Homeowner should have replaced the entire garage floor. Could have stored all that stuff in the house or rented a storage bin and did everything in stages.
I was thinking the same thing. That’s about another 2 yards maybe of concrete? Instead you have a cold joint and patching of the old concrete that won’t last long.
I would like the 184 piece tool set. I would have never left that 3' of old concrete... It would make me sick to have to look at the next to the new floors
Another great video!! Really bothers me that the homeowner went though all that trouble to remove the concrete and left the last few feet of cracked garage floor in place. Anyhow, I would love to have the tool set.
Wife and I were both watching this and commented that the end part (detail work) goes from concrete work to artistry. I was stunned how good it looked with the water on it at the end! Beautiful work. And yes, I want the 184 piece DeWalt tool set.
Another great garage floor pour! I have recommended to many of my friends to watch your videos, so they know what they're getting into when they have work done on their own houses. Also- I would like the 184 piece tool set.
This was a great video David! 👍 I plan to do my garage floor that's currently only 3/4 limestone gravel. You have given me the confidence to do it myself! (Handyman, but haven't done concrete) I plan to rent a mini and remove what's needed and compact it, would you recommend that I get a load of mason sand to spread and compact over it? 4-5" think pour should suffice? Any tips and help is appreciated 👍 I would love that 184 piece tool set