Thank you Hanny.I tried merging two tables in Power Query,trying to relate the various Activity IDs,to their various BOQ amounts, but the structure of my excel sheet was distorted , because some of the Activity IDs did not have Cost How do i manage this?
Salam alikom. After creating a baseline, and make an update on my schedule and cost then i discovered that i made mistake in cost loading. How Can change it?