Finishing the crawlspace backfill after 313 loads of clay. Finally got all the clay in place and tracked in around the crawlspace. After 243 loads were trucked in and the 70 loads I moved with the Hydrema it's up to the rough grade and ready for the framers. I also graded the area where I cut out the first 70 loads and cleaned up the fire from when I cleared the brush. It will be after the beginning of the year before I get back. I may end up building the retaining walls over the winter. Thanks for watching! #EliteEarthworks #Takeuchi #crawlspace
1 окт 2024