In the current TT,Extension to Mangaluru is difficult as Mangalore has no space and the train doesn't have enough time to go to Mangalore and return to Trivandrum.
In the current TT,Extension to Mangaluru is difficult as Mangalore has no space and the train doesn't have enough time to go to Mangalore and return to Trivandrum.
In future split tickets and transfer can be done if trains run on time, state of the art signalling system is needed and once done multiple vb trains can connect anywhere for example Eg TVc-BLr-TPt connect in BLr transfer time 20 mins
Hi tech chaiyhu Anna wayanad New railway line gurinchi okavedio chaiyandi please Anna Karnataka lo una nanjaguda railway station nunchi Kerala lo una nilambur ki via sulthan batheri Inka wayanad midhuga velthundhi e railway line 2010 sanction chesaru