How to Make the BEST Gantt Chart in Excel (looks like Microsoft Project!) 

David McLachlan
Подписаться 108 тыс.
Просмотров 1,3 млн
50% 1

⭐️⭐️⭐️ GET THIS TEMPLATE PLUS 52 MORE here: www.etsy.com/listing/11998005...
👍 Ready made and ready to use.
How to make the absolute BEST weekly Gantt Chart in Excel, that looks like Microsoft Project and is easier and better to use! Your managers and team will ask you "Where did you get this from?" and "Can I use it?" because it looks so good when you're updating your project.
Features include: milestone diamonds, automatic Gantt chart bars, automatic counting number of working days, automatic percent complete on Gantt bars, coloured bars for complete tasks and for blocked tasks, and automatic calendar.
Timestamps:
00:00 Gantt Chart overview
01:53 Getting Started
02:31 Creating the Calendar
05:26 Adding lines and borders
06:40 Number of Working Days
07:24 Status drop down list
09:21 Adding milestone diamonds
10:27 Adding the Gantt bars
12:33 Adding the percentage complete on the bars
13:12 Adding the complete golden colour
14:03 Showing blocked items
15:12 Freeze panes for scrolling
#ProjectManagement
All the Project Template Excel and Powerpoint videos: • How to Create Excel an...

Опубликовано:

 

1 июн 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 1 тыс.   
@DubseditionTCG
@DubseditionTCG 2 месяца назад
I can honestly say, my team was impressed when I whipped this out to present the other day
@j.c.7574
@j.c.7574 7 месяцев назад
Here is the DAX for the video. Top row dates: =IF(MONTH(D3-WEEKDAY((D3),2)+1)=$E6-(WEEKDAY($E6,2)+1),K$40,K$4=$E6-WEEKDAY($E6,2)+1) Completed: =AND($H6="Complete",K$4=$F6-WEEKDAY($F6,2)+1) Blocked: =AND($H6="Blocked",$I6>0,K$4=$E6-WEEKDAY($E6,2)+1) Hope this saves future viewers some time!
@JoaoVitorBorel
@JoaoVitorBorel 6 месяцев назад
Thank you so much, you saving lives here Master!
@rosieng679
@rosieng679 6 месяцев назад
Thank you so much for saving my life!
@ahmadfahmimohdhussain3187
@ahmadfahmimohdhussain3187 6 месяцев назад
thanks so much!
@juancarlosesguerra9304
@juancarlosesguerra9304 6 месяцев назад
do you know how i would adjust the formulas if i choose to show every day instead of every monday?
@najafakhundzada807
@najafakhundzada807 6 месяцев назад
just huge respect man!
@odrazleinad
@odrazleinad День назад
Awesome video... applied many of the ideas for my project planner template. Thanks for the really useful content David.
@trustedconsultingllc9902
@trustedconsultingllc9902 Год назад
David, you're a natural born teacher. Very much appreciate your positive and encouraging tutorial on how to do these things for yourself.
@jaredbarber7257
@jaredbarber7257 6 месяцев назад
This video is fantastic and the presenter does an amazing job. David's enthusiasm is infectious and I honestly had fun making a Gantt chart for my project - never thought I'd say that!
@shreyapandey376
@shreyapandey376 2 года назад
Simply amazing! I had no idea excel sheets could look so aesthetic. You've completely changed my life, this Gantt chart is a game-changer!
@vincentgoransson9729
@vincentgoransson9729 Год назад
@@dwightPhoenix How and where?
@meaningofmovementpodcast5996
@meaningofmovementpodcast5996 7 месяцев назад
This is a straight-up amazing walkthrough on how to create a well functioning Gantt Chart. Thanks so much for sharing, it will be put to great use!
@mikekennedy5843
@mikekennedy5843 3 месяца назад
Thanks David, this is one of the best tutorials available for Gantt Chart creation and Conditional Formatting
@billgordy169
@billgordy169 Год назад
David, you're making me look like a genius. This has been so informative and useful. Thanks so much for sharing.
@carolinewarren3587
@carolinewarren3587 3 месяца назад
Thank you, David, for an (almost) idiot-proof tutorial on creating a customized Gantt chart. It took me about 4 hours, but I'm thrilled with the result, and the fact that I can use this template for other projects in the future. Many, many thanks for your help!
@kasperraunholst
@kasperraunholst 2 месяца назад
Such contageous enthusiasm. I love how a square becomes "a beautiful diamond". Thanks a lot for making this one.
@martin3958
@martin3958 2 месяца назад
Your positivity has made excel bearable for me. Thank you
@chantellelavie
@chantellelavie Год назад
Excellent tutorial! Exactly what I was looking for. Thank you for taking the time to create and share it.
@nicholastugume1081
@nicholastugume1081 7 месяцев назад
I am stranded at the addition of ghantt bars. what could be doing wrong
@agluglu8456
@agluglu8456 7 месяцев назад
@@nicholastugume1081 i managed to do that, but i am stucked at the diamond milestone
@kunalpatil1776
@kunalpatil1776 5 месяцев назад
@@nicholastugume1081 same, my ghantt bar isnt visible even after applying the right formula. Some formatting in the later part is not working too. Can someone help - what may be going wrong ?
@hettardsplat
@hettardsplat 5 месяцев назад
Fantastic step by step! Some of the bits went a little quickly so a LOT! of pausing and repalying but I now have an amazing Gantt chart to use across multiple projects! well worth the time invested. One suggestion would be to post the different formulas in the description to make it easier and save a LOT of typing and re-typing when things go wrong.
@simondavis2116
@simondavis2116 Месяц назад
I'm currently undergoing a Site Management course. I've been banging my head against the wall trying all sorts of formulas to get this right. This is by-far one of the best examples of a self-build Gantt Chart, and has become indispensable to me! Many Thanks, David! P.S. I've managed to manipulate a formula to introduce and over run on any particular task! Again Thanks David!
@user-xz3pp1nc5c
@user-xz3pp1nc5c 10 месяцев назад
Great job. I completed the Gantt chart and am very excited to implement it. You are excellent, sir!
@hamodeosso6507
@hamodeosso6507 Год назад
Hands down the most straight forward and visually appearing GANTT chart
@Sali7691
@Sali7691 Год назад
Absolutely amazing and much needed, I was looking for some advanced Gantt chart for. months, and here I got it, many thanks, considering buying your template, looking for some discount !
@eljacoby
@eljacoby Год назад
You have literally SAVED MY LIFE today with this!!!! Thank you!!!!!!!
@user-km4ed1vp5p
@user-km4ed1vp5p 3 месяца назад
What a Gantt chart! Really the best! Thank you so much, David.
@Simon-jg4qf
@Simon-jg4qf 11 месяцев назад
Thank you David, this is incredibly useful as I am a civil engineering student at a university that does not provide access to MS Project regardless of the crazy fees that I'm paying 🤣
@DarthJ2164
@DarthJ2164 Год назад
Absolutely great tutorial and explanation! Your positive energy has made me even more excited to start using this format. I will be updating my project timelines to this format! THANK YOU!
@julianwearne4967
@julianwearne4967 3 месяца назад
This is a top notch tutorial for a top notch product. Appreciate your efforts a lot here David.
@Nicole-deluxe
@Nicole-deluxe Год назад
Ridiculously good!! So well-instructed and helpful. Thank you!!
@docco6767
@docco6767 11 месяцев назад
This is considerably better than the ones in my work. Thank you and your formulas actually work, unlike 90% of the ones on RU-vid.
@PatchedBandit
@PatchedBandit 4 месяца назад
Mine are not working though. "problem with formula"
@prodriver_es5647
@prodriver_es5647 2 месяца назад
@@PatchedBanditI need to change “,” to “;” and worked for me. Hope you solve that problem.
@holidays5476
@holidays5476 Год назад
This is slick - thanks so much! Love your energy into the video. Going to use this for my next project.....people may think I know what I'm doing! :)
@benjaminmangu4833
@benjaminmangu4833 Год назад
😄😄😄💪
@ejvideos07
@ejvideos07 Год назад
Oh my Lord !! This changes everything I do at work. I thought the answer was to use Charts, but this is so much better. Thank you.
@heshamhamoodalshaif9077
@heshamhamoodalshaif9077 Год назад
Amazing, thank you! You taught me more in 16 minutes than my prof did in 4 weeks!
@gelsondiaz198812
@gelsondiaz198812 10 месяцев назад
Excellent work. This tutorial was very easy to follow and easy to implement. As a recommendation you could add the formulas on the description for faster Gantt chart creation and that way we can focus more on the explanation.
@dougmowbray2606
@dougmowbray2606 6 месяцев назад
my thought exactly
@corneking5878
@corneking5878 4 месяца назад
I can't get any of the formulas to work, giving up. Wasted soooo much time trying. Will just buy a project software.
@AmitPatel-123
@AmitPatel-123 Год назад
Amazing tutorial , i was able to successfully create a great tracker using this. Made few tweeks to highlight overdue items status box and remove highlights from gantt chart if status marked as not started. Again thank you so much for this great tutorial , subscribed
@siddhanthkaushik3991
@siddhanthkaushik3991 Год назад
Amit do you mind sharing code for overdue items please?
@jodyswartz2827
@jodyswartz2827 3 месяца назад
Thank you so much for this!! I've created a Gantt chart that my boss will be happy with for a company-wide project! ⭐⭐⭐⭐⭐
@paulocovele6091
@paulocovele6091 5 месяцев назад
Thank you so much David. You saved my life. I appreciate your way of teaching
@dalilas5085
@dalilas5085 4 месяца назад
You are my life saver THANK YOU SO MUCH for the amazing content!!!!!
@dalilas5085
@dalilas5085 3 месяца назад
p/s my team are IMPRESSED with this ganttchart for real !!!!!
@Lilly_roblox_edits
@Lilly_roblox_edits 2 года назад
Hi! I passed my PMP exam with above target in all three categories. Thanks for your videos!
@davidmclachlanproject
@davidmclachlanproject 2 года назад
That is amazing Linda, congratulations! You have conquered a very difficult task 🙂
@s2_p_2524
@s2_p_2524 Год назад
@@davidmclachlanproject Hi David . Thanks for the video , was really helpful . How can I get this template please ? I tried creating it , but getting stuck at the end . Thanks 🙂
@AndreaUK1973
@AndreaUK1973 2 года назад
I’m so so grateful for your wisdom! Thank you ever so much! I can’t wait to start mine!
@sandrabiggerstaff8602
@sandrabiggerstaff8602 Год назад
OK...this is amazing. Thank you for sharing you learning. I work in Project, but sometimes not everyone has project within an organization.
@johnsebastianrozofuentes5796
I am a beginner and it took me about an hour. To be honest, I never thought I would make it, anyway I tried, and I actually made it. It wasn't that difficult because of the way you explained it all. Man, can´t thank you enough! blessings
@davidmclachlanproject
@davidmclachlanproject Год назад
An hour, that's impressive! It took me about a week after work to figure out all the bits and pieces, so: time saved 🙂
@yourfatherofyourmother2035
@yourfatherofyourmother2035 Год назад
@@davidmclachlanproject can you please give us the functions for day per day ?
@faseehaneil3809
@faseehaneil3809 10 месяцев назад
​@@davidmclachlanprojecthey David I'm making this right now, an absolute beginner here. I just don't get how to like get that calender thingy. I mean the rows and columns size and height after I how to do that?
@Safari_Secrets.
@Safari_Secrets. 8 месяцев назад
@@yourfatherofyourmother2035 Did you ever find out
@leandros40
@leandros40 8 месяцев назад
Excellent clip, thank you David! Very detailed and helpful. One question: is there a way to edit/ament the chart and have the months broken into weeks and the weeks into dates, and then by using the "Group" function under Date to collapse or expand the cells?
@rafaelcdionisio
@rafaelcdionisio Год назад
Your videos are amazing, they help me a lot in work and school. great work!
@AbeerPervaiz
@AbeerPervaiz Год назад
OMG! i Canno believe this but I made the GANTT CHART and its amazing! Thank you for this tutorial.
@barryluo2011
@barryluo2011 7 месяцев назад
Hello David, thank you for the tutorial, any chance we can switch this into a tracking sheet by days instead of weeks? What are the things we need to modify based on this tracking sheet? Thanks in advance!
@coryrubino8007
@coryrubino8007 Год назад
Thank you for the video, David! Your instructions made it so easy to replicate. Quick question for you. Is it possible to set an estimated completion date(set with diamond on the Gantt chart) for a task, but it fills in the weekly boxes with the corresponding color as the weeks go by? Essentially extending past the diamond in the chart until an actual completion date is entered?
@kevenc
@kevenc 11 месяцев назад
Clearly you are an Excel time genius! Thanks!
@jonstevens7269
@jonstevens7269 2 года назад
This is really good! Can you show how in this example -- John is ready for another task 16 May. How do you add that without losing the previous tracked task? That way, you could forward allocate tasks and the entire year would show a record of time allocation by team member. When the director asks "what have your people been working on all year?".
@prodriver_es5647
@prodriver_es5647 2 месяца назад
It is the same example I requested now hope David give us a tutorial or a template to buy with that issue. I really need it for planning tasks!!!
@Deitzable
@Deitzable Год назад
For the Milestones, none of my conditional formatting is working when plugging in the formulas, and the wingdings aren't showing up. Need help!
@SusanneWatson100
@SusanneWatson100 6 месяцев назад
Simply brilliant. This was the literally fun to create. Much gratitude!
@samglover2708
@samglover2708 Год назад
This is absolutely outstanding and exact what I was looking for. SUBSCRIBED!
@declanhutchings573
@declanhutchings573 Год назад
@David McLachlan if you add this code into it =IF(ISBLANK($B6),TRUE, FALSE) into a rule with the right fills and what not it can hide cells, not in use until task number is add to make it look even cleaner
@greenengineer4363
@greenengineer4363 Год назад
👍
@HuntsmanT22
@HuntsmanT22 Год назад
💀☠💀masterpiece comment. what a genius😏
@kelon_
@kelon_ Год назад
bye
@HuntsmanT22
@HuntsmanT22 Год назад
@@kelon_ good. stay away
@rasishameem
@rasishameem Год назад
Nice presentation
@MRMOTOFOTO
@MRMOTOFOTO Год назад
Took me 4 hours...lol, but that was great. Thanks!!!
@davidmclachlanproject
@davidmclachlanproject Год назад
It took me 2 weeks, so you did well 😂
@EliramNoamOzmos
@EliramNoamOzmos Год назад
This is absolutely phenomenal. Great job.
@Nadiapm2001
@Nadiapm2001 10 месяцев назад
Thank you so very much! I feel so proud of myself...courtesy of your shared wisdom and insane Excel skills!
@ianlynch3594
@ianlynch3594 8 месяцев назад
Hi David, great Gannt chart and very easy to follow and develop, just wondering is there an easy way to make the date dependant?
@hmnc444
@hmnc444 2 года назад
Its crazy how you manage to use excel to create such a complex and useful gantt chart. I can barely get my formatting to work hahaha. Great stuff.
@tsend-ayushtserendavga6948
@tsend-ayushtserendavga6948 2 года назад
A2¹
@flowzone.
@flowzone. Месяц назад
awesome job - one additional need would be a "dependencies" function where certain tasks can be linked and thus influence each others timeline back and forth. Other then that fantastic tutorial and product
@kirandesai68
@kirandesai68 Год назад
Absolutely brilliant, mate. Thank you so much. I learned so much from this.
@paulkelly6446
@paulkelly6446 2 года назад
Nice work. I added the following formula and named range to the ID# so that deleting a task renumbers and keeps the tasks id in order =IF(ROW(id)=ROW($B$5)+2,1,MAX(prev_col_range)+1) named rage id = $B5 and named range prev_col_range = $B$5:B4
@davidmclachlanproject
@davidmclachlanproject 2 года назад
Nice one! 👍
@nyxjrstone7470
@nyxjrstone7470 Год назад
How to change if i want month
@flowzone.
@flowzone. Месяц назад
Hey Paul what cells do you apply this to?
@natassakazepidou6639
@natassakazepidou6639 Год назад
great video; may I ask if you provide the formula where you use to format the dates across the year?
@robertduda4234
@robertduda4234 11 месяцев назад
I think you are asking about 2 consecutive calendar years: How do you sort by start dates if your project spands TWO years?
@bhavitta
@bhavitta Год назад
OMG This is amazing. Thank you so much for these thorough cool tips to make this semi-automated gantt chart. Awesome !!!! 🎉🎉🎉🎉🎉🎉
@therealshaesantana
@therealshaesantana 2 года назад
THANK YOU! Great video to help create an awesome looking and USEFUL gantt chart!
@richardwalton3613
@richardwalton3613 Год назад
Well done. Though it is missing a key component of a gantt chart: Dependencies. The whole purpose of a (complete) gantt chart is to show what tasks depend on what other tasks and what the impact of changing one or more tasks has on the schedule. If your intention was artistic in nature, this is very good. But don't sell this as a gantt chart. Thanks for showing how to build our own sheets. Much more impactful than simply uploading someone else's sheets.
@southcoastsynthesis
@southcoastsynthesis Год назад
I agree. The point of using a tool like MS Project is for predecessors and successors and the whole scheduling engine. Also, summary tasks and other features for navigating a large project schedule. Not to mention resourcing features. Excel might be OK for a very simple task list but I can't imagine running an actual project without something like MS Project!
@robertduda4234
@robertduda4234 11 месяцев назад
See my question about the FOUR types of dependencies.
@danielbarnatt9332
@danielbarnatt9332 7 месяцев назад
I think how important this is depends on the size of the project, Many mini projects can and are managed on excel sheets manually and this automates some of the basic functions of laying out a chart. I find managing an ms project plan cumbersome in pretty much all but the most rigidly defined projects. Equally i often find faults in the ms-project scheduling engine that can put your entire plan out of kilter, meaning you up end spending more time getting your plan to behave correctly than you do actually delivering anything. In the kind of environments i manage manage projects in i need something that is quickly editable on the fly at a whim, without being to concerned with what impact changing one line may have on the rest of the plan. I can make notes against the cells in excel and cater for the dependencies later when i have time. Also in complex changing environments dependencies are always changing , and often things that you thought were dependencies turn out not to be and vica versa. In my experience having a plan that is a little looser in is restrictiveness can actually be helpful for a busy project manager.
@jamessbca
@jamessbca 4 месяца назад
@@danielbarnatt9332this has been my experience as well. Any MS project schedule I create is like a beautiful work of art on Day 1. But I’ve never successfully tracked progress in it. I’ve been developing a “task list” in excel that simply has tasks, estimated hours per task, and a “percent complete” cell, which drives 10 conditionally formatted cells that represent a “gas gauge” - how close to done the task is, From 1-10 Real life is always way more complicated than an MS project schedule. The fact that project doesn’t let me take notes anywhere on the screen just kills me. I’m reinvigorated with the idea of doing this in excel (and keeping it very simple) due to recently working with a very competent project manager who uses a white board and post-it notes. He doesn’t use a computer at all, let alone MS project. (And I just save the excel file with a new date in the filename each time, so I could always go back in time super easily if I ever wanted to…)
@myusernamesucks12
@myusernamesucks12 Год назад
David, Thank you very much. was able to make this from the tutitorial. Really appreicated. Please keep them coming!
@user-ce1qm8lo8t
@user-ce1qm8lo8t 7 месяцев назад
Thank you very much for the tutorial! My head is already aching from working on this Gantt chart. My boss has been requesting it for weeks.
@TKtotheMax
@TKtotheMax Год назад
Hello, thank you for showing us how to do it. would it be possible to copy the formulas into the description so we can copy and past them in and change the cell references. I have tried to type up the formula into the cells and I keep getting error messages. It says it is too long to even try the first one. Thank you
@conoromelia8435
@conoromelia8435 2 года назад
Very very impressive chart. Im 100% going go make one, its 100% going take me hours to do though 🤣
@davidmclachlanproject
@davidmclachlanproject 2 года назад
It took me two weeks to figure it all out and put it together, but I am not the fastest person 😂
@conoromelia8435
@conoromelia8435 2 года назад
Im a project manager and that chart is going to become part of my arsenal. Thank you!
@michaelcupito6832
@michaelcupito6832 Год назад
David, you're amazing. Thank you so much for this. I'm going to put the video on super-slow-motion with my mouse hovering over the pause button and see if I can recreate something like this to fit my needs 🙂
@JesusPerez-sv7ki
@JesusPerez-sv7ki 4 месяца назад
You're amazing! Thanks for sharing your knowledge. You're so kind.
@joshualederhandler6157
@joshualederhandler6157 2 года назад
Great video, thank you! If I want to take the individual days timeline and turn them into weeks across a month, how could I do that?
@Safari_Secrets.
@Safari_Secrets. 8 месяцев назад
Did you ever find out how to do this?
@joshualederhandler6157
@joshualederhandler6157 8 месяцев назад
@@Safari_Secrets. no
@davidc8392
@davidc8392 Год назад
Here's that long formula for anyone that wants to copy and paste instead of taking 30min to try and write it down like me haha =IF(MONTH(D3-WEEKDAY((D3),2)+1)
@johanaxeback
@johanaxeback 11 месяцев назад
I'm afraid it did not work for me to just copy paste the formula.
@johanaxeback
@johanaxeback 11 месяцев назад
Problem solved :-) Human error from my side of course.
@finventureschannel
@finventureschannel 7 месяцев назад
I get and error at ,2. Somehow formula loses D3 after that.
@nmorton100
@nmorton100 7 дней назад
This is great thank you so much. Also, I think it needs a project summary bar on the top 2 rows so you can see at a glance if the entire project is on track or ahead or behind schedule. Also a popup calender when inserting dates into the 'start' and énd' would be good to avoid human error inputting dates. Thanks again.
@madisoncarter9036
@madisoncarter9036 17 дней назад
David thanks so much, really amazing video! I plan on purchasing some of your templates via Etsy. Best instructional video on this topic.
@robertduda4234
@robertduda4234 11 месяцев назад
May I suggest that we organize (organise) a project to incorporate some / all of the desired features: • Critical Path Analysis • Dependencies of Activities • Resources Loading • "What if" scenario calculations • Resource leveling / smoothing • Unexpected loss / delay of a resource • •
@dagwould
@dagwould Год назад
A couple of thoughts: drop down lists maybe on a separate 'tools' sheet: easier to use across tabs and to update. Use a table for the list. % complete only for when the output is countable. Estimates never work. If there is no countable output, the activity is 0% until it is 100%. And 100% means accepted by the PM (and the client). IMO, better to have an expected completion date, so it is concrete and drives commitment on the reporter.
@davidmclachlanproject
@davidmclachlanproject Год назад
These are great ideas, certainly do-able 🙂
@dagwould
@dagwould Год назад
@@davidmclachlanproject David, glad you found my thoughts of interest. One more thought, in my domain, a milestone is a durationless event; I identify a milestone as an activity of zero duration: so start and end dates are the same. They usually come at the end of a sequence of activities that produce a work package or discrete component.
@AndreasBodin
@AndreasBodin Месяц назад
Absolutely phenomenal! 🤩 Thank you very much David. 🙏🏻
@TheHealingCorner-jk9yb
@TheHealingCorner-jk9yb Год назад
best video, got praises from all of the team members, AWESOME VIDEO.
@steffipullely6907
@steffipullely6907 2 года назад
Hey David, just wanted to say that I love what you created. I wanted to ask if you have expanded any further using Gantt charts on excel? For example adding in a critical path or milestones, keeping track of budget used in each phase etc
@morristheman1848
@morristheman1848 2 года назад
Would love to see this as well! Let me know if you found somewhere else to do this
@ksojoel
@ksojoel Год назад
that would be awsome, since the critical path is.. well.. CRITICAL in any project
@paolamorales2751
@paolamorales2751 2 года назад
Do you have a tutorial on how to add dependencies between tasks? Great video!
@davidmclachlanproject
@davidmclachlanproject 2 года назад
Not yet but it's a good idea 🙂 Will get on it soon!
@amjadkataw1172
@amjadkataw1172 2 месяца назад
Thank you so much for a great explanation for a simple but yet very useful method.
@ottertubetv9356
@ottertubetv9356 7 месяцев назад
Thank you so much for the vid again. I was able to generate a daily based version of the spreadsheet by following your tutorial, this is going to be mighty helpful
@sainimadhur
@sainimadhur 2 года назад
Hi @David, Great work. How can we break down the timeline from weeks to days. Your inputs will be really helpful. Thank you for the video. 🙏
Год назад
@David, answer please to this question
@aerolleameermitra1630
@aerolleameermitra1630 Год назад
Do we already have an answer for this? 🙏
@vcanadian1971
@vcanadian1971 Год назад
Instead of +7 change to +1
@jimmietraylor7413
@jimmietraylor7413 Месяц назад
@@vcanadian1971 The conditional formatting formulas need to be changed as well.
@brookepittman8505
@brookepittman8505 2 года назад
This is a great video but for us beginners it goes a little fast. I wish it was a little more broken down in the formatting portions and adding the tasks and stuff. Overall still a great video.
@bexwhiting81
@bexwhiting81 Год назад
Agree. Great video but for a beginner, formatting the cells went way too quickly.
@robertduda4234
@robertduda4234 11 месяцев назад
You tube allows for playback down to 25% to 75% of normal.
@alearrudabotelho
@alearrudabotelho 3 месяца назад
You're awesome! Thanks for all of your advice, David.
@AMindInOverdrive
@AMindInOverdrive Год назад
This is exactly what I was looking for! Thanks a million!
@chloehugaga2203
@chloehugaga2203 2 года назад
Thanks for such wonderful video, but I failed to do the today’s bar. Tried few times with the possibilities on my understanding. Can u teach again on where should I type the formula? Thanks
@ibd991
@ibd991 Год назад
Same place i got stuck because if I put the formular it gives me error. Did you find a way around it?
@chloehugaga2203
@chloehugaga2203 Год назад
@@ibd991 yes. I found the solution. how about you?
@suzanneocchipinti6318
@suzanneocchipinti6318 Год назад
@@chloehugaga2203can you please share it?
@mickholgate3347
@mickholgate3347 Год назад
Hi David, hope you are open for development suggestions, if so @1:22 when you select complete, the progress should ideally default to 100%.
@vcanadian1971
@vcanadian1971 Год назад
I agree…what formula would you recommend?
@raulherrera83
@raulherrera83 10 месяцев назад
Great tutorial! Thanks for the clarity slow pace and disposition!
@user-mf8dm8gk5d
@user-mf8dm8gk5d Год назад
You are amazing, thank you so kindly for taking your time to share this tutorial.
@ipm131
@ipm131 Год назад
Hello and thank you for this video. I am having an issue with trying to get the Gantt bars, the formula =K$4=(TODAY()-WEEKDAY(TODAY(),2)+1) comes back as FALSE. And I am also confused about whether I'm replacing the formula for the weeks in K4 with this one.
@jermainepitter2001
@jermainepitter2001 Год назад
Great question, having the same issues.
@sandropegado7462
@sandropegado7462 Год назад
Great question. Having the same issue.
@ddothill
@ddothill Год назад
The Gantt bar formulae need to be entered as Conditional Formatting rules. If you've created all the dates in row 4, and all the row data you are using in columns C to I, then you need to click on cell K6, then press Ctrl+Shift+End and it'll highlight the range of cells you are testing. Up on the Home menu, click Conditional Formatting, New Rule... then select the bottom rule type "Use a formula to determine which cells to format", enter the formula in the box below, set the Format... you want. Click OK, then Apply, then OK.
@ManjitKaur-fd1jb
@ManjitKaur-fd1jb Год назад
Great video, yes I am having the same issue - please help
@brittneyjasmin
@brittneyjasmin Год назад
Stuck on the step around 9:40 - making it show a u when that date falls within the week selected above. the formula isn't showing any errors and appears to be pulling from the right places but I am not getting the u on the week it should appear (the end date is 4/30/2022 and it should appear in the work week of 25-Apr). I even tried changing the end date to match the week day exactly and it doesn't seem to want to work. Anyone have any tips / advice?
@Gibraltariano
@Gibraltariano Год назад
Hey, did you get an answer or resolve yourself? I also can’t get the symbol to appear.
@feeldulfo9387
@feeldulfo9387 Год назад
manually add the formula, also do the fancy thing formula he said right at the beginning when he just start adding the day and month e.g., 22-Sep
@settyc
@settyc Год назад
Work Around: I inserted a Column for Week Number for the End Date and used this formula =IF($G5-WEEKNUM(L$4)=0,"u"," ")
@juhnniemer9716
@juhnniemer9716 2 месяца назад
wonderful video. I so like that this is very fast but very clear and straight to the point as well. really really cool... thanks so much for sharing this.
@carlo9567
@carlo9567 Год назад
Clear and simple. Great job !
@ClipPixie
@ClipPixie 2 года назад
How can I download this
@goonershezz9714
@goonershezz9714 Год назад
Work smarter not harder 😂😂😂
@frederikloumann
@frederikloumann Год назад
Hi David, great tutorial! Do you know why excel returns "there's a problem with this formula", when I e.g. try and run IF(K$4=($F6-WEEKDAY($F6,2)+1),"u",""). The same also goes for the following formula when trying to add the gantt bars? Best regards
@Gowaz89
@Gowaz89 Год назад
Try using " ; " instead of " , " That worked for me
@melissaround2051
@melissaround2051 Год назад
Thank you, David. You explain every step clear and concise. I now have an awesome Gantt - project planner. M
@angelinamendivil6083
@angelinamendivil6083 Год назад
This is sooo cool! Thank you so much for sharing your knowledge and expertise :)
@MatthiasLeimbach-tj2wm
@MatthiasLeimbach-tj2wm Год назад
You, Sir are one of my favorite human beings!
@IrishBoySF
@IrishBoySF 2 года назад
I was following along fine and then once I got to the milestone integration and with the formulas I got lost. I have tried placing in the exact formula to no avail so I can't go any further with the GANNT creation. :-(
@davidmclachlanproject
@davidmclachlanproject 2 года назад
One thought: if you're not using the "fancy" start date formula, make sure your project date starts on a Monday. This should work with the rest of the formulas!
@IrishBoySF
@IrishBoySF 2 года назад
@@davidmclachlanproject I tried changing the start date to Monday and it still doesn’t work. It’s a shame I really like to look at this chart but I can’t go any further. I spent a few hours designing this and now I can’t use it
@herminiogarcia4303
@herminiogarcia4303 2 года назад
In my opinion, it is the best timeline chart I have ever seen. I need a help on the "Percent Done". The formula of the Percent Done on the Bar does not work for me: =AND($I6>0, K$4 = $E6 - WEEKDAY($E6, 2)+1). Shows an error. Help me!
@Hogidibi
@Hogidibi Год назад
I'm getting the same :(
@jacobashdown8876
@jacobashdown8876 Год назад
same
@jessicakahanek3845
@jessicakahanek3845 Год назад
He never responded did he? I'm stuck on the same thing.
@swapnilkadam6641
@swapnilkadam6641 Год назад
I think that's where almost everyone got stuck...is he going to respond on it or not?
@pietercharle8055
@pietercharle8055 Год назад
had the same but resolved it this way: Added a closing parenthesis for the WEEKDAY function before the +1 in the second argument. Changed the greater than or equal to sign (>=) to just the greater than sign (>) in the third argument.
@officetricks6303
@officetricks6303 Год назад
Insanely helpful and clear. Thank you for sharing this...
@sofiabullock6300
@sofiabullock6300 5 месяцев назад
OMG! Thank you for sharing your knowledge.!! This is amazing, You had helped me SOO MUCH by teaching this !! Thank you for going steps by steps. Amazing Job!
@honeytolani4521
@honeytolani4521 Год назад
You should explain the formulas as well in depth.. it made it very fast.. super difficult to learn for a beginner
Далее
How to Make a Gantt Chart in Excel
12:54
Просмотров 3,6 млн
KO’P GAP ESHAKKA YUK!😂
00:57
Просмотров 710 тыс.
How to Make a Project Management Plan (Complete)
52:43
You Won't Believe These Crazy PIVOT TABLE Hacks!
11:30
Просмотров 657 тыс.
How to Create a Gantt Chart in Google Sheets
10:41
Просмотров 882 тыс.
The ONLY thing you need to pass the PMP?
9:41
Просмотров 19 тыс.
How to Make Gantt Chart in Excel
7:44
Просмотров 515 тыс.
3 Essential Excel skills for the data analyst
18:02
Просмотров 1,4 млн
Tuto Excel - Faire un Diagramme de Gantt
24:06
Просмотров 133 тыс.