Тёмный

Model Railway Construction: Laying track across the lift-out bridge 

Dongits Model Railway
Подписаться 2,5 тыс.
Просмотров 6 тыс.
50% 1

A New Year update from Dongits Model Railway, showing the progress of construction over the Christmas period. The four track mainline is laid from the south side of the room across to the north side via the lift out bridge.
Table of Contents:
00:00 - Intro and Review of current situation
00:27 - Detail design, marking out
03:29 - Laying the rest of the hidden track
05:39 - Laying track on both sides of the bridge
07:30 - Soldering rail to PCB sleepers
10:16 - "Gluing" plastic chairs to wooden baulks with MEK
13:50 - Cutting the lift-out bridge back out
15:56 - Completed bridge

Наука

Опубликовано:

 

6 июл 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 15   
@JamesPetts
@JamesPetts Год назад
Audio massively better than previous videos.
@TimsBitsnPieces
@TimsBitsnPieces 7 месяцев назад
You are definitely making headway.... and it is showing.
@ModelRailwayShed
@ModelRailwayShed Год назад
Very impressive bridge great work.
@howardpomfret2950
@howardpomfret2950 Год назад
Bridge is fantastic. Sound very good
@James-ih4gz
@James-ih4gz Год назад
came over from Jennifer's channel this is awesome layout
@chrissouthgate4554
@chrissouthgate4554 Год назад
Good Audio, Thanks
@dundasjunctionmodelr.r-jam8267
Very impressive bridge build , going to subscribe to your channel, excellent details on the build
@samuelmcshane6669
@samuelmcshane6669 Год назад
I am considering having a 2 lane track above my original 3 lanes. What height would you suggest is a suitable height to allow access if anything went wrong on the bottom rails
@DongitsModelRailway
@DongitsModelRailway Год назад
Assuming the lower three tracks are effectively hidden loops/sidings/tunnel, you want enough height to stick your arm in above the stock and below the baseboard supports above. You can get away with less if the distance is short.
@pedros270
@pedros270 Год назад
*Congratulations, explanations and perfect development, A query from Spain, where did you get the base grill for the bridge?*
@DongitsModelRailway
@DongitsModelRailway Год назад
It's part of the kit. The bridge is two of these, side by side: laser-model.store/product/00-gauge-28-711mm-twin-arched-girder-railway-bridge/
@pedros270
@pedros270 Год назад
@@DongitsModelRailway Grateful for the information and contact.
@samuelmcshane6669
@samuelmcshane6669 Год назад
Sorry small spelling mistake
@Andries1963
@Andries1963 Год назад
Your vocal audio is excellent one of the best I’ve heard however if you don’t mind me saying the dead bits of total silence are not so good I personally like a gentle bit of incidental music in the background to fill in as for the context of your video I found it very good , quite informative 👍
@DongitsModelRailway
@DongitsModelRailway Год назад
Thanks. Sounds like I made a good technical decision then, even if not necessarily a good financial one...
Далее
A Surface Mount upgrade for the Train Detector
17:25
Просмотров 1,9 тыс.
135 - How to Design a Lift Gate with Safety Stops
9:08
меня не было еще год
08:33
Просмотров 2,4 млн
3M❤️ #thankyou #shorts
00:14
Просмотров 4,2 млн
Making Trains Part 1: Understanding Coaches
17:14
Просмотров 20 тыс.
How to Master Track Laying on Modular Model Layouts
17:30
Bite Size Bits - Storage siding options
11:53
Просмотров 92 тыс.
I Started my Own Model Railway Business!
14:49
Просмотров 136 тыс.
Rebuilding My Lift Out Bridge (300)
25:20
Просмотров 31 тыс.
Making my lift out - Part 1
14:20
Просмотров 36 тыс.
ОБСЛУЖИЛИ САМЫЙ ГРЯЗНЫЙ ПК
1:00