daveschmitt4499
@daveschmitt4499 10 дней назад
It's called a Tie Gang
@SD457500
@SD457500 10 дней назад
Appreciate the feedback on the video; I hope you enjoyed it otherwise!
@daveschmitt4499
@daveschmitt4499 10 дней назад
@SD457500 . There was a missing machine. A machine would typically raise the rail so someone or a couple of maintenance of way employees could slide the plates under the rail on each end of the new tie. Back in my day we first used track jacks or pry bars. Then came machines that clamped both rails, a piston jack would raise the rails by pushing down on the ground, then there was a stick like attachment with prongs on the bottom of the stick to place in the spike holes on the outside of the rail to slide the plate under the rail. Then the pistons were released, the clamps unclamped and the machine was either pushed forward to button control, powered forward. And NATURALLY the piece of equipment i showed someone several weeks ago, I can't find now, lol.
@richardbause2453
@richardbause2453 10 дней назад
You skipped the part on how the plates are reinstalled under the rail using the rail lifter . This has to happen "before" spiking can begin. 😮
@SD457500
@SD457500 9 дней назад
Whoooops, I appear to have missed one of the machines. You can see the plates being placed with the track broom though. Hope you enjoyed the video, and thanks for watching!
@richardbause2453
@richardbause2453 9 дней назад
@@SD457500 The guys walking along pickup the plates and set on end of the ties, the rail lifter follows behind them. Those guys lift up the rails and slide the plates under, then comes the spikers.
@rsinclair6560
@rsinclair6560 21 час назад
I also enjoy the old gandy dancing documentaries as a comparison.
@daveschmitt4499
@daveschmitt4499 17 часов назад
@rsinclair6560 @rsinclair6560 . I agree with most of what you said. Steel ties are basically added to make the gauge of the track remain constant. They are worthless to tamp. I don't remember the name of the wood I talked about that had to be drilled with a diamond tipped drill bit. I can remember the machine that drilled the 4 holes next to the rail at the same time. I also remember seeing that machine operator change drill bits quite often. Usually, those ties would come to a job site predrilled, but on occasion, severel wouldn't be drilled. Concrete has its place. Of the two, wood is a lot easier to work with, but concrete typically lasts longer. Recently, I have seen on different rail sites the inner workings for the concrete tie placement gang, a wood tie gang, and a rail gang. If I see them again, I will share them on RU-vid and mention your handle so you get alerted, IF YOU WISH.
@Seaboardsystem-t7e
@Seaboardsystem-t7e 10 дней назад
BNSF seriously needs to do tie replacement on the Hinckley subdivision. Some of the ties on that line are up to 20 years old and railfaning there every day i’ve seen those ties start to show their age for a while now
@Memphisdoug
@Memphisdoug 10 дней назад
What happens if the new tie is too low to the rail?
@daveschmitt4499
@daveschmitt4499 10 дней назад
@Memphisdoug . After the new tie is installed, another machine installs the metal plates between the rails and the ties on both ends, then the tamper comes and tamps the ties tight to the rail. Then the spikers come and spike the rail to the tie.
@SD457500
@SD457500 4 дня назад
It looks like @daveschmitt4499 provided a great reply on this. Thank you both for the comment on this!
@RFMCabooseNP1713
@RFMCabooseNP1713 10 дней назад
Cool
@abecoulter8550
@abecoulter8550 9 дней назад
why not concrete sleepers
@SD457500
@SD457500 4 дня назад
Concrete has its place, as do wooden ties, and it depends on the climate. We have concrete ties in a few places around here, but due to the climate here, wooden ones tend to last longer. Thanks for the comment, and watching!
@daveschmitt4499
@daveschmitt4499 4 дня назад
@abecoulter8550 . Yes. Concrete ties are supposed to last longer but I was told only 50 years. That all depends on the track conditions, the constant changing weather and how much the ties need to be maintained such as resurfacing or derailments. Wood ties also have a life expectancy depending on the type of wood, weather conditions, maintainance required and derailments. There is one wood that is so hard, it takes a diamond tipped drill bit to drill a hole so a spiker who pushes spikes into the tie can push in a spike without bending the spike. Most spikers have the ability to pound spikes in similar to a hammer drill. But with these predrilled hard wood ties, the spikes must be pushed in with one smooth motion, no hammer pounding with the spiker. And even then, the spikes could bend very easily. Hand hammering in these predrilled ties is nearly impossible because the wood is that hard.
@rsinclair6560
@rsinclair6560 21 час назад
​​@@daveschmitt4499This is interesting. What is the species of tree? In southern Australian States, River Red Gun, was always used (eucalyptus camaldulensis). Usually Victoria and New South Wales. No treatment necessary and life expectancy of 25 years. Some sawmills cut Iron Bark (Eucalyptus crebra), the name speaks for itself..beautiful timber. BHP Broken Hill Propietry steel makers made a pressed steel sleeper (tie for you American good folk). Last forever but hard to tamp particularly they are open hollow underneath and blue stone rock ballast does not 'grip', the ballast moves as train moves over the top . Timber sleepers are great in build up residential areas as they absorb the rail noise. Concrete is the go. Very long life and expensive. Deeper in profile and heavy which is a problem if they replace wood. Side insertion can scrape the compacted original compacted rail base and cuts through the slight engineered transverse slope to drain water. The concrete insertion destroys the compacted drainage surface and you end up a track with big drainage problems the sleepers sink in mud and rail surface very random uneven. Heavy speed restrictions to avoid derailments. Concrete are suitable for total track reconstruction when formation is prepared and compacted. Do it once, do it right.
@AuroraOctaneJ612
@AuroraOctaneJ612 2 часа назад
SD, I'm sorry she's Sally A, 7/4 life path 5. NO D
@StormySkyRailProductions
@StormySkyRailProductions 10 дней назад
Awesome part two tie replacement video. Took me back to my railroad days back on the CP. Enjoyed watching once again and have a wonderful rest of your Tuesday. Steve
@TrainWork
@TrainWork 10 дней назад
Good Stuff👍😁OperateOnOperator
@SD457500
@SD457500 10 дней назад
Glad you enjoyed the video; this was a neat and cool operation to see.
@lexpo181
@lexpo181 10 дней назад
so cool to see those MOW machineries! Excellent video Douglas! ;)
@anjuarunderwood6869
@anjuarunderwood6869 18 часов назад
Sweet I love them mow machines
Далее
Новый вид животных Supertype
00:59
Просмотров 74 тыс.
Brilliant Budget-Friendly Tips for Car Painting!
00:28
I thought the treadmill crane was fictional.
6:23
Просмотров 2,4 млн
CN train track replacement
12:34
Просмотров 2,4 тыс.
Broken Joint Bar - Have to Repair it Fast!
13:30
Просмотров 1,1 млн
Worlds First Log Haul with a Diesel Electric Truck!
33:55
How to Bend Rail for a Curve on the Railroad
13:07
Просмотров 229 тыс.
What's inside the BIG BOY? Let's find out!
22:50
Просмотров 112 тыс.