Thanks a lot for the video. This way I can understand that we can change the connection string using parameters. What if I would like to have different environments for DEV, UAT and PRD in Power BI workspaces? Please kindly suggest. If you have any other video for the same please share the same with me.
I think you misspoke at 1:25. You said you were connecting to your dataset, but then you connected to your Azure database. I would really like to use parameters to connect to a different dataset easily. Is that possible? And how can I do it?