Watch in less than 2 minutes what takes about 18 hours to complete: Setting up an oil and gas rig. Call Patriot Energy today at (469) 269-5414 and speak to one of our consultants about how you can be a part of oil and gas investments, or contact us online at www.patriotener...
Video transcript:
So how does an oil drilling rig get started anyway?
Here’s the process.
First….after the pad site has been cleared….about an acre…and the mud pit dug out, they drill a six foot square hole and install a 2x12 wooden frame for support.
At the same time, they line the mud pit with a plastic seal. This keeps all the drilling mud contained.
Next, a small drilling rig puts the first bit in the ground in that 6x6 hole….and proceeds to stir up a total….dusty…mess.
This hole is drilled to 40 feet, then re-drilled with a wider bit …. and then the first section of casing is lowered into the hole and cemented in place.
To view the full transcript, visit www.patriotener...
Call Patriot Energy today at (469) 269-5414 and speak to one of our consultants about how you can be a part of oil and gas investments, or contact us online at www.patriotener...
28 окт 2024