Тёмный

Grimsby corporation bridge. April 2023. 1st opening during restoration works. featuring Ross Tiger. 

shauns auto repairs
Подписаться 1,6 тыс.
Просмотров 138
50% 1

This can be searched on wikopedia...
Corporation bridge. Opened in 1925 after replacing the previous swing bridge from 1872. This bridge is now not used due the docks being closed. Last opened in the early1990's to allow two boats into the docks for permanant mooring, The ross tiger (museum) and the ps Lincoln castle (restaurant). The bridge was initialy restored in the 1980's. In 2016/17 repairs were carried out but they were unable to lift the bridge at this time. recent restoration started in febuary 2023 and is planned to take 11 months costing an estimated 5 million pound split between the dept of transport and North east lincolnshire council.
The Ross tiger can also be googled, A grimsby side-winder trawler from the 1950's. The last survivor of its type. In later life it was sold and used as an oil rig support vessel before being donated to grimsby town to be used as a museum for the sum of one pound.

Опубликовано:

 

16 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии    
Далее
The Future of Brawl Stars in 2025!
04:27
Просмотров 2,3 млн
PS Waverley and Hovertravel - 14/09/2024
12:46
North Bridge Opening
5:10
Просмотров 5 тыс.
SHIP'S CRANE FAMILIARIZATION
20:09
Просмотров 73 тыс.
Car Transporter Arriving Grimsby
3:56
Просмотров 4,3 тыс.
Salford Docks and Manchester ship canal
8:19
Просмотров 28 тыс.