1 harness 80% done one connector and hanger yet to go. All 22 or 24 gage wire. lots if new connectors and rerouted.
2 all white wheels doneski
3 Ashpan, reworked and fits much better, there is a way to get the firebox back into the cab.
4 Clean up the body cavity so the chassis assembly fits in. Got it done and tested.
5 rework the diode Blob, well it took two tries but I have a solid solution and mounted it with clearance. Also new SUBSCRIBER suggested SMD component and that looks very clean and neat. Will be ordered a few to test.
Well that was my list but I did take one morning to prove out the ball bearing axle idea. A it's looks very doable on idler axles today. the drive axle with gear will need more time and testing. sure looks good though.
I plan to button the guy up this week and then start the STL sharing. my next engine is already built but was stopped on a WiFi Controller with PWM. I was stumped on the hand held controller assembly and that was causing reliability issues. Then my poor wife tripped, fell and broke her foot. That was in Late Feb. So this project will take some relearning and I hope more Sunsctibers can help on this my 1st IOT for Next Gen Flyer.
OK heading back to my test bench. Dennis