Red messages in SCR Part 2 like the first, this will show you a few of them and how to do them. Timestamps: 0:00 Intro 0:18 Too many stations missed 2:31 Too many emergency brake applications
There are 3 red messages that I found: 1: Stop before trying to load. 2: Maximum tilt exceeded 3: Please continue until the train is fully alongside the platform.
I remembered when the 158 was released, I would always go up a little ramp onto a bridge and it would bend and respawn me. Just like when I rounded a bend at 110 mph with my 802 and I would hit the wall.
That happened when I was a TD driving the 319 in a 1.0 version, I was just entering Benton from Port Benton, and then it said Maximum tilt exceeded. This was before speed limits were really implemented.
0:54 It depends on how many stops the route has!! Not always 2. If your doing a long Connect Route like SC to Llyn, it can be up to 6 or 7 or even 9 stops skipped
I found a red message that said “invalid route setting” I was driving a 100mph airlink train from Leighton to terminal 3 and when I Hampton Hargate station, my train despawns
Also turns out if you are idle in a depot for 10 minutes or more you get a redscreen. Got held in Coxly siding for such a long time a few days ago that my train despawned- “Train idle for too long” or words to that effect
There’s also irrecoverable movement control failure, it happens when a junction changes while you’re on it. I think you just basically floor it on the Airlink junction after Morganstown going towards the airport, also it’s probably very rare this way but I got it for crashing into the buffer at Greenslade going 100 mph instead of getting buffers don’t like to be eaten for some reason
There’s also “Brake release acceptance timeout”, basically you SPAD or not reset AWS and when it says release brake don’t release it and hey presto, you get despawned