Тёмный

Helpful Hints for Operating Model Railroads: Part 4: Yard and Industrial Switching 

CNLVN
Подписаться 9 тыс.
Просмотров 338 тыс.
50% 1

In Part 4, our hosts Mike Hamer and Chris Lyon take us through a process of bringing a cut of cars into an industrial area with timesaver design on the Lyon Valley Northern and they describe in detail useful approaches to simplify lifting and dropping cars, They explain, classification, blocking, facing and trailing switches, using the runaround and yard leads. Also how to best reduce the number of moves to accomplish the switching task. The video is intended to provide you with some new knowledge or confirm what you know. Having a good handle on these concepts will simplify model railroad operations so that you can go to any layout and feel confident that you can step in and do your part to enjoy the experience of model railroad operations.

Опубликовано:

 

16 июл 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 331   
@csmart287
@csmart287 11 лет назад
Easily the best operations video series on RU-vid.
@73h73373r357
@73h73373r357 7 лет назад
I wish this series would have gone on forever. This is GREAT for beginners.
@CNLVN
@CNLVN 7 лет назад
Thanks. A couple of yeers back I took the railroad down in anticipation of a move. As it turns out we didn't so now I am not sure what I want to do in the future
@alantrains
@alantrains 11 лет назад
Thanks again Mike and Chris. My layout is built, but what I was meaning was to include some of your operating tips into the way I operate my layout. Richmond yard looks awesome.
@RichyArtist
@RichyArtist 2 года назад
Thank you so much Chris and Mike, for a first-time operator, who is yet to build his layout, this has been incredibly helpful. I am looking forward to building my own layout, and using the principles you've shown us in this 4-part tutorial. Have a great Sunday!
@CNLVN
@CNLVN 2 года назад
Glad it was helpful
@paelgin
@paelgin 11 лет назад
I forgot to mention: I found these videos through MRH email. Thanks for taking the time to share the great layout, as well as the thoughts, ideas and recommendations.
@08rabbitstew
@08rabbitstew 11 лет назад
I sent it to a mate who is thinking of a working yard to add to his double loop track. He needs to operate rather than run trains.This explains lots in a simple format.
@jhonny1392
@jhonny1392 11 лет назад
Hi Chris and Mike. Thank you very much for these four videos so informative and educational. Since long time ago that I didn't see such a good videos on UTube. I enjoyed every one of them; especially this one (4th). I think I speak on behalf of all modelers if I tell you that we would appreciate very much to continue with this serie. An excellent topic for an upcoming video would be to explain how to build a switch list and how this one operates a train. Cheers, John from Chile.
@nealmarrison
@nealmarrison 11 лет назад
I appreciate you two putting this video up. It really helped me realize what is involved with switching not only the yard but also industries. I've never been to an operating session and hadn't a real grasp on this portion of our hobby. Thank you guys.
@mercedesumbrella
@mercedesumbrella 11 лет назад
Thanks so much for putting these together guys!
@CNLVN
@CNLVN 10 лет назад
Glad the series was useful. There are lots of ways to do things. These approaches seem to work best for us. Thanks for your positive comment
@paelgin
@paelgin 11 лет назад
Making me smile... 21:52 "He's a railfan. He was watching all along."
@MineMountModels
@MineMountModels 11 лет назад
I am really glad I just spent the last hour watching your 4 part operations videos. Thank you for sharing and taking your time to make these. Keep up the beautiful model railroading.
@alantrains
@alantrains 11 лет назад
Thanks for an entertaining and enlightening hour or so of video Mike and Chris. A great production on operation. Now to figure out how to incorporate the principles into my 11' X 9' layout.
@Harold8532
@Harold8532 10 лет назад
This was the most educational series on operations that I have seen. Thanks for your excellent work presenting this.
@pauldauzart4633
@pauldauzart4633 11 лет назад
Excellent video!! Very informative. Layout looks great. Nice job!!
@TheCamaro5
@TheCamaro5 11 лет назад
Great video guys. Wish I could just come watch for a while. Love seeing that you have real loads in some of your cars.
@CNLVN
@CNLVN 11 лет назад
These are limited edition Ovarland Models (numbered). Rare to find and very expensive. I bought mine new when the limited run was done a few year's back. This is a model I always get comments on and offers. However it's a keeper. It is one of my favourites and I am so pleased and lucky to have one. You need to add your name to the brass wanted sites to get one.
@raymondrion6712
@raymondrion6712 2 года назад
Thanks for the tips,great layout.
@jcThib
@jcThib 11 лет назад
THANK YOU so much for this awesome video. Great layout!
@TJRohyans
@TJRohyans 10 лет назад
Excellent series of tutorial videos! I'm coming into HO Railroading at 42 after spending 20+ years in R/C airplanes and not having trains since I was a pre-teen. I've been learning a lot on model-railroad-hobbyist.com, but this is by far the most informative thing I've seen or read on how a train is operated prototypically. Thank you very much for the effort spent in putting this together!
@CNLVN
@CNLVN 10 лет назад
Glad the videos helped you TJ. Good to see folks getting back into this great hobby. Indeed Model Railroad Hobbyist is a fine resource.
@08rabbitstew
@08rabbitstew 11 лет назад
Very informative and well made. Thank you.
@konradjagosutz8709
@konradjagosutz8709 11 лет назад
Master layout, master job!
@Railroadin818
@Railroadin818 11 лет назад
Very informational, thank you for posting the video.
@djWarp6
@djWarp6 11 лет назад
I liked the video. Thanks for posting...Very interesting!!
@tskone8326
@tskone8326 5 лет назад
These Op sessions are the BEST.... The commentary absolutely Works...
@CNLVN
@CNLVN 5 лет назад
Glad it was useful for you.
@Taskforce1x1
@Taskforce1x1 10 лет назад
I like this layout and even more the informative 4 part video. It clears up alot of questions I have and even more some things I didnt know about track usage management. Keep the videos coming. Thanks
@waltersobchek2465
@waltersobchek2465 5 лет назад
Watched these many times in preparation of building my yard so it may function well during operation. I got the water towers part down cold, but still learning how a yard should work. Great series of videos- thanks for sharing them!!
@CNLVN
@CNLVN 5 лет назад
Great Walter. Cheers to you and glad you enjoy our operations
@BaronvonBavert
@BaronvonBavert 11 лет назад
very good the Yard and the video was very helpful.!!!!! Thanks
@CNLVN
@CNLVN 11 лет назад
Thanks everyone for your feedback and great suggestions. I just finished doing a great interview with David Primeau. He discusses his pre operations considerations, his car card system and the schedules. His Vermont railroad serves as the backdrop for this discussion and points to consider.
@KenPryor
@KenPryor 7 лет назад
Really enjoyed this series. Thanks for doing them!
@CNLVN
@CNLVN 7 лет назад
Your very welcome Ken
@1942mazda
@1942mazda 11 лет назад
I agree. When you are approaching a place of the track where a choice is made to go left/right, you are approaching a facing switch. If you are approaching a place where two tracks become one, then you are approaching a trailing switch, that is, you're merging from one of two tracks to a single track.
@bmdouble
@bmdouble 11 лет назад
cool to see some switching on the small scale.I wish I could grab the cars when I make cuts! A little too heavy,lol. Nevertheless good job!
@Harold8532
@Harold8532 11 лет назад
Thanks for presenting this. It gives me some very good ideas for a small switching layout that I'm designing.
@HightowerLSSD
@HightowerLSSD 10 лет назад
Your video has helped me to understand operations and staging, as it were, on my own layouts. Thanks a bunch!
@CNLVN
@CNLVN 10 лет назад
Hi Thomas. Glad it was helpful
@hntrains2
@hntrains2 6 лет назад
Nice of you to take the time and explain things to some of us out here!
@CNLVN
@CNLVN 6 лет назад
Glad you found the videos helpful. There are so many ways of doing things.
@hntrains2
@hntrains2 6 лет назад
There are lots, by all means!
@4ennout2
@4ennout2 8 лет назад
Fantastic set of video series. I (in the past) never really considered doing much in the way of operating cessions. I thought it would be to confusing and the fact I did not know anything about how to do it. You have explained the session very well. I am still in the building of my layout. I am going to try and incorporate some of your ideas in to it. Thanks for sharing, we'll be waiting to see more. Rick
@CNLVN
@CNLVN 8 лет назад
+MWRR R That is great Rick. Operations makes Model Railroading even more enjoyable for some. Better than just watching them go round and round.
@rubenvillanueva5107
@rubenvillanueva5107 8 лет назад
Excellent presentation, 1 through 4, easy to follow and informative. Gracias!
@CNLVN
@CNLVN 8 лет назад
+Ruben Villanueva Thanks Ruben. I am sure glad you got lots of good ideas from it.m
@henamedthor
@henamedthor 10 лет назад
Great video! Definitely helping me to understand doing more than just running in a circle. Thanks so much for making it. Looks like you have a great layout too.
@CNLVN
@CNLVN 10 лет назад
I am sure that doing some operations will indeed make your model railroading experience better.
@dacuzzz
@dacuzzz 11 лет назад
great video...good info..thanks for sharing vinny
@ARCHLENNY
@ARCHLENNY 8 лет назад
Thank you for posting this, this was great. I learned so much.
@CNLVN
@CNLVN 8 лет назад
+ARCHLENNY Your very welcome. This series has been help to lots of folks and we were so lucky to meet your expectations
@CNLVN
@CNLVN 11 лет назад
Thanks very much for all your kind words. Mike and I wanted to share some ideas and we did these four videos in a single day. By no means did we make sure we had all our I's dotted and T's crossed so horn blast maybe out of wack and bell ringing not quite right but we had to operate and talk and I guess we had problems with the bubblegum chewing in some places. Thanks for the suggestions for future videos.
@CNLVN
@CNLVN 11 лет назад
The nice thing about timesaver trackplans. Doing things differently each time keeps the railroading in this area very interesting. I have seen this area done so many ways. Thanks for the comment.
@BastiaanBlinksma
@BastiaanBlinksma 11 лет назад
Nice switchting and marshalling,.. kind regards from NL
@CNLVN
@CNLVN 11 лет назад
Hi Jasper. I really like Alco's. I lived in Halifax Nova Scotia in the 90's and they were the switcher of choice. One of the joys of model railroading and being a freelancer you can run what you like. I used to have 7 of them but now I have a nostalgic one. Richmond Yard is named after the road where houses were flattened by the Halifax Explosion. I have a few more CN and BN Alco's around the railroad. They are always a favorite when the operators come to visit.
@peterg13
@peterg13 11 лет назад
Great stuff guys. Well done, thank you.
@CNLVN
@CNLVN 10 лет назад
Thanks very much for the comments Alice Lane. I think it is helpful to be a railfan and model railroader when shooting this stuff. I watch so many railfan videos, using the hand held Sony and being natural to move the camera like they do in 7 ideas productions and highball seems to achieve the look of being the model railroad operator moving with your train.
@CNLVN
@CNLVN 11 лет назад
Great question Travis. I usually use the couplers provided and replace failed onest with a Kadee No.5s. I like them because they are durable reliable and inexpensive. All the other kadee couplers are excellent as well for special fittings or realism. Make sure the coupler heights are correct as well. Some may need a shim on the pocket to lower them or a washer on the truck to raise them. Use an NMRA gauge. Make sure you have replacement springs as they get knocked out sometimes.
@DavidAmmerlaan
@DavidAmmerlaan 9 лет назад
excellent series!
@CNLVN
@CNLVN 9 лет назад
***** Thanks David. It was lots of fun producing. Got to run lots of trains.
@thelowmein9143
@thelowmein9143 8 лет назад
Wow bravo, seeing these concepts in action really cleared them up in my mind. I wish I could run with you guys, I'm sure I'd learn a lot!!
@CNLVN
@CNLVN 8 лет назад
+The Lowmein Glad you enjoyed the action. If you are ever in Ottawa Canada just give us a call and I am sure something can be arranged.
@CNLVN
@CNLVN 11 лет назад
Thank you for your reply. Nice to know we are doing a good job of trying to capture real railroading.
@nyg21bd
@nyg21bd 8 лет назад
Great video, thanks for the information and terminology. I will be contructing my own basement two tier layout soon and you gave me some great ideas.
@CNLVN
@CNLVN 8 лет назад
+Willie Beamon Good luck Willie glad the videos were motivating and informative.
@CNLVN
@CNLVN 11 лет назад
I think we are all saying the same thing. What we all say is true. As you approach would be you in the train so I think we can all be satisfied in terms of what needs to be done to get those cars where they need to be. Thanks again for your comments. They are most welcome..
@MainTrack
@MainTrack 9 лет назад
Great video! Thank you for the tips. I subscribed and look forward to more videos!
@CNLVN
@CNLVN 9 лет назад
+Locomotive Mike Hi Mike. Welcome to the channel. Have fun
@tourtravels9006
@tourtravels9006 11 лет назад
What a marvelous design.
@oaklandsdad
@oaklandsdad 11 лет назад
nice vid, love your layout, man I wish I had that much layout space!
@richardhaight8620
@richardhaight8620 8 лет назад
Thanks guys for the great operational video on switching cars. Lots of good information and very well explained. B.T.W. the RS18 sounds great.
@CNLVN
@CNLVN 8 лет назад
+Richard Haight Hi Richard. Always happy to be of help. Ya love the RS18s
@CNLVN
@CNLVN 8 лет назад
+Richard Haight Further to last have a look at this site. home.cogeco.ca/~trains/rrsoft.htm
@frostgfx
@frostgfx 11 лет назад
Awesome bunch of videos and a purpose (operations) built layout. I would recommend a video about dealing with issues like long hood forward ops and the settings on the throttle. I think you could build upon the Freight Yard book from Walthers and perhaps make a PDF booklet of some sort showing your operations principles. Happy New Year!
@jimtrack3786
@jimtrack3786 11 лет назад
Mike and Chris, I just found the Lyon Valley Northern on You Tube and watched your tips on switching in the yard which was very helpful and enjoyable Are you guys in Canada? I am with the Paper Valley Model Railroad in the Appleton area of Wisconsin. I am looking forward to telling my fellow club members about your fine videos. Thanks so much for the friendly generous use of your time in producing these videos. Jim @ Paper Valley Model Railroad
@mikeday62
@mikeday62 9 лет назад
Great set of videos and nice layout!
@CNLVN
@CNLVN 9 лет назад
Mike Day Thanks Mike. I am amazed that this particular presentation has over 100k hits.
@CNLVN
@CNLVN 10 лет назад
Glad it was helpful Harold.
@jimtrack3786
@jimtrack3786 11 лет назад
Guys, I just subscribed. Thanks again!
@CNLVN
@CNLVN 11 лет назад
Thanks for your question. The switcher ends its job at the Richmond lead for the end of the job. The cars to Edmonton were in Classification one and the empity lumber cars were in Classification Track 2 with a short lead. There are many ways to do this switching. This demo was done off the cuff so indeed there could be many ways to each session. Your suggestion indeed is more efficient.
@cnwtrain
@cnwtrain 9 лет назад
Good job guys. Explaining your moves was very helpful.
@CNLVN
@CNLVN 9 лет назад
cnwtrain Nice to see that it was useful for you. Thanks for coming by
@coxsj
@coxsj 11 лет назад
Thanks, nice vid. Not sure I buy all the recommended practices or yard design but good to see how others do things. Interesting to hear the talk about "lifts" and "drops". I'm used to "pickups" and "setouts" from the US but as a new Canadian I guess I need to get used to the local lingo. Thanks again. Nice layout too.
@CNLVN
@CNLVN 11 лет назад
Thanks Brian. Glad it was of value
@Primal67060
@Primal67060 11 лет назад
The hell with Kadee. I stepped away from club standards and refitted all of my equipment with Sergent. No height issues, true scale, operate just like the real thing and are no where neer as fiddly in my opinion. Been workiing on the swap since late 07' and finished last year. It was expensive and time consuming but worth every penny.
@CNLVN
@CNLVN 11 лет назад
Thanks Christian. It took quite awhile to accumulate enough to get that effect.
@CNLVN
@CNLVN 11 лет назад
Thanks Alan. Glad the video was helpful.
@dwayne75
@dwayne75 8 лет назад
Great set of videos for newbies like me, thanks!
@CNLVN
@CNLVN 8 лет назад
+Dwayne Griffiths Your welcome Dwayne. Hope it helps you in your model train activities.
@CNLVN
@CNLVN 11 лет назад
It is a combination of ideas from different layouts as well as some original ideas to make it work in one space.
@bobjohnson6371
@bobjohnson6371 8 лет назад
Great video, thanks for posting it.
@CNLVN
@CNLVN 8 лет назад
+Bob Johnson Hi Bob. Glad you enjoyed Mike and I running trains.
@STiGuy
@STiGuy 11 лет назад
One of the things i like to do @ my personal home layout is what I call the Suprise Box. At some point in the session one person will pick a Suprise Card (we rotate people), and it will have a problem for them to have to overcome. For Example, if the person was operating a Mainline Wayfreight, he/she might get a card saying that their 2nd Loco is now unoperatable, & will need to be switched out for a replacement loco in the nearest yard. I just feel it adds some fun & realism to the operation.
@w.rustylane5650
@w.rustylane5650 8 лет назад
Love your layout. Static cameras put me off. I like the way you move the camera around to show different scenes on the layout. Nice job.
@CNLVN
@CNLVN 8 лет назад
+W. Rusty Lane Thanks Rusty. It is fun to pan almost like the modellers eyes as they operate a layout.
@CNLVN
@CNLVN 10 лет назад
Yes indeed it is important to try and do the least possible moves.
@troysimpson9550
@troysimpson9550 5 лет назад
TYVM Chris and Mike that was very informative =)
@CNLVN
@CNLVN 5 лет назад
Hi Troy, Glad that helps you in your model railroad operations. Cheers
@25mfd
@25mfd 6 лет назад
Really nice vid. I was a switchman for the Chicago and northwestern for 10 years. Spent time on a yard engine. The things shown in the vid are true and correct. The REAL key to being a good switchman I learned, is being able to see as many moves ahead as possible. When switching, think CHESS not checkers. If you can see 10, 15 moves ahead, you will BREEZE through your work. What helps is to plan moves before leaving the yard office. A lot of it depends on experience as well. Your gonna make mistakes. But once you see what needs to be completed and how best to complete it, the switching mistakes will vanish.
@CNLVN
@CNLVN 6 лет назад
Well this is a very much appreciated comment. From a real railroader this indeed makes all of us modellers feel we are operating close to the prototype. Glad you enjoyed the video
@rubenvillanueva5107
@rubenvillanueva5107 6 лет назад
Excellent, and very realistic!
@CNLVN
@CNLVN 6 лет назад
Thanks Ruben. There are many ways to skin a cat however that being said Mike and I find having some principles of operations really helps.
@VE3NMW
@VE3NMW 9 лет назад
Good explanation of things!
@CNLVN
@CNLVN 9 лет назад
Terry Cox Thanks Terry. There are many ways to do things and I am happy this was helpful.
@CNLVN
@CNLVN 11 лет назад
I have a NAR SD38-2. It was used on the Dunvegan Sub as main power on light rail on CNs Northern Alberta line. The GP40-2W can be used in this capacity as well. In recent years these locomotives have been used along with GP38-2 in large yards and short runs.
@greg55666
@greg55666 7 лет назад
This stuff all seems mind-numbingly simple. It is.
@CNLVN
@CNLVN 7 лет назад
Yes indeed. But if you use these basics you will find that yuu can operate the most complex model railroad efficiently
@jasonthomas8602
@jasonthomas8602 9 лет назад
Highly Detailed very cool Info I hope to use some of this on my new Layout I hope to have video up of it soon so you can see it will let you know when its done.
@CNLVN
@CNLVN 9 лет назад
Looking forward to seeing your video Jason. Glad the info helped
@CNLVN
@CNLVN 11 лет назад
Good luck Allen. Your space is ideal for a Richmond yard type design.
@jonessy40
@jonessy40 11 лет назад
Awesome video Very informative Thanks i learned alot
@davecampbell8756
@davecampbell8756 11 лет назад
Good job weathering the cars.
@lukenutterz
@lukenutterz 9 лет назад
As soon as I saw Procor, I liked the video. =D
@CNLVN
@CNLVN 9 лет назад
Luke Nutterz Procor is a very popular road name up here. Carries all kinds of commodities
@CNLVN
@CNLVN 11 лет назад
Glad you liked it Paul
@cheffer57
@cheffer57 11 лет назад
Great stuff
@CNLVN
@CNLVN 11 лет назад
Glad you enjoyed the Show Shane. I am in the process of working on a new video which focuses on Train schedules, priorities and operator considerations for oncoming trains. It will be probably ready in August.
@CNLVN
@CNLVN 11 лет назад
That sounds like a great idea. A friend of mine has a hotbox detector where folks draw random cards for action.
@jimworcester981
@jimworcester981 5 лет назад
Excellent discussion of switching! Very enjoyable! I prefer electric switch motors and uncoupling magnets so as to minimize human touching, but you operate the manual system very well! 😁
@CNLVN
@CNLVN 5 лет назад
The auto system can work well but it does restrict where you couple and uncouple. This is very key on busy layouts with multiple operators. Also means lots of maintenance on cars
@josephjurkovic9116
@josephjurkovic9116 10 лет назад
Can't get enoungh of this layout and operations, Thanks Chris
@CNLVN
@CNLVN 10 лет назад
Joseph Jurkovic Your very welcome Joseph
@CNLVN
@CNLVN 11 лет назад
Yes. This is HO Scale. The rack is perco code 75.
@ShaharShoshan
@ShaharShoshan 11 лет назад
today i have learnd a lot!
@CNLVN
@CNLVN 11 лет назад
The Red band was a safety band that was introduced to increase visability at crossings. This was stopped after a short while when reflective tape was introduced.
@CNLVN
@CNLVN 11 лет назад
See 13:26 of the video. Watch the sequence. The runaround track are two parallel tracks that have switches that join them at each end each with some sort of lead.. This allows you to put cars in one track and run around them to then attach to the cars from the opposite side. This is necessary to put them into some sidings..Good question hope this helps.
@mapexmac
@mapexmac 11 лет назад
Admitting I'm new to switching/yard ops, I'm curious as to why (towards the very end of your demo) the picked-up string/cars weren't used to simply grab the empties which were finally spotted at the lumber yard - shove the empties back to the lumber yard, drop the empties, and THEN go back to Edmonton ONCE with the blocked cars in tow... As it is, the switcher had to make that extra dead-head journey back to the lumber yard to spot the empties AFTER bringing the blocked string to Edmonton...
@CNLVN
@CNLVN 11 лет назад
These short cars carry corn syrup used at bakery on my layout. There are smaller cars still (beer can). The cars are used for high-density liquids. phosphoric acid,hydrofluoric acid, hydrochloric acid, sulfuric acid, caustic soda, salt brine, heavy lube oils,Titainium Dioxide, resins and catalysts, clay slurry, sulfur slurry, fertilizer concentrate and pesticide concentrate
@CNLVN
@CNLVN 11 лет назад
Glad it was useful
@TheRedzGuy
@TheRedzGuy 11 лет назад
Hello there, nice layout you got there.
@CNLVN
@CNLVN 11 лет назад
Yes. The idea comes from a timesaver developed in the US. Jersey terminal I think.
Далее
готовка с Даней🥹
00:59
Просмотров 345 тыс.
LVN PART 2: SWITCHING PORT COAL MINE
26:15
Просмотров 34 тыс.
Model Railroad Yards--Design for Operations
20:01
Просмотров 242 тыс.
[SFS] This is a boxcar that ruined our week.
21:49
Просмотров 63 тыс.
Waybills and Car Cards
10:35
Просмотров 6 тыс.
готовка с Даней🥹
00:59
Просмотров 345 тыс.