Тёмный

Class 395 'Javelin' high speed train acceleration 0-90mph Ashford to Dollands Moor 750v DC 

railperf
Подписаться 452
Просмотров 3,5 тыс.
50% 1

Опубликовано:

 

21 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 24   
@GWAYGWAY1
@GWAYGWAY1 3 года назад
This is the old track and not the HS1 which runs alongside. It has the standard stopping trains on that line and still manages to be fast enough . It is Ashford to Ebbsfleet and St Pancras that is the high speed part, the javelins are allowed to go much faster to make time up if late to keep the Eurostars at speed, but they are normally 140mph
@DeRepear
@DeRepear 5 месяцев назад
Yes they really do accelerate this slowly on DC power. Try it out on Train Sim World. The difference when you switch over to AC is stark!
@botiratayev
@botiratayev 7 месяцев назад
Route 300 - Docklands Buses Route 376 - Docklands Buses
@botiratayev
@botiratayev 7 месяцев назад
Route 276 - Stagecoach London Route 330 - Stagecoach London Route 473 - Stagecoach London Route 474 - Stagecoach London
@botiratayev
@botiratayev 7 месяцев назад
Route 238 - Stagecoach London Route 242 - Stagecoach London
@botiratayev
@botiratayev 7 месяцев назад
Route 366 - Blue Triangle Route 368 - Blue Triangle
@botiratayev
@botiratayev 7 месяцев назад
Route 248 - Arriva London Route 243 - Arriva London
@thetelephoneprankster4254
@thetelephoneprankster4254 5 лет назад
Is there any reason why these trains can't go back onto HS1 after Ashford to run at full speed until just before the tunnel and then re-join the classic lines? I know there is a link to the tunnel from the classic lines so I have always wondered whether this is possible or not
@railperf
@railperf 5 лет назад
Hi, there is no link from HS1 directly back to the Folkestone 'classic' line. I guess they didn't think the millions spent to build a flyover or dive under to make this possible would be worth just a few minutes time saving. After all, Ashford to Folkestone is less than 12 minutes!
@railperf
@railperf 5 лет назад
Probably electrifying the classic line from Ashford to Folkestone and improving the signalling to allow 125mph would be far cheaper - and even that option would still probably not meet any value for money criteria!
@thetelephoneprankster4254
@thetelephoneprankster4254 5 лет назад
railperf I understand. I thought that it would be possible somehow. I suppose it is not that far to Folkestone. I've always wondered though how much time could be saved. Every minute counts in the morning lol
@thetelephoneprankster4254
@thetelephoneprankster4254 5 лет назад
railperf it is electrified with third rail isn't it? If they want to talk about value for money I would like them to tell me how good value for money Stratford International has been! So theoretically could the a Javelin train go past the classic line on HS1 towards the tunnel and then reverse onto the third rail connection that way? I've seen a few videos of Eurostars doing something like this before HS1 opened.
@railperf
@railperf 5 лет назад
@@thetelephoneprankster4254 Not long after Ashford on HS1, Eurostar trains have to switch their Pantograph setting to a 25,000v AC 'Eurotunnel' setting. This sets parameters such as maximum pantograph height, pantograph uplift force, power draw etc. So I am not sure that the Class 395's would be configurable to the right settings for the overhead line equipment. They may not actually be authorised to use that part of HS1 anyway. In any case, i'm sure you would have to try and stop the train at or close to Dollands Moor, reverse back on to the up main. And then reverse back towards Folkestone - which operationally would cost too much time and involves occupying train paths. By that time, a 395 having used the existing 3rd rail main line would probably be past Dover and on its way to Ramsgate.
@bb-3653
@bb-3653 3 года назад
I've realised, if it wasn't for their insane bodyweight, they would accelerate ridiculously fast on third rail , perhaps if they weighed as much as a class 465 (i assume anyway, since their likely programmed on be super quick, hence the rapid acceleration to 60mph on AC)
@bb-3653
@bb-3653 3 года назад
Either the driver wasnt fully accelerating, or the acceleration suffers majorly on DC
@bb-3653
@bb-3653 3 года назад
@Solomon Clarke yeah their SLOW on DC , I'm not sure if it's because their too heavy and the power intake is limited, bit DAMN
@jst1man
@jst1man 4 года назад
Once I saw 70mph, I be like: Now that's California highway speeds....
@botiratayev
@botiratayev 7 месяцев назад
Route 262 - Stagecoach London Route 241 - Stagecoach London
Далее
Борщ в стиле высокой кухни!
00:57
aespa 에스파 'Whiplash' MV
03:11
Просмотров 17 млн
Class 395 Enhancement Pack (Download in description)
7:37
UK Class 180 acceleration to 125mph - Cummins QSK19
20:43
Behind the scenes at Locomotive Services Ltd in Crewe
43:30
I Got Told Off By The Station Manager: Chasing Trains
18:28
The Railway's Darkest Hour - Railtrack (Reworked)
19:00
Борщ в стиле высокой кухни!
00:57