menua due! i had it worse than yours, after casting of the 1st floor slab there were not enough cement in it so had to break everything down and re do it. again my electrical wires were cut in and stolen, had to buy the wires again. not to talk of plumbing mistakes, electrical mistakes etc. In all of those, i don't regret putting up the building, now i am tiling. no matter what that building will be done and move in.
This is really simple when building involve professionals in the building process. A mason isn't an engineer. A mason knows the know how based on experience but an engineer is skilled in that effect because he's learned in that field. There are lots of advantages in employing the service of an engineer for the building process just to avoid instances like these. It'll cost you more to use less qualified people.
This is soo bad, but great lesson to notice..thanks for sharing for many to pay attention to their project. I had a same issue with my project but i thank I noticed and rectified quickly before the first floor block laying.
Bro the size of my windows at the ground floor was different from the first floor. Bigger at the ground floor and smaller at the top. Wherrrrrr 😂😂😂 lessons learnt, never again.