This is Part 1 of this kitchen floor remodel. This was an especially tricky floor, we found the dreaded particle board. Many areas where not level and there was very tough carpet glue. The entire subfloor was removed down to the underlayment. Cement board was installed and varying layers of mortar where used to help bring things into plane. The entire floor area was also layered with a crack isolation liquid membrane. It took longer than expected but we got the perfect surface needed for tile installation.
All the work was completed by Rafael Tile Works
If you are in the Sacramento Area visit our website for a free Estimate
RafaelTileWorks.com
916-800-9672
16 сен 2024