Her we are taking the final few loads of dirt from a landfill cell. Kind of an odd position with the excavator and truck but it allowed us to get a couple of dozen loads out and on the Berm. Other material was taken from around the site and some material was imported. The back side was sloped at a 3:1 and covered with just enough topsoil to allow growth. The area was then filled with material primarily from Boston construction sites.
30 окт 2024