Future of Plastering - ST-8 Concrete Plastering Machine Overview To examine our Concrete Plastering Machine ST-8, Stanmak Plastering Machine models, visit our videos on our channel and our website. In building construction, the most time and manpower is spent in the plastering phase. In plastering operations performed using machines, an average of 65% more time and profit is provided compared to manual operations. Carrying materials into the building interiors and rooms, mixing them, and applying the prepared mortar to the wall are now completed in a very short time with the help of machines. The mortar mixed in the boiler of the machine installed on the building floor is sprayed directly onto the wall with the help of a hose, thus providing great savings in time and labor.
Stanmak Contact: +90 536 702 70 69 (whatsapp)
www.stanmakmac...
15 сен 2024