Link bridge removal night work at The Galleries shopping centre, Aldershot.
Great work from Baldwins removing the roof steels.
A lot of prepping was done by the lads prior to this which helped this project go really smoothly, enabling us to safely remove each section as it was lifted down.
Don’t forget to subscribe to follow our Aldershot progress.
18 фев 2022