I'm often asked how we cope with bad weather when installing warm roofs. The trick is to use the air vapour control layer as a temporary roof cover at that particular stage. You can strip the roof and then put the air vapour control layer over the new decking and make it not only airtight but watertight to the room down below. You can then leave this area vapour control layer out in the Sun and bad weather for up to 3 months you are using Alutrix 600 can we do. But theoretically two or three days may pass with rain and then you can gain a good weather window and start the rest of the wall roof. You must make sure that everything is dry and the insulation that you are going to install in the warm roof is dry. In the video, I show to 3 different examples of how we do this on large and on small jobs. The air vapour control layer is extremely strong and takes people walking over it without it getting punctured.
#londonflatroofing
#londonroofsurveyor
#steveroofer
Steven Dickinson
London flat roofing
07802300099
info@londonflatroofing.co.uk
Storm damaged roofs in London.
Roof surveys
Roof surveyor
Roof surveyor London
Roof surveys and inspections
Roof consultancy
Roof consultancy and roof condition reports.
Domestic roof survey
Flat roof condition report
Independent roof surveyor
Leak detection roofing
3 окт 2024