We find another awful New Build electrical installation with a Niglon Dual Type A split load dual row consumer unit. EV and PV running through it, no grommet strip, CU not screwed to the wall correctly, 2way light switches with no intermediates, MCBs not sat in the busbar, overheated RCD and more.
Fixed with a CPfuse box dual row RCBO board along with a Myenergi Eddi to go alongside some existing solar panels and battery storage.
13 июн 2022