Тёмный

Hydrostatic testing: Performance under pressure 

Enbridge
Подписаться 2,4 тыс.
Просмотров 898
50% 1

One of the final steps on Enbridge's Line 3 Replacement Project is hydrostatic testing of the new line. This involves filling segments of the pipeline with water and pressure testing the line beyond normal operating pressure. “We do that to show that the pipeline has been built to the (structural) integrity needed, and that it will withstand the operating pressure it’s been designed for,” says Megan, a Supervisor for Line 3 Technical Services.

Опубликовано:

 

9 ноя 2021

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии    
Далее
Hydrostatic Testing - Simplex Ep 6
13:40
Просмотров 230 тыс.
Pressure and Leak Testing
5:28
Просмотров 25 тыс.
How Do You Steer a Drill Below The Earth?
14:53
Просмотров 4,2 млн
How to Conduct a Hydrostatic Test on Ductile Iron Pipe
3:31
Flow and Pressure in Pipes Explained
12:42
Просмотров 1 млн
September 2024 MFDA Construction Flyover
6:04
Просмотров 1,2 тыс.