In this video we show you how we installed most of the points, point motors and associated electrics on the main circuits of our model railway layout.
For this video we took the baseboard top off so we could flip it over and install the motors easily underneath, but for some of the other points this wasn't possible. Much crawling around underneath the boards was required.
We also show you our switch panel and associated wiring and take a sneak peak at a motorised signal, which will feature in a later video.
This completes the track work for the two main circuits, but we still have the goods yard and factory siding to lay, so come back soon to see how we are getting on with that.
The video ends with a running session over the newly installed pointwork.
13 сен 2024