BS7671 New Amd 2 - 2022 How to Complete a Schedule of Inspections on the New EIC 

Sparky Help
Подписаться 14 тыс.
Просмотров 6 тыс.
50% 1

New to BS7671 Electrical Installation Certificate schedule off inspections how to complete this paper work and review. Easy guide for all those working or learning electrical installations. To be watched in conjunction with my other videos on schedule of inspections.

Наука

Опубликовано:

 

29 мар 2022

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 15   
@ramzg5402
@ramzg5402 2 года назад
Thanks and nice to see you back.
@sparkyhelp3997
@sparkyhelp3997 2 года назад
Thank you too!
@quinndevelopments
@quinndevelopments 5 месяцев назад
Thanks for the video 👍
@sparkyhelp3997
@sparkyhelp3997 5 месяцев назад
My pleasure!! Please Share with like minded people and maybe even Like and Subscribe
@faithful5475
@faithful5475 Год назад
I've just notice the update from previous one my Lord🤣 Thank you for video
@sparkyhelp3997
@sparkyhelp3997 Год назад
You are very welcome, Please Like Share & Subscribe
@addz91
@addz91 2 года назад
Thanks for the heads up. I've got an assessor coming out with me in a couple of weeks. Where can I find a template of this revised sheet?
@sparkyhelp3997
@sparkyhelp3997 2 года назад
Hi go to IET web site 'wiring regulations - forms'. Good luck, please Like Share and Subscribe.
@Dog-whisperer7494
@Dog-whisperer7494 Год назад
Great video, I find it very strange that if you download the IET model forms BS7671 2018+A2 2022 it still includes the two pages that we no longer need. . So what are we supposed to do ?
@sparkyhelp3997
@sparkyhelp3997 Год назад
These can still be used for larger projects if more detail is required (remember you are still checking the suitability of all the items listed but with fewer ticks required). Please Like, Share & Subscribe.
@Dog-whisperer7494
@Dog-whisperer7494 Год назад
@@sparkyhelp3997 already subscribed
@Dog-whisperer7494
@Dog-whisperer7494 Год назад
@@sparkyhelp3997 I have also left a comment on another one of your videos , the one titled what should you complete doing a board change some plum said that you are wrong and give misleading information so I hopefully came to your defence. Please review and correct me if I’m wrong
@sparkyhelp3997
@sparkyhelp3997 Год назад
@@Dog-whisperer7494 Hi thank you, but i do not have one regarding a board change, I would be curious to read it though.
@Dog-whisperer7494
@Dog-whisperer7494 Год назад
@@sparkyhelp3997 this is my reply to a comment. Yes it’s not one of your videos sorry mate my apologies but read this and please feel free to correct me if I’m wrong. Paul Smith , he’s right you should only complete the paper work that is relevant to the work you did , an (EICR electrical installation condition report) Is to determine whether the installation is safe for continued use, not to to determine whether a CU upgrade is required, there is no regulation requirement to upgrade an existing installation. Or to bring it up to the current standard I refer you to page 99 in the current version of the onsite guide, and to the HSE note in BS7671 , try fecking reading it . Ware he has got it wrong is if you replace an old CU with a new CU then you test all the circuits and you carry out Ze continuity insulation resistance ring final and so on , the you complete the electrical installation certificate witch details the installation characteristics followed by the schedule of test certificate . An (EICR electrical installation condition report) is not required prior to a board change. You should never take responsibility for someone else’s work, if you install a new circuit to an existing installation you are only responsible for that circuit. Nothing else, if you install a new CU you are responsible for the hole installation as you are required to insure that the MCBs RCDs or RCBOs are suitable for the installation. And you test all circuits in accordance with BS7671 18th edition 2018+ amendment two 2022. The IET model forms come as a complete package, in a set of three , each accompanied by a set of two notes one for the installer and one for the client. 1)electrical installation certificate 6 pages. 2)minor electrical installation works certificate, 2 pages, 3) (EICR)condition report, 9 pages, you only complete the document relevant to the work ordered and witch you completed . Try reading the notes .
Далее
Easy Guide to Maximum Demand & Diversity
18:45
Просмотров 10 тыс.
🤯️ Vini Jr. ✖️ Brahim 🤯
00:13
Просмотров 4,7 млн
На фейсконтроле 💂
09:41
Просмотров 994 тыс.
КРАХ WINDOWS 19 ИЮЛЯ 2024 | ОБЪЯСНЯЕМ
10:04