Video taken on 11.12.2013 showing the post manufacture and assembly testing of the hydraulic lifting and dropping, side to side and opening closing movements of this Horseshoe type 6300 diameter Tunnelling Form. After more rigourous testing and adjustments the formwork will be disassembled painted and sent to the customer.
For more information see our brochures
Infrastructure Tunnelling Systems - goo.gl/0m11iN.
Tunnel Formwork Systems for Residental Construction - goo.gl/LNMolg
Precast Formwork Systems - goo.gl/LI9C0D
or contact Simon Edge - edge@demaform.com
12 дек 2013