The day materials arrived, I show up and it was a week out from Thanksgiving weekend.
Aside from this tub surround, I also had to tile a wraparound kitchen backsplash AND a 9' wide by 10' tall wraparound stone-faced fireplace too.
I thought I had a good couple weeks to complete it. Then the owner mentioned that they wanted it done before the holiday.
Boys-a-dear! Did I ever have to buckle down. It required 14-hour days, but I got it done and they were pleased.
The sad part was that the designer who referred me to the job was diagnosed with a brain tumor. Unfortunately, she didn't get to see the finished job.
9 май 2024