An #automatic_transfer_switch (#ATS) or an #automatic_changeover_switch transfers power supply from its primary source to a backup #generator automatically, when it senses partly failure or a total failure in the primary source.
When a failure occurs in the primary power system the ATS invokes the backup source which is a three phase diesel powered #automatic_generator here, to run electric equipment until utility power is restored.
This ATS is capable of automatic starting and stopping of the generator too, in addition to the automatic transferring of power to the load.
ATS needs to be properly designed and wired to the primary and backup power sources, as it must communicate effectively with both power sources to switch power and connect the equipment to the proper power source with a minimum delay period.
If the video is useful, please subscribe to the channel.
Thank you.
#changeoverswitch #changeover #self_start_generator #3phase #ac_generator
#3phase_generator #changeoverswitch #auto_changeover_switch #ATS_panel_wiring #electrical_wiring #electrical_safety #Generator_for_home
#Generac_generator #Generator_automatic_start #Automatic_generator_start_and_stop #contactor_wiring #how_to_start_generator #generator_start
More videos for you 👇
Surge Protection Device (SPD): Operation and Installation on a Single phase or 3phase DB, explained.
• Surge Protection Devic...
Safety Relay: Operation and installation explained.
• Working principle of S...
Automatic Start-Stop of generator with ATS / Automatic transfer switch / Automatic changeover switch
• How to design an ATS f...
Phase Failure Relay (PFR): Operation and Installation.
• Phase Failure Relay (P...
Emergency Stop Push button switch - Operation and Wiring Explained.
• Emergency stop push bu...
Single phase Induction Motor operation with Start Run Capacitors.
• Single phase Induction...
Star Delta Starter Power circuit wiring for 3Phase Induction Motor- Operation explained.
• Star Delta Starter pow...
VFD (Variable Frequency Drive) and Inverter Operation Explained.
• How Variable Frequency...
3 Phase Electricity operation: How it works and Power Calculations.
• What is 3 Phase Electr...
Motor speed (RPM) calculation: Synchronous speed & Fractional slip explained.
• Single phase Induction...

Опубликовано:

 

17 мар 2022

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 157   
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Hi everyone, Just a kind request to the viewers and professionals who can afford to sponsor or fund this channel, mainly for the benefit of the viewers all over the world.🌎🗺✈ It will also definitely be a motivation for me, to continue this channel with good explanatory educational videos for all of you. You can contribute by being a Sponsor of this channel using the following link, patreon.com/ElectroAcademy I made this request few months ago, and now we have one Patron who has come forward to help this channel.💪💪 I love it from the bottom of my heart.❤❤❤ I know, many have become patrons of entertainment channels mainly, but look forward to seeing some more supporters who understand the value of an educational channel like this. Your kind gesture will be most welcome..!❤👍 Thank you and Best regards. Sudarshan, Creator of Electro Academy Channel.
@abdiismael6138
@abdiismael6138 8 месяцев назад
this is absolutely comprehensive videos that need to be supported in every means
@ElectroAcademyEA
@ElectroAcademyEA 8 месяцев назад
Thank you
@okonkwoandrew5880
@okonkwoandrew5880 3 месяца назад
you are a teacher with teaching qualities I keep to your videos.
@ElectroAcademyEA
@ElectroAcademyEA 3 месяца назад
Thank you
@faridahmedrana2688
@faridahmedrana2688 8 месяцев назад
Sir, You are the great teacher for electrician. May Allah bless you. Thanks.
@ElectroAcademyEA
@ElectroAcademyEA 8 месяцев назад
Thank you
@pattersonbogar6380
@pattersonbogar6380 Год назад
A well explained information supported with clear pictorial diagram. Thank you for dedicating your time and effort to share your knowledge on this particular topic. Thank you...much appreciated
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Thank you.
@kamaphilemon2089
@kamaphilemon2089 2 месяца назад
Thank you Sir. You effort is much appreciated. Best ATS video ever
@ElectroAcademyEA
@ElectroAcademyEA 2 месяца назад
Thank you
@tettehphilipkwei3905
@tettehphilipkwei3905 5 месяцев назад
Sir you where my teacher you are the best 👍🔥
@ElectroAcademyEA
@ElectroAcademyEA 5 месяцев назад
Thank you
@ildarhamrayev
@ildarhamrayev 2 года назад
Very nice and vivid current flow is illustrated. Makes everything clear how does it work. And explained simple. Much of thanks to u !
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Thank you👍
@ildarhamrayev
@ildarhamrayev 2 года назад
@@ElectroAcademyEA waiting for more videos like that. if u can make industrial machines
@enochmeshullam2814
@enochmeshullam2814 6 месяцев назад
I am very thankful to you Sir for this very informative video you have shared with those of us who are in a real need for knowledge of ATS control phenomenon. I love the video. Much thanks and great appreciation. Cheers
@ElectroAcademyEA
@ElectroAcademyEA 6 месяцев назад
Thank you
@NickTheHunter
@NickTheHunter Год назад
Thank you so much, sir! A very good quality video! Much appreciated!
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Thank you
@IsraelKero
@IsraelKero 2 месяца назад
Very helpful thanks man
@ElectroAcademyEA
@ElectroAcademyEA 2 месяца назад
Thank you
@anhtuannguyen2248
@anhtuannguyen2248 8 месяцев назад
Very good, thanks.
@ElectroAcademyEA
@ElectroAcademyEA 8 месяцев назад
Thank you
@zenebehagos3537
@zenebehagos3537 10 месяцев назад
10q so much for taking time do this lecture and took time to upload it
@ElectroAcademyEA
@ElectroAcademyEA 10 месяцев назад
Thank you
@JimmyHorope-fq5zx
@JimmyHorope-fq5zx Месяц назад
That was helpful.
@ElectroAcademyEA
@ElectroAcademyEA Месяц назад
Thank you
@kingsleymakoi3343
@kingsleymakoi3343 Год назад
Good.. nice thank you
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Thank you
@thesportsbar7
@thesportsbar7 Год назад
Very clear and understanding
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Thank you
@user-jh7kq4cf1c
@user-jh7kq4cf1c 9 месяцев назад
Very clear and understanding,thanks for this information
@ElectroAcademyEA
@ElectroAcademyEA 9 месяцев назад
Thank you
@amissahjoojo7961
@amissahjoojo7961 2 года назад
A very good tutorial 👌
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Thank you.
@hassanhussein3703
@hassanhussein3703 2 года назад
Thank you
@anaskarim7033
@anaskarim7033 7 месяцев назад
what a wonderful explanation it was . thanks a lot to the channel
@ElectroAcademyEA
@ElectroAcademyEA 7 месяцев назад
Thank you
@kamikazeray4866
@kamikazeray4866 Год назад
Thanks a lot It's very useful 👍💕
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Thank you
@heartperson4987
@heartperson4987 Год назад
So excellent video about automation.. Thanks for like this video from Bangladesh
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Thank you
@manojmule8624
@manojmule8624 Год назад
Thank you sir
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Thank you
@polyfaruk190
@polyfaruk190 2 года назад
Very good.thank you sir
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Thank you.
@ashokshah7388
@ashokshah7388 Год назад
wow nice very very usefull video thank you
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Thank you
@abudaoud1310
@abudaoud1310 2 года назад
Thanks for made the video🌹
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Thank you.
@alkararali3548
@alkararali3548 Год назад
شكرا لك أخي الكريم على هذا الفيديو المهم استمر بالعطاء يا حبذا لو تعمل لنا فيديو اخر عن كيفيه اداره ATS ثلاث مراحل كهرباء الدولة الحكومية وكذالك كهرباء الاشتراك في الحارة وكهرباء مولد البيت في الداخل كيف الىبط بينهما
@ElectroAcademyEA
@ElectroAcademyEA Год назад
شكرًا لك
@venanciojpena1669
@venanciojpena1669 Год назад
Very interesting & really appreciated
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Thank you
@GAMINGYT-eg6xj
@GAMINGYT-eg6xj 2 года назад
very good video sir thanks
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Thank You.
@GAMINGYT-eg6xj
@GAMINGYT-eg6xj 2 года назад
thanks sir,thank you so much
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Thank you.
@agustinussonoto7794
@agustinussonoto7794 2 года назад
The best tutorial..
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Thank you 👍
@AliShan-lv9pf
@AliShan-lv9pf 11 месяцев назад
I love you 😘 great work and very helpful diagram video sooo thanks.............
@ElectroAcademyEA
@ElectroAcademyEA 11 месяцев назад
Thank you
@bijusenthil
@bijusenthil 2 года назад
Good explanation
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Thank you
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Dear All, DPDT relay means Double Pole Double Throw Relay. Double pole is mispronounced here as Double port @ 1:32. Kindly take a note on this, when viewing/listening to the video. Regards, EA.
@gombanirorichard9759
@gombanirorichard9759 2 года назад
The start connection is the one from AUTOMATIC button on generator screen?how to connect it on that relay?thank u
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Best way is to check with the generator supplier. Then its easy with relative brands.
@sandyfortuno3194
@sandyfortuno3194 Год назад
nice
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Thank you
@SivaKumar-zi3dd
@SivaKumar-zi3dd 5 месяцев назад
❤❤
@ElectroAcademyEA
@ElectroAcademyEA 5 месяцев назад
Thank you
@SlaviTerziev
@SlaviTerziev 8 месяцев назад
great
@ElectroAcademyEA
@ElectroAcademyEA 8 месяцев назад
Thank you
@kyawzin2639
@kyawzin2639 2 месяца назад
thank
@ElectroAcademyEA
@ElectroAcademyEA 2 месяца назад
Thank you
@michaelisongekwere1402
@michaelisongekwere1402 2 года назад
This was an explanation thank you Sir please what are components that make up this design and connection? I know 2 magnetic contactor, 1 phase failure relay, 3 Double pole double throw 8 relay, 2 AC double pole breaker, 5 Timers Secondly on the battery relays you connected port 1 and 3 of start and port 1 and 3 of stop to what components is it 1 and 2 start- push and 3 and 4 stop-push components?
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Yes.
@renebangura8138
@renebangura8138 Год назад
OK but I have a question how would this design change if you you wanted to build an ATS that changes between 3 sources. An example would be if you had grid, solar backup and generator in that priority order. Would be great to know as there's almost no info available on this specific topic
@JOSE-tt8tb
@JOSE-tt8tb 7 месяцев назад
Bro, it’s simple, just make another same set of panel and it’s out considered as second prior after the grid, for example just do this circuit with solar and generator and it’s out again do with grid supply, in this way you can make infinite number of power sources 💪😉
@ibekwechidithompson4853
@ibekwechidithompson4853 Год назад
Thanks for the lessons, please can I apply this to a single Phase? And can I have the circuit diagram for this video, thanks Thanks in anticipation
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Thank you. You can use this for single phase generator wiring too. Instead of 3 phase 3 wires on power side of two contactors, use live wire and neutral wire on L1 and L3 terminals. Keep L2 terminal empty. Control wiring is the same as shown in this video.
@lenardfritz1020
@lenardfritz1020 2 года назад
Very Nice . Can we have a ladder diagram of the ATS explained above?
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Thank you. Will try to do when time permits
@ibekwechidithompson4853
@ibekwechidithompson4853 Год назад
Thanks for the lessons, please can I apply this to a single Phase? And can I have the circuit diagram for this video, thanks
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Yes, you can.
@akolkar2530
@akolkar2530 Год назад
Pl show timer s T1 T2 in video with colour animation. Thanks again for video,👌👌👌👌👌
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Thank you
@faryazch
@faryazch 2 года назад
This design is suitable for Single Phase Gride and Single Phase Generator? and how many self start attempt?
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Yes. You can use it on single phase grid with single phase generator. Normally, generator should start with one start attempt. If there are dificulties with starting, we need to check and correct it first.
@marounabimoussa4374
@marounabimoussa4374 2 года назад
Excellent explanation! Just one question though: contactors have 3 main poles and 2 accessory poles?? The ones I usually see have just one accessory...
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Normally contactors have 2 auxiliary contact points, NO and NC. But, according to the requirement, you can purchase heavy duty contactors with 4 auxiliary contact points, two NO and two NC points. There are contactors where you can add more auxiliary contact points on to it also. Additional contact points can be slide on to the contactor top and lock it. It should be done according to the manufacturer recommendations only.
@michaelisongekwere1402
@michaelisongekwere1402 2 года назад
@@ElectroAcademyEA good please should I use stop push and start push buttons to manually switch off and on generator?
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
@@michaelisongekwere1402 Yes. Further, you can use a 2 pole breaker when wiring 12 volt power from the battery to this system. Breaker "ON" position is your generator automatic start/stop operating position. Similarly, breaker "OFF" position will act as generator manual start/stop position. In both these positions power transferring will be fully automatic, although you have to start the generator manually, in breaker "OFF" position.
@ibekwechidithompson4853
@ibekwechidithompson4853 Год назад
Please sir, the relays and timers for the gen auto start are they DC or AC?
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Battery connected relays and timers are DC. All others are AC.
@ousmanfadera8310
@ousmanfadera8310 Год назад
great lectures credible and amazing. any chance of scholarships on electrical and electronic engineering into your reputable and renowned Electro Academy..
@ElectroAcademyEA
@ElectroAcademyEA Год назад
We currently teach only through RU-vid media. We may consider this when we start our learning center soon.
@cabs79
@cabs79 Год назад
Is this diagram can be in actual wiring of the ats panel?
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Yes. Basic arrangement is this. Changes are there according to the different models and brands.
@peterloulee8845
@peterloulee8845 11 месяцев назад
Are you doing relay switch for video
@said_words
@said_words 11 месяцев назад
great work ,which software have you used
@ElectroAcademyEA
@ElectroAcademyEA 11 месяцев назад
For animation work, Microsoft power point. Thank you.
@michaelisongekwere1402
@michaelisongekwere1402 2 года назад
Please if am to design this ATS for a load wattage of 25,000watts in facility what is the the size of panel by millimeters I should request to buy? That would contain these components
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Actually the size of the panel is to be decided according to the component sizes and the relevant wiring work too. Some component sizes might be different according to their brands also. If you are not an Electrician, better to get help from one to get good idea on sizing of the panel board.
@irshadumerfarooq7901
@irshadumerfarooq7901 Год назад
Great Sir, Do you have 3 power source ATS model
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Generally, control circuit needs only a single phase supply or direct current supplied through a battery, to operate magnetic contactors.
@GAMINGYT-eg6xj
@GAMINGYT-eg6xj 2 года назад
make the video two pump controlled by latching relay plz
@adammangal8530
@adammangal8530 11 месяцев назад
Hello, where do we get the neutral for the load from? How do we ensure there is always a neutral cable from both supplies without them interconnecting?
@ElectroAcademyEA
@ElectroAcademyEA 11 месяцев назад
From the generator supply, you get separate neutral cable. So, the two neutral cables need to be connected separately, as shown on the video.
@adammangal8530
@adammangal8530 11 месяцев назад
@@ElectroAcademyEA It only shows the 3 active wires going to the load, how does the neutral wire connect to the load?
@ElectroAcademyEA
@ElectroAcademyEA 11 месяцев назад
Sorry for that I have not shown it in the video. As done for the 3 power lines, you need to get two neutral lines separately from the grid and from the generator to the junction box, and connect it. From the junction box, only one neutral line to the load. 3 pole contactors on grid side and generator side, need to be changed with 4 pole contactors to provide neutral wire through it.
@adammangal8530
@adammangal8530 11 месяцев назад
@@ElectroAcademyEA 4 pole contactor! okay thank you very much
@adamsoladipupo3390
@adamsoladipupo3390 Год назад
Well done sir, pls how will one connect the ats for single phase generator to auto start/stop
@ElectroAcademyEA
@ElectroAcademyEA Год назад
For single phase generator, same two magnetic contactors can be used. Instead of three phase lines, live wire and the neutral wire can be taken through it. One terminal on both contactors will be empty.
@ibekwechidithompson4853
@ibekwechidithompson4853 11 месяцев назад
Thanks sir, please can i see how the start and stop connection is done physically, with stop and start button. I will be grateful if granted. Thanks
@ElectroAcademyEA
@ElectroAcademyEA 11 месяцев назад
Please try the video on below link. ru-vid.com/video/%D0%B2%D0%B8%D0%B4%D0%B5%D0%BE-_6WhieL50GI.html&feature=share9
@ibekwechidithompson4853
@ibekwechidithompson4853 Год назад
Thanks for the video, but please can I see its physical build-up
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Thank you. Standard arrangement is shown here with current flow animation, mainly for the ones who need to understand the automatic starting of the generator easily.
@GAMINGYT-eg6xj
@GAMINGYT-eg6xj 2 года назад
sir please make next video on latching relay plz.
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Ok. When the time permits.
@lappyajay1
@lappyajay1 2 года назад
Can we common all the neutral...??
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
No. Grid and generator side neutral lines need to be kept separated, to enable safety features like RCDs to work correctly.
@marcelogallelli5548
@marcelogallelli5548 Год назад
Que buen tutorial ... Lo malo es que no se hablar ingles 🤦‍♂️...
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Gracias. Puede ver este video en español usando el siguiente enlace. ru-vid.com/video/%D0%B2%D0%B8%D0%B4%D0%B5%D0%BE-rgtEnNUYTto.html
@rolandtoophanie5185
@rolandtoophanie5185 Год назад
Hey sir what type of timer relay used. Is all the timer relay ON DELAY?
@ElectroAcademyEA
@ElectroAcademyEA Год назад
All the timer relays used here are ON DELAY type. Actually we can use ON DELAY timer relays for average OFF DELAY functions also, by using NO and NC contacts properly.
@rolandtoophanie5185
@rolandtoophanie5185 Год назад
Ok thank you. I'm going to build a system exactly like this soon for backup system
@rolandtoophanie5185
@rolandtoophanie5185 Год назад
Is there any other way I can get in contact with you to get some more information about the parts to be purchased?
@selimmahmud1616
@selimmahmud1616 Год назад
all ok. When my grid off then 3 hours Later generator start. How to set the time
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Hope you can get help from an electrician to correct this fault. Necessary timer settings are described in the video.
@sahanshrestha738
@sahanshrestha738 2 года назад
Please explain how Manual and Auto mode is achieved in ATS
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Introduce a two pole Isolator or a breaker and take battery wires to the auto start and stop connections through it. Isolator "ON" position will act as "AUTO" mode. Isolator "OFF" position will be the "MANUAL" position. When Isolator is at OFF position, you need to start the generator manually when grid power is not there. It will supply power to the contactor top and generator side control line breaker, allowing power to transfer automatically to the load.
@sahanshrestha738
@sahanshrestha738 2 года назад
@@ElectroAcademyEA thanks for your prompt response
@sarmadali1991
@sarmadali1991 2 года назад
Can you explain how connect swich of generator to run and stop generator auto. Please draw wiring diagram for connections
@earthenergyhex
@earthenergyhex 2 года назад
yes I would like to see the same
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Generator manual start button wires need to be connected to the two green points marked as start connection on the diagram for automatic starting. Generator stop button wires need to be connected to the two red dots marked as stop connection for auto stopping of the generator. If you need an auto - manual switch for generator, connection from the battery can be provided through a 2 pole breaker. This breaker OFF position will act as generator on manual starting only, still the power will automatically change over after you start the generator manually.
@sarmadali1991
@sarmadali1991 2 года назад
@@ElectroAcademyEA I didn't understand you can you draw wiring diagram to explain that Thank you ❣️❣️❣️
@Ayx12114
@Ayx12114 3 месяца назад
Sir can you provide schematic diagram for this system
@DS-it3xd
@DS-it3xd 2 года назад
How to emergence stop button. Sir..
@ElectroAcademyEA
@ElectroAcademyEA 2 года назад
Emergency stop button should come with the generator itself.
@seiduafataw9821
@seiduafataw9821 Год назад
After that how does the generator start if the grid is out.
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Through battery power
@seiduafataw9821
@seiduafataw9821 Год назад
And what? Meaning the the battery have to be charge right?
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Yes. You need to have a battery charger (powered by grid side) to keep the battery fully charged, in order to start the generator during a power outage.
@enochyamoah7239
@enochyamoah7239 Год назад
On the grid side you used two timer relays Can’t one timer relay do the job
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Timer 1 is there to make generator to run on load for 2 to 3 minutes even after grid power is available. If grid power goes off again within this period, generator is on load and power supply will not be interupted. Although recommended, you can omit this timer if intermittent power disturbances are minimal.
@geraldrice3423
@geraldrice3423 11 месяцев назад
Too difficult to follow . Need to slow down a bit !
@ElectroAcademyEA
@ElectroAcademyEA 10 месяцев назад
Thanks for your comment
@josebravo6642
@josebravo6642 Год назад
No entiendo el inglés.
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Por favor, consulte el canal en el siguiente enlace. Más videos serán agregados aquí pronto. ru-vid.com
@user-vx1wr9hg5u
@user-vx1wr9hg5u 3 месяца назад
Any Whatsapp group pls I want to join
@sersiobordios
@sersiobordios 9 месяцев назад
your sub-title covers the timer socket wiring configuration, it's bad video.
@ElectroAcademyEA
@ElectroAcademyEA 9 месяцев назад
You can stop subtitles by clicking the "CC" icon on the screen.
@sheriffdeen175
@sheriffdeen175 Год назад
Thanks sir
@ElectroAcademyEA
@ElectroAcademyEA Год назад
Thank you
Далее
Me: Don't cross there's cars coming
00:16
Просмотров 10 млн
Conquering fears and slippery slops on two wheels!
00:18
Generator Auto-Start: ST switch
8:58
Просмотров 17 тыс.
Automatic generator changeover switch (with schematic).
27:06
Motor Control 101
15:59
Просмотров 1,9 млн