This video about First stage - Pilot well drilling during the construction works of water pipe using Horizontal directional drilling method.
The water pipe is about 100 meters (328 feets) long, laid at a depth of 4 meters (13 feets).
Horizontal directional drilling (HDD) is a safe method of installing an underground pipeline.
The Second stage of HDD will be in the next video.