Тёмный

CBTC Project Update for the BART Board of Directors 

BARTable
Подписаться 7 тыс.
Просмотров 2,4 тыс.
50% 1

Опубликовано:

 

29 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 2   
@TohaBgood2
@TohaBgood2 Год назад
That's great to hear! Love to see BART evolving technologically and being at the cutting edge of rail technology once again!
@bobaustralia3
@bobaustralia3 7 месяцев назад
Hi the basically problem is the tube under San Francisco Bay and CBTC will definitely get them some breathing room but as most cities in the world the population is growing and eventually CBTC will not helped much and all, the answer is a new tunnel under San Francisco Bay?. It's gonna be expensive but I don't think you've got any alternative. The Bart people must regretting not having 4 tunnels instead of two because that would help a lot.
Далее
50 Years of BART | The Transbay Tube
20:57
Просмотров 163 тыс.
With new gates, BART cracks down on fare evasion
2:50
Просмотров 114 тыс.
Voy shetga man aralashay | Million jamoasi
00:56
Просмотров 544 тыс.
СОБАКА И  ТРИ ТАБАЛАПКИ Ч.2 #shorts
00:33
Family♥️👯‍♀️🔥 How old are you? 🥰
00:20
CBTC 101: CBTC Concepts, Standards and Architectures
1:16:15
What is an Interlock?
9:14
Просмотров 177 тыс.
All About BART | The Transbay Tube
3:00
Просмотров 10 тыс.
Railroad 101:  Signaling Systems
38:10
Просмотров 112 тыс.
The Fascinating Engineering behind Electric Trains!
8:58
Voy shetga man aralashay | Million jamoasi
00:56
Просмотров 544 тыс.