Thanks Dale, it should work pretty well with providing a bathroom to the shop. Hopefully with a hundred gallon tank I won’t have to refill it too often.
Do the concrete pad for the Heat Pumps. Will you be placing them next to each other? Makes wiring easier for the mains and local disconnects. Nice table saw.
Thanks Pinks. They will be on small separate pads with their own circuits and disconnects. I kind of have to do that because the refrigerant lines are only 25ft long.