We were quite busy wrapping the sealing of the deck up before having some days of rain. We also sometimes forgot to setup the camera, but here's a capture of some of what we got up to on 25 June. Towards the end of the video, it can be seen where some more 12mm holes were drilled where screws were remove, and as per usual replaced with hardwood dowels. We opted to use thick dowels for the places where the hull was clamped onto the ribs. Screw holes were also made at angles pointing towards or away from each other, to make a stronger mechanical bond between the hull ply sheets and ribs / backing supports.
2 июл 2024