Manpower Calculation | Manpower Calculation by Takt time 

Raman Pahuja Industrial Engineer
Подписаться 3,4 тыс.
Просмотров 127 тыс.
50% 1

You want to learn Manpower Calculation difference between cycle time and takt time? You Are at right place learn Manpower calculation by using Takt time from Raman.
learn Manpower calculation
learn Manpower calculation in english
learn Manpower calculation in hindi
learn Manpower calculation English
learn Manpower Calculation by Takt time
learn manpower calculation
Learn manpower planning in hindi
Learn manpower calculation formula excel
manpower calculation formula
Learn manpower calculation sheet excel format
how to learn manpower calculation sheet excel format
learn Manpower calculation online
Manpower calculation online tutorial

Опубликовано:

 

25 июл 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 60   
@JitenderKumar-uz1cy
@JitenderKumar-uz1cy 2 года назад
Great sir aise hi video bna k sikhaate raho
@benben5514
@benben5514 5 лет назад
Thanks for taking the time to explain.👍
@Manishvbbk
@Manishvbbk 2 года назад
Very good job doing Raman san....👍
@jhonbrayanyantasravichagua3678
GRACIAS
@dineshnagwekar3173
@dineshnagwekar3173 3 года назад
Good information.
@ratuldhar3628
@ratuldhar3628 4 года назад
If my load pattern is not constant in a single day, in that case how I will plan my manpower?
@SinghTejinder
@SinghTejinder 3 года назад
Very nice 👍
@khentsaludo5162
@khentsaludo5162 5 лет назад
Sir I just want to asko who is the philosopher behind the formula of Manpower requirement? Thanks. Just need for our research.. We put Total Standard Time/ Tak time Instead of the walking time+ manual time. Thanks
@venkateshbabu5505
@venkateshbabu5505 5 лет назад
Total cycle time / tact time = Manpower
@HVS2328
@HVS2328 4 года назад
So this is all about manpower calculation for Manufacturing department. What about other department, let us say quality department? We consider output as no. of parts inspected?
@purushothk1248
@purushothk1248 6 лет назад
first i would thank you sir.......then i have one doubt * how to know about walking time and we want to know to calculate manpower is must na
@RamanPahujaIndustrialEngineer
@RamanPahujaIndustrialEngineer 6 лет назад
purushoth karunanithi we will do time study of the process, either with current allocated manpower or we can use 1 manpower for all processes. And calculate walking time & manual time of that operator for every process
@priyaammu1116
@priyaammu1116 5 лет назад
Sir can u pls told some answers sir.. 1.leadtime, productivity Vs production, throughput time
@RamanPahujaIndustrialEngineer
@RamanPahujaIndustrialEngineer 5 лет назад
Surely i will explain.... You can contact me via whatsapp on my no. 9466549142
@stormiwilfred2797
@stormiwilfred2797 Год назад
Hi, is there any specific name for the manpower formula? Couldn't find it online...
@raneshmishu4338
@raneshmishu4338 4 года назад
what is manual time???working time i understand,
@nikhilsrivastava2401
@nikhilsrivastava2401 3 года назад
Have you included week off ? If no what will be the factor included ?
@sixsigmamania
@sixsigmamania 2 года назад
Hi. If is still relevant. Week off, or sickness leave are usually incorporated in effeciency decreasing availability time. It is important to plan vacations, to not have majority people gone. Does this helped?
@luckyindian4556
@luckyindian4556 6 лет назад
Nice calculation I like it. But one thing I didn't got Total working time = 14+12 how come here ?? Plz explain
@RamanPahujaIndustrialEngineer
@RamanPahujaIndustrialEngineer 6 лет назад
lucky Indian that is walking time, not working time... Still you have query than contact me on my no. 9466549142
@prabhur9960
@prabhur9960 Год назад
How to take cycle time using stopwatch for parallel process
@arjunchauhan499
@arjunchauhan499 5 лет назад
What is meaning of walking time ...??? Plz explain
@RamanPahujaIndustrialEngineer
@RamanPahujaIndustrialEngineer 5 лет назад
That is operator's movement time.
@ranjit3013
@ranjit3013 4 года назад
Non value added activaty
@khentsaludo5162
@khentsaludo5162 5 лет назад
So the Manual Time + Walking Time is also equivalent to the whole Cycle Time of the process? Am I right?
@RamanPahujaIndustrialEngineer
@RamanPahujaIndustrialEngineer 5 лет назад
No dear cycle time is also include auto time...manual time + walking time is the time of operator only. Not machine or whole process
@khentsaludo5162
@khentsaludo5162 5 лет назад
@@RamanPahujaIndustrialEngineer how about the main process + additional steps like putting the products in the bin and getting it from the bin. Is it included as the walking time, since there is no walking included in our process. Thanks
@RamanPahujaIndustrialEngineer
@RamanPahujaIndustrialEngineer 5 лет назад
@@khentsaludo5162 additional processes are the manual time.... Which operator do...
@khentsaludo5162
@khentsaludo5162 5 лет назад
@@RamanPahujaIndustrialEngineer ok sir, so if there is no walking or transportation included in the process the formula will be Manual time over Takt Time only? Am I right? Thankd
@RamanPahujaIndustrialEngineer
@RamanPahujaIndustrialEngineer 5 лет назад
@@khentsaludo5162 exactly then we will consider walking time as zero
@saratkumarp2906
@saratkumarp2906 5 лет назад
If we get 2.1 as no of manpower required then we need to declare no of manpower as 3 and not 2
@SinghTejinder
@SinghTejinder 3 года назад
No Sarat San.. Do kaizens then
@leanmanufacturing4924
@leanmanufacturing4924 3 года назад
Offcourse, It required 3 Manpower in order to meet customer demand, But it is biggest waste to company. So as an engineer need to KAIZEN to reduce 0.1 manpower.
@murbacchiu
@murbacchiu 3 года назад
sorry why are you not accounting the O.E.E in this calculation?
@avijitsaha2775
@avijitsaha2775 2 года назад
What is walking time ??
@baisikkumar7891
@baisikkumar7891 4 года назад
Video kam ka he but English me he
@latestmoviez2023
@latestmoviez2023 3 года назад
How to calculate requirement if i have cycle time?
@leanmanufacturing4924
@leanmanufacturing4924 3 года назад
If you know CT of each process CT, You can calculate Crew size= ( Sum of all process CT/Takt time)
@sixsigmamania
@sixsigmamania 2 года назад
Hi. If is still relevant. It is true that you can calculate manpower.. But you must make sure that CT supports customer demand.
@undrupraveengmail
@undrupraveengmail 6 лет назад
difference between manual time & working time
@RamanPahujaIndustrialEngineer
@RamanPahujaIndustrialEngineer 6 лет назад
Praveen Undru it's walking time, not working time
@undrupraveengmail
@undrupraveengmail 6 лет назад
Raman Pahuja Industrial Engineer thank u sir
@RamanPahujaIndustrialEngineer
@RamanPahujaIndustrialEngineer 6 лет назад
Most welcome dear
@centraljail2923
@centraljail2923 3 года назад
SIR CAN YOU HELP ME IN ASSINGNMENT 01. HIGH OPERATONAL COST DUE HUGE MANPOWER
@RamanPahujaIndustrialEngineer
@RamanPahujaIndustrialEngineer 3 года назад
sure..you can text me on whatsapp
@centraljail2923
@centraljail2923 3 года назад
@@RamanPahujaIndustrialEngineer UR NUMBER SIR
@RamanPahujaIndustrialEngineer
@RamanPahujaIndustrialEngineer 3 года назад
@@centraljail2923 already given in video...anyways it's 9466549142
@microengineering9183
@microengineering9183 4 года назад
Bhai hindi language use karo
@baisikkumar7891
@baisikkumar7891 4 года назад
Bhai Hindi me video uploaded kro, I am an indian
@mariajosephanthuvan4348
@mariajosephanthuvan4348 3 года назад
Hahahaha
@alokytech5636
@alokytech5636 3 года назад
Sir 2,073,600 sec. Kaise aaya h.
@Nitish-singh3801
@Nitish-singh3801 3 года назад
Bro 24 days 1 day = 24 hours 1 hour = 60 minutes 1minute = 60 seconds Total= 24×24×60×60 =2073600
@dmechidea8274
@dmechidea8274 4 года назад
On takt time you are wrong.
@sachinkamble6747
@sachinkamble6747 5 лет назад
Practically not correct.
Далее
Takt time, cycle time and bottlenecks explanation
16:09
Takt Time, Cycle Time, Lead Time
13:50
Просмотров 606 тыс.
Cycle time, Takt time & Lead time in Hindi
13:57
Просмотров 260 тыс.
Efficient manpower planning with bottleneck analysis
4:47
Efficient manpower planning using takt time
3:49
Просмотров 27 тыс.