Тёмный

How to Fix Signage on Both Sides of a 100-Foot-Tall Building from a Single Spot (230-ft Boom Lift) 

Alpha Platforms
Подписаться 224
Просмотров 140
50% 1

Signage Company hired Alpha Platforms to place LED lights in signage letters and repair wiring on two sides of a 100’ building located on a busy city street.
To reach the top of the 100’ building towering over 68’ of walkways and lawns, Alpha Platforms deployed A-230, its 230’ aerial work platform with side reach over 115’, while its generous 12’ basket easily accommodated two workers plus 50 lbs of lightbulbs and tools.
After a 10-minute setup, Alpha's IPAF-certified operator seamlessly and safely moved them along the building's glass walls. As a result, the job was completed in six hours from the same setup point. Would you like to know how they could complete the job so quickly?
Read our Case Study: www.alphaplatf...

Опубликовано:

 

5 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии    
Далее
Buying and Fixing a Boom Lift, JLG 80HX 80 Foot Lift.
52:16
Мои РОДИТЕЛИ - БОТАНЫ !
31:36
Просмотров 487 тыс.
Alpha Platforms Telecom Jobs
3:05
Просмотров 722
Riview ZOOMLION BOOM LIFT ZA32J
8:01
Просмотров 2,3 тыс.
Cutting tree bits in the Boom lift 55' high
1:09:56
Просмотров 100 тыс.
Digging Post Holes in Rocks & Poor Soil
21:56
Просмотров 96 тыс.
Scaffolding Training Video
13:08
Просмотров 2,9 млн
41 Cooper Square: Time-Lapse Construction
9:41
Просмотров 37 тыс.
Worlds Tallest Boom Lift 185 Feet JLG 1850SJ
11:17
Просмотров 522 тыс.
To Much Fun! with a Boom Lift!  See how it works!
11:26