Тёмный

Restoring Road Subbase with Full Depth Reclamation 

Delaware T2 Center
Подписаться 788
Просмотров 51 тыс.
50% 1

Full depth reclamation (FDR) with cement is used to correct extensive subgrade problems in Cecil County, Maryland.
Roadways that develop widespread structural distresses such as settlement and alligator cracking indicate that the supportive roadway materials are insufficient for the vehicle loads seen by the road, particularly heavy trucks with stopping, starting, and turning movements. Milling and resurfacing no longer yields the expected service life. If the distress areas are limited, full depth patching is appropriate, but when the distress areas become substantial, it is more economical to rehabilitate the roadway with FDR. Moderate expectations for full depth reclamation are 15-25 years of extended life for the roadway (roadresource.o....
Here, you see a roadway reclaimer pulverize the surface asphalt and subgrade materials (bank run gravel, aggregate, sand, clay mix) to generally no more than 1-3/4" size. Hydraulic cement is added at the rate of 45#/SY, based on roadway cores and the geotechnical engineer's recommendations. The wetted material is again mixed with the reclaimer for a homogenous mixture of aggregate, asphalt, and cement. A vibratory pad foot roller is used to initially compact the material, a motor grader is used to establish grade for the roadway (prior to surface treatment), and a smooth, vibratory roller seals the surface and completes the compaction. The target for recovered samples is an unconfined compressive strength of 150 pounds per square inch (psi). The surface can later be paved or receive other surface treatments, such as chip seal.
When distresses are extensive in a roadway section, the traditional route is to remove and reconstruct the roadway, resulting in a substantial use of virgin materials, damaging impacts on surrounding roadways from heavily loaded trucks, unnecessary fugitive emissions, and great expense. FDR minimizes use of virgin materials, substantially reduces emissions, lessens impacts on nearby roadways, and saves money, all while producing a substantial foundation for the roadway.
The Delaware T2/LTAP Center provides direct technical assistance, training, and technology transfer to Delaware local agencies relative to their transportation challenges.
sites.udel.edu...
/ delawaret2

Опубликовано:

 

12 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 13   
@aaronkuntze7494
@aaronkuntze7494 2 года назад
That's incredible!
@DelawareT2Center
@DelawareT2Center 2 года назад
Yep, it's a pretty good fix when you pick the right road.
@aaronkuntze7494
@aaronkuntze7494 2 года назад
@@DelawareT2Center it saves hauling it off & hauling in new aggregate base, that's labor intensive..
@tylerdezan6100
@tylerdezan6100 2 года назад
Sweet vid
@DelawareT2Center
@DelawareT2Center 2 года назад
Many thanks.
@midcoasttractorservice9182
@midcoasttractorservice9182 13 дней назад
Thats a padfoot roller.
@AndreFelipe-js6ok
@AndreFelipe-js6ok 4 месяца назад
Where's the water in process? I don't see the water truck ahead of the rroad reclaimer.
@DelawareT2Center
@DelawareT2Center 3 месяца назад
Excellent question. My recollection is that there had been significant rainfall on the scarified material prior to placement of cement and homogenization. But they still would have come back after grading it to wet it again and then it would be necessary to wet daily for 4-7 days, depending upon the design. That's all a weasel's way of saying, oops, failed to get a shot at a water truck! See this project as well - ru-vid.com/video/%D0%B2%D0%B8%D0%B4%D0%B5%D0%BE-tHRE_LM904k.html - there you see the water truck included.
@jimmymckay73
@jimmymckay73 2 года назад
Where are the results ? Is there a part two ?
@DelawareT2Center
@DelawareT2Center 2 года назад
Part 2 in this case was a chip seal application - see ru-vid.com/video/%D0%B2%D0%B8%D0%B4%D0%B5%D0%BE-MkOI9in9HMI.html.
@Claude88ful
@Claude88ful Год назад
C'est quoi le but du jeu ? Pourrir une route qui était propre, c'est cela ?!
@DelawareT2Center
@DelawareT2Center Год назад
I hope we have the translation correct. Seemed like you asked what was the goal or purpose. A good question. This road had become distressed beyond other pavement preservation methods (i.e., crack seal, microsurfacing) and had subsurface deficiencies. Simply milling and paving would have just put an expensive cover on a poor subbase. This techique re-homogenizes the existing asphalt and the drainage materials under it, mixes it with a small ration of cement and lots of water, creating a stronger foundation for a surface treatment. The result is a less expensive approach than removing all the material and replacing with virgin material. The road should be stable for many years to come and can be sustained with new surface treatment (probably chip seal followed by slurry seal) every 7-9 years. Merci pour la question.
Далее
Why Some Roads Are Made of Styrofoam
15:53
Просмотров 1,8 млн
To mahh too🫰🍅 #abirzkitchen #tomato
01:00
Просмотров 4,4 млн
Pavement Preservation with Slurry Seal
16:22
Просмотров 56 тыс.
Concrete Paving for a Railroad Logistics Center
8:02
Просмотров 338 тыс.
What is Cold In-place Recycling?
3:27
Просмотров 40 тыс.
Heavy Grade. Good Mixing and Rolling Process.
11:35
Просмотров 187 тыс.
What is Full-Depth Reclamation or FDR?
3:01
Просмотров 42 тыс.
Soil Cement Base Course for Roadway Construction
4:36