Thanks for watching, and good question. I can't speak for this particular crane and situation, but the video I linked here explains our process behind what rope we put on what crane. ru-vid.com/video/%D0%B2%D0%B8%D0%B4%D0%B5%D0%BE-7CEIYBLRdoo.html
Would a new cable installation on an indoor Overhead Crane use a similar installation (after the removal of the old cable) as just described? May I "assume" an Overhead Crane would use "less" cable depending on the vertical distance from the floor to the Crane's Hoist overhead plus the number of Sheaves required? Does the Hoist's Drum have a Reserve Capacity?