Export Limitation with the SMA Data Manager M 

SMA Solar Technology
Подписаться 38 тыс.
Просмотров 23 тыс.
50% 1

This video demonstrates the required equipment and configuration needed for setting up export limitation including net zero export.
0:00​ Start
0:11​ Introduction
1:50​ Example
2:51​ Meter Configuration
4:18​ Linking Meter to Data Manager
6:40 Configuring Export Limitation

Хобби

Опубликовано:

 

26 июл 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 20   
@samharaldson1368
@samharaldson1368 2 года назад
A succinct and thorough explanation. Thank you, Mr. Mahon.
@ngogiavan1330
@ngogiavan1330 Год назад
Thanks all
@jennifermartin7838
@jennifermartin7838 2 месяца назад
My system still exports when I have followed all of these settings. It appears SMA updated the Data Manager web ui interface since this video was made, so some of the instructions here can't be followed, but I configured my system before they changed it. Anyway, I can't seem to stop exporting, even when all of the devices appear to be working properly
@henrytumwesige8351
@henrytumwesige8351 Год назад
I have a 500KW plant but my local load is 80KW, and I've not started feeding the excess power into the National grid. How do I configure my system to only produce only 80KW and not more in the meantime? I'm using a 20 X STP25000TLs, 24 S.I 8.0H-12, and one Data Manager M.
@dorindelu
@dorindelu 2 года назад
I have 3 sma 11000TL equipped with SMCB FS piggy back card for a three-phase system, with an SMA Sunny Home Manager 2.0 can I set zero export?
@tamuc5416
@tamuc5416 Год назад
tuyệt vời
@user-el6cn3jf8n
@user-el6cn3jf8n 2 года назад
Does Export Limitation "0 kWh " work with Core 2 in Europe?
@dahhamabueram8945
@dahhamabueram8945 Год назад
How can I enter the first interface to register the name and password? I do not have a scanner
@albertorodriguez1642
@albertorodriguez1642 2 года назад
Is zero export possible using the STP 62 ?
@smasolartechnology
@smasolartechnology 2 года назад
Alberto - Yes, the process would be the same as shown if using a CORE1 US-41 inverter. The energy meter would obviously need 3 CTs rated for the appropriate current level for a three phase system, but the process is the same. Zero export would in this case be net zero across all three AC conductors.
@RedseaMaster
@RedseaMaster Год назад
Hi dose this energy meter working with data manager M & Sunny tripower core2 to get Zero Export?
@RedseaMaster
@RedseaMaster Год назад
with current transformers
@TrungTran-rk7rx
@TrungTran-rk7rx 3 года назад
Hello. I need a zero export solution for a system consisting of IM20 and SHP75. What devices do I need to be able to install?
@smasolartechnology
@smasolartechnology 3 года назад
Hello Trung Trần. Thank you for your enquiry. Please contact our colleagues at SMA Southeast Asia directly: facebook.com/SMAsolarSEA Sunny regards, your SMA Social Media Team
@sudhakarporumamilla4356
@sudhakarporumamilla4356 3 года назад
is it possible to set zero export with out energy meter?
@smasolartechnology
@smasolartechnology 3 года назад
Sudhakar - An energy meter of some type is needed to measure power flow at the grid connection point. Inherently a grid-tied inverter has no way of gathering this required information.
@sudhakarporumamilla4356
@sudhakarporumamilla4356 3 года назад
Ok, thank you very much
@smasolartechnology
@smasolartechnology 3 года назад
@@sudhakarporumamilla4356 You're welcome! :)
@esquire9445
@esquire9445 3 года назад
I thought the concept of zero export was so the user can have electricity when the grid is down. This still allows back feeding which can kill a line worker. So I can’t buy this system and have electricity when the grid is down. Seems like this industry is still upside down.
@MichaelTFrank
@MichaelTFrank 2 года назад
I'm not with SMA, but I can answer this. The concept of zero export is just to stop export. There can be different reasons to do this, but often it is to avoid overloading the grid during normal operation, especially when grid lines are small and the generation system is big. Zero export is a utility requirement in some countries. Many SMA inverters are installed with a backup power outlet that will continue to provide power when the grid is down, without back feeding to the grid. They are very safe. You can also have a battery system installed for more backup power. These are totally separate features from export limitation.
Далее
Commissioning Data Manager M (Screencast)
10:00
Просмотров 27 тыс.
How to Choose SOLAR Wisely and Avoid Costly Mistakes
25:40
SMA Data Manager M: News and grid management services
23:41
Switching 11kV VCB Tamco
7:34
Просмотров 2,5 млн
SDM630 Zero Export Meter Installation
7:29
Просмотров 87 тыс.
How To Access Any Forked GitHub Repositories Data
9:31
New SMA Sunny Boy Smart Energy Inverter
12:39
Просмотров 3,9 тыс.
РЫБАЛКА ДОМА
0:17
Просмотров 7 млн