Тёмный

[PART 1] SHIP BUNKERING | COMPUTING FINAL DRAFTS USING TRIMMING TABLE (TRIM AND STABILITY) 

Online Third Mate
Подписаться 4,6 тыс.
Просмотров 23
50% 1

🟥SUBJECT: FINAL DRAFTS AFTER BUNKERING
This is a sample computation using "TRIMMING TABLE" Method on finding the Final Drafts of a ship after Loading Weights, in this case after Bunkering. There are other methods on finding final drafts existing, Gents & Ladies. This is only an example.
Given details
✅A. Initial Drafts
🔵Forward Draft = 12.70m
🔵Aft Draft = 12.80m
✅B. Ship in Saltwater density (1.025 t/m3)
✅C. Fuel Oil tanks to be filled
🔵No. 2 Fuel Oil Tank = +470mt
🔵No. 3 Fuel Oil Tank = +460mt
🔵No. 4 Fuel Oil Tank = +450mt
✅D. Final Drafts after bunkering
🔵Forward Draft = 12.803m
🔵Aft Draft = 13.106m

Опубликовано:

 

9 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии    
Далее
Мой телеграмм: v1ann
00:14
Просмотров 25 тыс.
MONTHLY INSPECTION OF LIFEBOAT - VLOG#15
14:04
Просмотров 10 тыс.
(24/7) Pure White Screen
3:54:44
Просмотров 301 тыс.
RADAR BASIC SETTINGS PWEDE NA MAG THIRDMATE
20:08
Просмотров 12 тыс.
Think Fast, Talk Smart: Communication Techniques
58:20