Тёмный

Time lapse of 380ft crane being built at Sequoyah Nuclear Plant 

Tennessee Valley Authority
Подписаться 3,1 тыс.
Просмотров 27 тыс.
50% 1

Work is in progress at TVA's Sequoyah Nuclear Plant to replace the four steam generators in Unit 2. The steam generators make the steam that is used to generate electricity.
One activity shown in this video is the assembly of the large project crane (red crane on left of screen). This crane is more than 380 feet tall. It will be used to make 22 heavy lifts, including sections of reactor shield building dome that are expected to weigh about 160 tons each, two steel containment vessel sections weighing about 16 tons each, four 65-ton sections of the concrete enclosures surrounding the steam generators, and the four old steam generators and the four new steam generators, each of which weighs about 345 tons.
The steam generator replacement project is a complex feat of design, engineering, and skilled craftsmanship and part of ongoing efforts to maintain safe, quality performance and to sustain reliable production of energy for customers of TVA power.

Опубликовано:

 

30 окт 2012

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 12   
@eltoro6688
@eltoro6688 7 лет назад
Those cranes putting the BEAST together ain't exactly small!
@epistte
@epistte 4 года назад
The red assembly crane is a Manitowoc 2250. The crane they are assembling in a Mammoet PTC.
@enthalpy
@enthalpy 11 лет назад
Thanks for the video! Good luck with the SG install!
@cranedude07
@cranedude07 11 лет назад
AWESOME! i have the 1/50 scale model of this beast and its HUGE!
@WimBroerse
@WimBroerse 11 лет назад
Very good video! Thanks for your work and upload.
@DecommMan
@DecommMan 11 лет назад
Like - good video.
@frazier2209
@frazier2209 11 лет назад
nice!
@rahulrao5289
@rahulrao5289 5 лет назад
It's an beast 🤩
@formu1fan
@formu1fan 11 лет назад
Awesome Vid. Will you guys be filming any lifts? those would be great to see as well.
@bigdan45322
@bigdan45322 11 лет назад
How many days did it take to assemble ?
@7249xxl
@7249xxl 11 лет назад
where was this?
@7249xxl
@7249xxl 11 лет назад
about 1 and a half week of not 3
Далее
Watts Bar Unit 2 Video Outreach
14:12
Просмотров 10 тыс.
3 wheeler new bike fitting
00:19
Просмотров 17 млн
FUN&SUN | Update 0.29.0 Trailer | Standoff 2
02:32
Просмотров 979 тыс.
Sequoyah Nuclear Plant Virtual Tour
18:33
Просмотров 36 тыс.
Sequoyah Nuclear Plant Outage Hype Video
1:39
Просмотров 4,1 тыс.
Watts Bar Dam Turbine
1:06
Просмотров 43 тыс.
Sequoyah Nuclear Plant Refueling Outage
1:24
Просмотров 2,6 тыс.
Sequoyah Nuclear Plant Outage Wrap Up Video
1:47
Просмотров 1,1 тыс.
TVA Lineman Apprentice Program
4:27
Просмотров 23 тыс.
We Are Natural Resources
5:49
Просмотров 212
Pat & Ashley Episode 7 - Memphis Part 1
2:39
Просмотров 7 тыс.