Тёмный

The world's tallest pre fab hotel 

TV NEWS.PL
Подписаться 2,2 тыс.
Просмотров 2,5 тыс.
50% 1

Instead of brick by brick, a Polish company is preparing the components for the construction of a new edition to New York's skyline block by block.
DMDmodular, based near the southern city of Krakow, is manufacturing the world's tallest modular hotel - set to be 25 stories and 360 feet (109 metres) tall.
Each of the 168 guest rooms for the Marriott AC Hotel New York NoMad will be prefabricated and sent to the U.S. complete with electrical and plumbing installation.
They will also be fully decorated and furnished down to details such as made-up beds and toiletries in the bathroom.
DMDmodular CEO Ewelina Wozniak-Szpakiewicz said even though modular technology accounts for only a small percentage of the construction market, there is growing interest due the potential for time and cost savings.
Silesian University of Technology architecture professor Michal Tomaszek said modular building technology offered a higher quality of workmanship.
He added that there was a potential drawback in terms of how the modules fit together, but that technological improvements meant this effectively no longer a problem.
According to information published on Marriott's website, the hotel's construction will begin in late autumn this year with an opening date set for late 2020
CEO OF DMDMODULAR, EWELINA WOZNIAK-SZPAKIEWICZ, SAYING:
"The hotel that's being constructed by DMDmodular, here in the assembly hall, will be the highest modular hotel in the world. It will have a total of twenty-five floors of which twenty-one floors will be built using modular technology, assembled on site here in Skawina, Poland."
CEO OF DMDMODULAR, EWELINA WOZNIAK-SZPAKIEWICZ, SAYING:
"Modular technology has been developing for a number of years on the domestic and foreign markets. It represents a small percentage of the construction market. This does not change the fact that this share is increasing, the interest is increasing. This is a result of investors looking for time savings, cost savings, and in some sectors, especially in the hotel industry, exceptional attention to quality."
CEO OF DMDMODULAR, EWELINA WOZNIAK-SZPAKIEWICZ, SAYING:
"Each module must be properly packaged and secured during travel. Quality control of transport is maintained during each trip. The transport conditions are checked each time. The building is transported differently to the United States, the building is transported differently via road transport for example to the Netherlands and differently to Iceland. Each time these conditions are controlled.
PROFESSOR OF ARCHITECTURE AT SILESIAN UNIVERSITY OF TECHNOLOGY, MICHAL TOMASZEK, SAYING:
"Overall, it is a cheaper investment, and of course we're talking about countries where the cost of work at the construction site is high. In this case the costs are definitely lower. Certainly better quality of workmanship because most of these elements are made in the factory, so in short, we're able to take care of every detail. If I had to mention the negatives, I would pay attention to the fact that each joining of modules poses a certain obstacle, especially from the architect's viewpoint, but there are now system solutions for modular construction that allow for each such type of project to be customised and it effectively no longer poses a problem."

Опубликовано:

 

10 окт 2019

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии    
Далее
The World's Tallest Modular Hotel
5:12
Просмотров 344 тыс.
На фейсконтроле 💂
09:41
Просмотров 327 тыс.
80 Year Olds Share Advice for Younger Self
12:22
Просмотров 1,7 млн
Modular Momentum   4 Years into Marriott's Initiative
5:23
SmallVille Student Housing - coming soon!
1:18
Просмотров 2 тыс.
DMDmodular | The World's Tallest Modular Hotel
0:55
Просмотров 16 тыс.
One of the Greatest Speeches Ever | Steve Jobs
10:31