I dearly hope they will learn from that mess to reduce costs for other new reactors. €54bn for 3.2 GW is just ridiculous (16.7 €/W). Even more expensive than the mess at Vogtle (14.6 €/W). We need the Barakah values (4.5 €/W) to get things going with nuclear!
Am I right they will be installing the steam generators through the equipment hatch and not prior to the containment building dome being placed? Seems kind of silly but I guess that is how it will need to be done in the future anyway...
After Sizewell b being built they should have carried on building another ten around the existing nuclear sites across Uk we wouldn’t be in the shite we are now, no need to import gas and be in control of our own generation not rely on France ..😊