"Controlled" failure the Swedishs company g-ACK AB performed the "test", Location: Källebäcken, Sweden.
The maximum capacity of 6 tons was hoisted up, then moved along the boom.
Approximaly at the middle of the boom, max capacity is reached ...
2 окт 2024