Today’s video is an update on Project Kofi, the 8,800 sqft house that we are building at Grace City.
Do you have a building project you would like a consultation for we offer -
Poject management
cost estimate
Design & review
Refurbishment
Building products eg DPM /DPC, sika Water proofing solutions and Stone coated Roofing Sheets.
contact -
Email - princeniki86@gmail.com
Ghana - +233 25 702 9792
Web- pndconstructiongh.com (pndconstructiongh.com)
Instagram/ TikTok-
PND_ Constructiongh
Come join our RU-vid family follow our journey by supporting us, like this video, Share & Subscribe 🔔 free to subscribe and support us!
#buildinginghana
#buildinginafrica #Accra #Ghana #PndConstructiongh
#Aburi #ghanahouse #lifeinghana #ghana #constructionghana
Disclaimer: Please note comments are our own personal experience and should not be taken as a professional advise

Опубликовано:

 

27 июн 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 16   
@cela202
@cela202 17 дней назад
Hi Prince and Nikki. Thanks for sharing 👍 😊.
@princenikki
@princenikki 16 дней назад
Thank you Celestine we’re happy to be helping others get their dreams
@kontomylitis
@kontomylitis 16 дней назад
Looks beautiful
@princenikki
@princenikki 16 дней назад
Thanks for watching
@niquiniquita4512
@niquiniquita4512 16 дней назад
This project is coming along BEAUTIFULLY Prince & Nikki & it looks very neat & precise as usual. Great job so far 👏🏾👏🏾👏🏾❤️
@princenikki
@princenikki 16 дней назад
@@niquiniquita4512 thank you it’s really taking shape now isn’t it x thank you 😀
@mr.c7076
@mr.c7076 15 дней назад
Great job Prince. This is very encouraging. A big shout out to brother Kofi.
@princenikki
@princenikki 15 дней назад
Thankyou Sir 😀 happy to be working with you both.
@mr.c7076
@mr.c7076 15 дней назад
So am I.
@kontomylitis
@kontomylitis 16 дней назад
1. The grading of the garage and the front will be difficult to achieve post construction if it's not already taken care of in the foundation. 2. Does a dpc treatment have to be above foundation level for it to be effective? 3. Prince why didn't the foundation on the entire front go lower to take care of the grading of the front view? Going by the 3D rendering it looks like the front sits level to the ground? Humble observation. Will appreciate a response. Thanks
@princenikki
@princenikki 16 дней назад
Hi Thanks for your comments. Please see our response below: 1. The 3D image did not take into consideration the existing grading or slope of the land. There is approximately 4ft between the highest part of the land and the lowest point. As the roads have not yet been constructed, we factored in the level of the future road construction and the filling to make up levels. It’s important to note, that the Ghanaian building code requires all houses to be higher than the road and drains into gutters outside the house. There would be a ramp into the garage and steps into the house. We have taken full site measurements alongside the road level and have built the foundation based on the final finish level. As noted in the video the rear and to the right of the property, the land is higher, as part of the final landscaping and external groundwork’s this will be levelled to ensure the home is higher then the road and levels will slope to the road. 2. Yes, the DPC must be installed after the slab, minimum of 150mm above the highest point of the land. 3. In addition, to response 1 above, lowering the front of the house would require steps at different levels in through out the ground floor. The design is to achieve one level finish throughout the ground floor. We have an extensive external package, which depicts the 3D rendering. Thanks for watching.
@kontomylitis
@kontomylitis 16 дней назад
@@princenikki thank you so much for taking the time to respond. It means a lot to me.
@kontomylitis
@kontomylitis 16 дней назад
@Prince & Nikki, have you guys completely relocated to Ghana? I have land in the Afienya area.
@princenikki
@princenikki 16 дней назад
No.
@kontomylitis
@kontomylitis 16 дней назад
What's the lifespan of a dpc membrane material?
@princenikki
@princenikki 16 дней назад
About 30 years if installed correctly
Далее
Building in Ghana: Waterproof Plastering
21:37
Просмотров 11 тыс.
Building in Ghana: Decking & Casting
30:59
Просмотров 4,6 тыс.