All latest videos & tutorials for this renovation are in the home office bathroom course, available with the DIY GEEK MEMBERSHIP (one time payment , that’s it 👊) bathroomremodeling.teachable.com/p/diy-bathroom-geek
Home Reno’s is one area where a robot isn’t going to be doing for at least a century. All those hookups are so subjective based upon experience, accessibility of a variety of components, etc.
It's always easier to set the drain and overflow before setting the tub. Final connection when set.On a new tub.You can struggle with an existing tub on the replumb.You can turn the drain left until it clicks,then turn right.That means it fell in place to align with the threads.
Can that vent for the tub drain run horizontally below flood level rim? Not being a stickler, just curious if I'm seeing that right and if my code is right. Big fan of your videos and your work.
I used one for my American Standard tub I got through Ferguson, I think it was less than $150. One thing I didn't like about it was it was a universal kit designed 40 years ago for many tub sizes, I actually had to cut it smaller to fit my 14" high tub.
Im remodeling my bathroom and the previous builder has incased the sink and toilet plumbing in concrete so i was wondering if its acceptable to have a 90° and about 4 inches pvc level until i start my 1/4 inch slope per foot for the drain.