Gigafactory Texas! This is where Model Y’s, and Cyber Truck production happens and soon, the Next Generation Car!
First day of the 3rd Quarter and it was a beautiful day to fly! Most of the work was concentrated on the south end extension area, the east and north sides of the casting machine section of the main factory and the Boring Company tunneling site on the west side of the highway.
Timestamps:
Drone flight overview with discussion & illustration: 0:06 to 2:27
Drone flight footage & infographics: 2:43 to 27:38
In the video introduction, I provide some news and updates on the Cybertruck, particularly the Gray interior, when production of that interior began, a video of a customer delivered gray interior Cybertruck, updates on the Foundation Series production and delivery plans for Tesla (which have recently changed) and more!
On the south end, crews continue to work on the cooling plant on the southeast side, with more exterior cladding installed, work on the ground level machinery and electronics, trenching for the large underground water pipes that will provide the coolant for the plant, and additional work to complete this structure.
On the south side, crews have drained water out of the three underground tunnels and seem to be preparing rebar for the pile caps on top of the tunnel ramps with the screw-type piers. window installation crews were busy near the southwest angled corner installing trim pieces to finish out the glass installation while on the roof, crews were busy installing more insulation on the roof segment above the supercomputer cluster area. This roofing is noticeably of different materials and installation as compared to the rest of the Giga Texas roofing materials and weatherproof membranes.
On the east side of the casting machine section of the main factory, we see crews working on the slab mounts for tanks and equipment on the south side of the steel assembly and on four formed sections for concrete walls on the north end. Further north, crews were buys trenching in the dirt section where storm water pipes and concrete vaults were being installed. concrete forms and rebar have been placed around the south slab to complete the concrete apron.
Thank you for watching and I hope this has been informative, educational, and entertaining for you. If you would like, please consider supporting me via Patreon (link is in the description of this video and in the video itself) so I can continue to make and share these incredible videos.
Follow me on
Patreon / joeslastchancegarage
X @JoeTegtmeyer
Instagram (Joe’s Last Chance Garage) for the latest updates: #joeslastchancegarage
Facebook Joe Tegtmeyer and Joe’s Last Chance Garage
Be sure to check out additional Texas Gigafactory footage on these channels:
@Jeff Roberts
@Brad Sloan
Video, photos, illustrations, and commentary on this video is by me, Joe Tegtmeyer unless otherwise annotated.
Music in this video is obtained from the RU-vid free and unrestricted and royalty-free use library. Ending song is Mr. Sunny Face - Wayne Jones
Drones used are DJI Mini 2, Mavic Air 2 & Air 3.
Drone flight over Giga Texas is with permission of Tesla and CEO Elon Musk

Опубликовано:

 

5 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 124   
@gtbproductions1
@gtbproductions1 3 месяца назад
Hey Joe. I've been following you since mid 2020 shortly after you started production Giga Texas. I really enjoy going back in time and looking at the progress of this amazing facility and what it took to get it to where it is today. Thank you for all your hours and hours of dedication 👍
@JoeTegtmeyer
@JoeTegtmeyer 3 месяца назад
🤗👍
@DessieDoolan
@DessieDoolan 3 месяца назад
Thanks Joe 10:06. Cathode, east. Apron. Truck load of 7 identical grey cabinets. Part of a cathode production line perhaps. 10:42. Cathode, east. Apron. Yellow equipment at the corner. Pumps, filters, compressors perhaps. 12:02. Windtunnel. Green generator is gone. Against the fence in dark green are a pair of what might be electrical cabinets. 2 new small concrete pads closer to the windtunnel. Permanent electrical supply. 12:26. Old EOL staging yard. Some private vehicles in amongst these. Reflective windshield sunscreens, a white wrapped Cybertruck, what might be a Model S with chrome trim. 13:12. Southend, east pond. Open end of pipe in the top right corner would be for monitoring for any seepage under the pond liner. A way of checking for leaks in the liner. Black plastic placed on top of the berm. Unloading location for tankers. Was an identical arrangement at the now demolished evaporation pond. 16:02. Southend, roof. Additional layers of insulation boards being placed over a black material. Felt perhaps. No indication of fixing, adhesive or mechanical of the insulation boards. Top layer is a heavier material, as seen be the effort required to push the trolleys at 19:10. Gravity might still not be enough to hold the top layer in place. More work coming. 17:55. Southend, Cooling Tower. Backfilled the deep excavation under the platform. Change of plans. 18:46. Southend, south. Fire escape passages. Rebar for the walls is on the ground to the left, laying on its side. 21:02. Westside, old contractor parking lot. TBM welded on lifting lugs. Probably nothing more practical than this. Any recessed lifting points would lessen the amount of space within the TBM, where space is already at a premium. 21:29. Westside, storage. Lower half. Speculating all this gear is for the baghouse. 24:29. Westside, Tunnel Project. Grout batch plant dismantling. 26:08. Westside, Tunnel Project. Road decks to the left are rough compared to the liner rings on the right. The road decks were being formed up in simple timber forms at Bastrop. Referring to the mating surfaces, not the deck that will be asphalt topped.
@JohnOffringa
@JohnOffringa 3 месяца назад
Hey Joe, I recently was in Bastrop Boring Co. and discovered Starlink has a lot of equipment leveling the land for building 2 which is going to be just like building 1. It's rumored to be the new manufacturing site for the model 5 antenna. There is reportedly going to be 7 buildings in a row on that side of the road. Also, the really big news is the new slab being poured next to the Boring Bodega. This is rumored to be the new X (formally Twitter) building. Supposedly it will house 600 employees. Unknown if this will be global headquarters or a regional office. When you look at the slab it appears this will be at least a 3-story building. Looking forward to your next video of Bastrop and thank you for all the excellent reporting. You're the best!
@reddog9978
@reddog9978 3 месяца назад
the equipment pads in the bag house are typically refered to as housekeeping pads
@wellspj2002
@wellspj2002 3 месяца назад
Maybe Tesla should demonstrate the cyber trucks self driving ability by sending a command to the trucks parked in the staging lot and have them park on the top level of the parking garage.
@pauleklink
@pauleklink 3 месяца назад
Thank you, Joe!
@JoeTegtmeyer
@JoeTegtmeyer 3 месяца назад
You're welcome Paul!
@johnlynch5007
@johnlynch5007 3 месяца назад
As an investor in Tesla the longer that Tesla can produce sell and deliver Foundation series Cybertrucks the better. It is like a free 20k bump in margin on the truck.
@lindagauntt4712
@lindagauntt4712 3 месяца назад
Reply WELCOME TO JULY 1st -2024
@Fous1978
@Fous1978 3 месяца назад
next quarter 25k Cybertrucks is achievable
@ericanderson3534
@ericanderson3534 3 месяца назад
Im holding off buying a Cybertruck until the $80k version is released. Since there is no FSD yet I can wait and it makes me think that perhaps they are waiting to released the $80k version until FSD is released onto the Cybertruck in December 2024.
@benguthrie49
@benguthrie49 3 месяца назад
Thanks Joe
@JoeTegtmeyer
@JoeTegtmeyer 3 месяца назад
👍🤗
@peteregan3862
@peteregan3862 3 месяца назад
Love Dessie Doolan's comments. I think there is a simple solution to the welding of lifting lugs on the TBM shield. However, it is more parts, and this machine may not be used again.
@DessieDoolan
@DessieDoolan 3 месяца назад
You're most welcome!
@DR.LingeringFrey
@DR.LingeringFrey 3 месяца назад
What amazing drone skills! Thanks!
@JoeTegtmeyer
@JoeTegtmeyer 3 месяца назад
Thx! 🤗
@MikeCasey311
@MikeCasey311 3 месяца назад
Excellent Channel.
@dmpease01
@dmpease01 3 месяца назад
At 8:50, one can see some condensation on the evaporator indicating that gas is being used.
@lourdessilva6442
@lourdessilva6442 3 месяца назад
Maravilha de documentário conhecimento e vida es o verdadeiro sonho de consumo de todos
@DavidJohnson-tv2nn
@DavidJohnson-tv2nn 3 месяца назад
Thanks Joe! Rooftop cable trays: @ 16:33 Excellent close view of the south end termination. Where the medium voltage (MV) cables @ 24.9 kV will go through ducts in the roof of the data center. The purpose of the approximate 4,200 foot (as measured on Google Earth) double stacked cable tray run is obvious. 😊 @ 4:56 (bottom left) Joe accidentally just missed one of the north end cable tray termination points about 75 feet back to the south. Where some cables are diverted off the cable tray run to go through ducts in the roof, likely on their way to the existing main switchgear room. Also the point where the existing main power duct-banks enter the building. @ 5:06 (Top left) You can see the north end of the cable tray run. Where power will be picked up from the new duct-banks being constructed. So to conclude... The south end of the cable tray run ends at the data center. However, the north end has two end points. The north end o BIW, and the north end of casting. Both areas where power is entering the building, and will be entering the building. Fiber optics: @ 19:52 Joe... If you have time... Any chance you can take a peek on the other side of the river to see if they are laying orange fiber optic conduit over there? Just a guess that they are going to do a HDD bore under the river.
@DavidJohnson-tv2nn
@DavidJohnson-tv2nn 3 месяца назад
@ 16:33 Just want to add that there could be as many as 72 cables going through those 4 cable ducts in the data center roof. That is.... If all new power (24 three-phase circuits) from the new duct-banks being constructed on the north end is sent to the south end. Even more cables if additional power is diverted from the existing main switchgear room.
@jbbuzzable
@jbbuzzable 3 месяца назад
What do think about the current progress? It takes a large investment to finance a project like this.
@DavidJohnson-tv2nn
@DavidJohnson-tv2nn 3 месяца назад
@@jbbuzzable Current progress? Good in some areas, terrible in others. They seem to just stop working on some things for weeks or months at a time. More important.... How many projects like this could have been built with the $56 billion the CEO wants to be paid? And how many workers could have kept their jobs? And how many new products could have been developed? Those are the questions you should be asking yourself.
@benguthrie49
@benguthrie49 3 месяца назад
David, Ideally we should see the fiber coming in via 2 different routes
@DavidJohnson-tv2nn
@DavidJohnson-tv2nn 3 месяца назад
@@benguthrie49 Agree. Fiber is coming from the north and I'm speculating that it will come from the south as well, via an HDD bore under the river. What I'm surprised about is what appears to be vulnerabilities in electrical power supply. Yes, there are two duct-banks, and two cable trays bringing in power. But there is lack of physical separation. @ 16:33 you can see how close the cable trays are to each other. Unless they are counting only on UPS units and backup generators?
@N47X
@N47X 3 месяца назад
The cables running atop the new cyber factory are actually part of an innovative salmon transit system. These fish need to access the factory's supercomputers to perform complex calculations for their annual migration patterns. The elevated cables help the salmon bypass the building, ensuring they arrive at their digital destination efficiently and on time.
@DessieDoolan
@DessieDoolan 3 месяца назад
Cyber-salmon!
@hollywoodkw3206
@hollywoodkw3206 3 месяца назад
💯
@duanelawrence4311
@duanelawrence4311 3 месяца назад
That pond with lining is a cooling pond for the cooling tower for the computer center. The pond next to the cooling tower
@garyhenderson8178
@garyhenderson8178 3 месяца назад
As always, awesome video and very awesome descriptions. Thank you for sharing your work.
@JoeTegtmeyer
@JoeTegtmeyer 3 месяца назад
Glad you liked it! Thank you!
@peteregan3862
@peteregan3862 3 месяца назад
They need slots in the top of the TBM shield for the lifting hooks. Then they need some slot fillers that bolt to the inside.
@JtM8292
@JtM8292 3 месяца назад
🙌 .. Hey joe 👋 ! Been watching sense you started 📽 GIGA TEXAS 🤗 ! Was wondering sense you've been videoin for so long do the workers ever notice and wave at the drone lol ??
@Fous1978
@Fous1978 3 месяца назад
Do you see expansions/area layout being completed in 2024? Since this is the end of quarter a Corpus Christi update would be nice. It shows an acceleration as well. 2024 seems both will be ready
@carrtb
@carrtb 3 месяца назад
Thank you Joe! Good news on the Tactical Grey interior. Hoping the same goes for the alternate Core wheels with All-Season tires too.
@PhillProbst
@PhillProbst 3 месяца назад
I suspect the slowdown in Model Y output may have something to do with the upcoming switch to the Juniper upgrade. Probably don't want to build up too big of a backlog of the current version.
@rollincampbell1
@rollincampbell1 3 месяца назад
The racks are cable trays to provide power for supercomputers. Also, I presume transmit and receive signals from supercomputers to video data storage computers for training purposes.
@DavidJohnson-tv2nn
@DavidJohnson-tv2nn 3 месяца назад
Correct on cable trays supplying power to the data center computers. Communications will likely be via fiber optic cables run through the orange conduits now being laid on the westside of the building.
@franklinmargolis2051
@franklinmargolis2051 3 месяца назад
For sure all that excavation on north side went to megapacks. Need uninterrupted power to data center. Reboot would be a nightmare.
@DavidJohnson-tv2nn
@DavidJohnson-tv2nn 3 месяца назад
@@franklinmargolis2051 Correct that they need uninterrupted power at the data center. However, that will come from UPS units and likely backup diesel generators as well, located in the data center. Why? The Megapacks are not set up to provide the necessary power, or do it quick enough. Plus they are too far away for reliability. For example, if anything were to happen between the Megapacks and the data center, the Megapacks would be unable to provide power. The new duct-banks being constructed on the northside connect to the substation via Mega-vault. Which can be seen on Joe's 4/12/24 video at the 23: 54 timestamp (Bottom right).
@jeremyarnold1592
@jeremyarnold1592 3 месяца назад
Thanks!
@JoeTegtmeyer
@JoeTegtmeyer 3 месяца назад
@@jeremyarnold1592 thank you very much Jeremy! Happy 4th of July!
@forwardthinkingtrucker
@forwardthinkingtrucker 3 месяца назад
The batch plant is no longer Martin Marietta. It's now Texas Concrete
@DessieDoolan
@DessieDoolan 3 месяца назад
Part of Texas Materials it seems. Webpage shows the plant as 'Green Concrete Plant 13101 Harold Green Road'. They need to update the address. When did MM sell up?
@forwardthinkingtrucker
@forwardthinkingtrucker 3 месяца назад
@@DessieDoolan about 4 months ago. Martin Marietta sold all its plants in San Antonio and Austin metro area
@DessieDoolan
@DessieDoolan 3 месяца назад
@@forwardthinkingtrucker Is Texas Concrete delivering to the Tesla site, or is all the Tesla concrete now coming from the temporary batch plant?
@TI-hh2nr
@TI-hh2nr 3 месяца назад
18:48 fork lift gets stuck LoL
@paulstubbs7678
@paulstubbs7678 3 месяца назад
Obviously not as flat as it looks from the drone
@acmefixer1
@acmefixer1 3 месяца назад
Forklifts are made to be very heavy, and they have very low clearance and are meant to be driven only on the concrete floors. We had one inadvertently go off the sidewalk and it sunk into the lawn! They had to get a tractor with a bucket to lift it out of its ruts. 🤣🤣🤣
@donovangregg5
@donovangregg5 3 месяца назад
Direct Power directly to the DC is what that Racking is likely for.
@Ripper6962001
@Ripper6962001 3 месяца назад
Cable trays for power to the data centre, imo
@JoeTegtmeyer
@JoeTegtmeyer 3 месяца назад
👍🤗
@bobcallahan2322
@bobcallahan2322 3 месяца назад
At 9:00, it’s the first time I have noticed the 4th vaporizer reinstalled at the cathode nitrogen area.
@DessieDoolan
@DessieDoolan 3 месяца назад
9:00. Missed that.
@hardernl8893
@hardernl8893 3 месяца назад
Not yet frosted but a lot seems to be going on inside. And for some time now.. There is speculation about Cathode going to produce a completely different chemistry (Lithium-Iron_Phosphor - LFP). The original announcement was for high-Nickel (NMC-) chemistries. For the latter I understand there is a benefit for the final calcining step to take place in an Oxygen-enriched atmosphere - hence the LOX storage vessels and vaporizers. But LFP chemistries may use Lithiumcarbonate and/or Phosphate precursors and then there is no need to add Oxygen during final calcining. Maybe all the (early-) work that has been taking place inside Cathode (and completely hidden from the outside world, cheeky, cheeky!!) was to build a new type of production line for LFP cathode material, next to the initial NMC production line(s). The building seems large enough anyway to add and/or modify - for whatever meets the latest developments in battery cell tech. That would explain why there was no hurry at all to supply LOX.
@hardernl8893
@hardernl8893 3 месяца назад
this would also tally with the information that CATL production equipment has been acquired - CATL being the main producer of LFP tech.
@rauckr09
@rauckr09 3 месяца назад
Are they eventually planning for 2-way tunnel traffic? I expected to see 2 tunnels side by side.
@theelusivetruth
@theelusivetruth 3 месяца назад
White cyber truck 12:15
@memrjohnno
@memrjohnno 3 месяца назад
Interest rates are still high and that subdues the market.
@edwardnaclerio7690
@edwardnaclerio7690 3 месяца назад
Any chance Tesla will give you a walk through of the battery cathode, die shop and "Model 2" production line ? I am sure you won't tape anything they don't want you to
@andreandre1051
@andreandre1051 3 месяца назад
Merci👍👍👍
@rudivandoornegat2371
@rudivandoornegat2371 3 месяца назад
Maybe the electrical cables in the north and the fiber optic cables in the south will meet at the three mystery tunnels/ramps.
@DavidJohnson-tv2nn
@DavidJohnson-tv2nn 3 месяца назад
@ 16:33 You can see where the cables will go through the 4 ducts in the roof of the data center. Tunnels have nothing to do with it. Their likely purpose is fire escape passages. And yes, the rooftop cables will pick up power from the new duct-banks being constructed on the north end. As well as from the existing main switchgear room at the north end o BIW.
@wolfgangselle4307
@wolfgangselle4307 3 месяца назад
I can imagine that the tunnels later are use to bring equipment into the building when the exterior walls / glass are closed up. And maybe also to bring fresh air into the computer cluster?
@dissaid
@dissaid 3 месяца назад
I'm going to miss my free sample today. Damn it...
@trampfossil
@trampfossil 3 месяца назад
I wonder if they will build a Boring tunnel from Giga Texas to Hutto rail yards?
@jbbuzzable
@jbbuzzable 3 месяца назад
I doubt we will see that happen.
@kennixox262
@kennixox262 3 месяца назад
Watch the value drop like a rock.
@JoeTegtmeyer
@JoeTegtmeyer 3 месяца назад
@@kennixox262 did this get you the attention you were looking for?
@kennixox262
@kennixox262 3 месяца назад
@@JoeTegtmeyer Just look at the resale of Tesla vehicles. Not good.
@Voidroamer
@Voidroamer 3 месяца назад
i think tesla assumes demand for grey interior foundation series will be the same as the white. but wehat they forget is that people that want a foundation series dont really care about waht color it is and have already switched their orders. So far theyve made what, 15k? as they ramp they'll make at least 30k trucks by end of year, or probably closer to 50k. I doubt they'll be able to sell that many foundation series trucks.. But the longer they make me wait, the more issues they work out.. Maybe they'll give the regular truck an actually usable range
@cousinbill5002
@cousinbill5002 3 месяца назад
Joe, there’s a white cyber truck mixed in with the Model Ys in the old lot
@MinusEighty
@MinusEighty 3 месяца назад
At what time point in the video?
@cousinbill5002
@cousinbill5002 3 месяца назад
12:24 ish
@MinusEighty
@MinusEighty 3 месяца назад
@@cousinbill5002 Interesting. Private truck, or are they doing wraps at the factory?
@DessieDoolan
@DessieDoolan 3 месяца назад
@@MinusEighty Lots of private vehicles parked in that lot. There was a Rivian in there a couple of days ago.
@jbbuzzable
@jbbuzzable 3 месяца назад
@@MinusEighty I highly doubt that factory wraps are available right now.
@LightSpirit24
@LightSpirit24 3 месяца назад
I'm wondering did Tesla give Joe teckmeyer permission to fly his drone around their Factory? Because he's flying quite close to the building and normally I would think a company would not approve of that.
@ctank08
@ctank08 3 месяца назад
Why is the exterior mostly concrete and little to no windows on the cathode plant and die shop?
@DarrelWhite-w3l
@DarrelWhite-w3l 3 месяца назад
When will we get fsd??
@TeslaElonSpaceXFan
@TeslaElonSpaceXFan 3 месяца назад
👍
@nickdunn248
@nickdunn248 3 месяца назад
Rack system for solar expansion
@eugeniustheodidactus8890
@eugeniustheodidactus8890 3 месяца назад
I want to see WHITE cybertruck interirors!
@cousinbill5002
@cousinbill5002 3 месяца назад
Looks like there’s possibly a black one also, two cars to the right
@rudivandoornegat2371
@rudivandoornegat2371 3 месяца назад
I'm always amazed and wondering how it is possible that Tesla Road is so busy. There's no road that's going further east to the residential areas.
@jbbuzzable
@jbbuzzable 3 месяца назад
Well there are roads that connect the residential areas, as they would otherwise be pointless. They just don't pass through the property owned by Tesla.
@joblo341
@joblo341 3 месяца назад
TBMs tend to be burried at the end of the job because there is economic way to get them above ground. This job was not "traditional".
@SolarWindsRider
@SolarWindsRider 3 месяца назад
What is different about foundation series, other than a label?
@jbbuzzable
@jbbuzzable 3 месяца назад
Features and price.
@georgedoolittle7574
@georgedoolittle7574 3 месяца назад
So much battery electric plainly in use here clearly the future is now!
@bigtvjunky9119
@bigtvjunky9119 3 месяца назад
Any permits submitted to draw water from the river for the cooling towers? Sandhill uses a combo of river and reclaimed water for their cooling tower.
@jbbuzzable
@jbbuzzable 3 месяца назад
Does Tesla draw water from the river?
@bigtvjunky9119
@bigtvjunky9119 3 месяца назад
@@jbbuzzable Looks like they have permission to use 10 acre feet of river water per year for irrigation and 'recreational' use. I guess the rest of the water the factory uses is 'city' water and maybe some from rooftop rainwater that is saved. I guess the cooling towers are going to use the more city water and might explain the new connections to the water lines by the houses.
@jbbuzzable
@jbbuzzable 3 месяца назад
@@bigtvjunky9119 I would think that river water intended for irrigation and recreation wouldn't be allowed for cooling a data center. I think I would need more evidence.
@DessieDoolan
@DessieDoolan 3 месяца назад
​@@bigtvjunky9119 Some roof water is saved for use in the factory HVAC. Shown in many of the videos from the Cyber Rodeo from 2 years ago. Darren Yoongs' video here for example, ru-vid.com/video/%D0%B2%D0%B8%D0%B4%D0%B5%D0%BE-YdSzYfcK0Uw.html
@bigtvjunky9119
@bigtvjunky9119 3 месяца назад
@@jbbuzzable That's why I was asking if there were new permit requests for river water use for the cooling towers.
@i.musafeer
@i.musafeer 3 месяца назад
It’s Tesla’s birthday today.
@rudivandoornegat2371
@rudivandoornegat2371 3 месяца назад
Yes, I don't know why they use the Monster to lift the pufrock on to trucks.
@jbbuzzable
@jbbuzzable 3 месяца назад
What lift would you suggest they use?
@paulstubbs7678
@paulstubbs7678 3 месяца назад
If you mean at the end of a bore, well then it can match the angle of the TBM and support it as it leaves the ground, then level and lift it for a flat topped truck.
@cousinbill5002
@cousinbill5002 3 месяца назад
Check Video at 12:24 mark
@jbbuzzable
@jbbuzzable 3 месяца назад
Why should I check?
@AbideVibe
@AbideVibe 3 месяца назад
Black CT and a White CT mixed in with the MY's
@ourv9603
@ourv9603 3 месяца назад
I was surprized when Elon wanted to make some cuts that the model Y team was cut so severly as in 2023 the model Y was the top selling vehicle in the world. I did have a thought tho, meybe Elon upped model Y production at another plant to take up the slack. Fremont maybe? !
@astewart1900
@astewart1900 3 месяца назад
Fremont is supposed to be the more efficient factory. It’s probably cheaper to make them there. Plus, maybe Austin is already making internal adjustments to accommodate next gen car and CyberTaxi assembly lines.
@robbiero368
@robbiero368 3 месяца назад
Who else says "Hello Joe" out loud at the start of the video 😂
@jbbuzzable
@jbbuzzable 3 месяца назад
Not I.
@boostav
@boostav 3 месяца назад
The crash testing facility is looking super janky, also the cheapskates are really not burying the low hanging powerlines south of the pond?
@JoeTegtmeyer
@JoeTegtmeyer 3 месяца назад
What do you mean by janky? What power lines do you refer to?
@jbbuzzable
@jbbuzzable 3 месяца назад
@@JoeTegtmeyer I was wondering the same thing.
@JoeTegtmeyer
@JoeTegtmeyer 3 месяца назад
@@jbbuzzable not sure which one but most people think the S end roof was damaged but this not. The remnants of the black curtain make the south end look like it is damaged around the lip of the roof. I’m not sure which power lines are being asked about but if there are the tall power lines along the east side if the main factory, these do not belong to Tesla. Austin Energy owns them and specifically said they cannot be moved.
@Frank-gt7me
@Frank-gt7me 3 месяца назад
@@JoeTegtmeyer He may be asking about the two MV power lines parallel to River Road south of the factory. I seem to recall there were underground ducts run underneath them from near 130 to the HV line ROW a year or so ago, with speculation that those would replace the above ground lines, but the poles and lines are still there.
@boostav
@boostav 3 месяца назад
@@Frank-gt7me Correct, that's what I'm referring to. They had dug up that area a while back and the expectation was they'd bury the lines, considering the expense they've gone to design the south side extension with an all glass facade it's a glaring omission to have not put those underground. As for the crash testing facility it's been left unfinished for a long while now, hence it's looking janky.
Далее
Microsoft Is KILLING Windows | ft. Steve @GamersNexus
19:19
I Toured JerryRigEverything's Factory!
18:41
Просмотров 195 тыс.
The invention that broke English spelling
22:47
Просмотров 334 тыс.
Inside the Kia EV9: Full Battery Pack Teardown
17:15
Просмотров 114 тыс.
Elon Musk - Where AI's Biggest Impact Will Be
15:13
Просмотров 278 тыс.
The REAL Problem with Smart Meters
20:05
Просмотров 555 тыс.