The Chassis is pretty well mocked up now, so, it's time to install the engine before the bike goes over to have the gas tanks fitted. Maybe we'll do the pipes at the same time. This is still "mock-up" procedures, so things might change a little here and there. These are all developments in the building of the Harley Davidson Flathead 80 Project Bike.
4 окт 2024