length : 2.8 km
height difference : 89m + 8m with the waterfall
average slope : 3.18%
water level : 13 cumecs (average)
boarding : Pont Saint-Bruno
disembarkation : After the tunnel, at the abandoned factory
chronology :
0:00 : approach walk. Generally it is slippery and falling is dangerous.
0:16 : American-style boarding. Height 4m
0:31 : First rapid. can turn to a keeper hole by high water.
0:54 : Technical rapid in a right turn. At high water, a pass opens on the left. Portage and scouting on the left bank.
1:42 : Funnel against the left wall.
2:00 : Sequence ending on an S shaped. Be wary of potential trees on the left/middle line.
3:10 : Narrow right pass. Be wary of potential trees. There is an escape on the left.
6:03 : Artificial structure with threshold. Stop and scout from the left. Be wary by high water, there is a prison eddy on the right.
7:06 : Sequence ending on 2 slope breaks. aim to the right.
7:52 : Artificial double threshold. Potentially keeper holes.
8:03: Massive tree, partially cut to the left by Paul. Thanks to him.
8:31: Arrival followed by artificial fall of 8m
Detailed GPS description of the section (activate slideshow mode and navigate with the arrows): earth.google.com/earth/d/16az...
31 июл 2024